H92240-18-Q-1000

1. QUESTION:

PWS Pg. 2 Section 4.3: Does this two week period include Sundays as well as Saturdays for 14 consecutive days? Or will it be just Monday through Friday or Monday through Saturday?

106 requires 6 consecutive day per PWS so we need determination if that will use the Saturday at the end of the second week, or the Sunday before it.

ANSWER: Monday through Friday only, no weekends, unless otherwise negotiated at the task order level Requirement has been clarified; reference PWS section 4.1 and 4.3

2. QUESTION:

PWS Pg 2 Section 4.3.1: While every effort will be made to make the minimum 500nm, we cannot guarantee this if a weather or other incident arises. We wanted to clarify this based upon the exceptions statement in Section 4 on page 2 of the Combined Synopsis/Solicitation

ANSWER: Mileage requirement has been clarified; reference PWS section 4.3.1

3. QUESTION:

PWS Pg 2 Section 5 (PWS ref 4.4) ASA Certificates and International Proficiency Certificates cannot be issued immediately upon completion of the course. Students will leave the course with their signed and completed log book. Within 30 days of course completion they will receive their seals in the mail directly from ASA.

ANSWER: 30 days is acceptable. Requirement has been clarified; reference PWS sections

4.4 and 4.5

4. QUESTION:

Will the Navy boat be docked at the Navy Marina base or do we need to account for Marina Fees?

ANSWER: The Government will pay for all marina fees when the Government owned vessel is utilized, unless otherwise negotiated at the task order level.

5. QUESTION:

In the event that we are using a contractor boat, can it be docked at the Navy Marina? Will this be for free or will there be a charge?

ANSWER: Contractor vessels cannot be docked at the Navy marina and the contractor shall be responsible for all marina fees when a contractor provided vessel is utilized, unless otherwise negotiated at the task order level.

6. QUESTION:

Volume II, Item 3 of the Combined Synopsis/Solicitation Page 2: Do we only need the description of vessels to be used in MS or are descriptions of vessels used in other locations required as well?

H92240-18-Q-1000

ANSWER: Description of contractor provided vessels has been removed as a technical submission requirement; reference amended FAR 52.212-1 addendum of the solicitation.

Contractor provided vessels, when required at the task order level, shall comply with requirements as stated in the PWS and the Government may verify compliance prior to course start.

7. QUESTION:

Volume III of the Combined Synopsis/Solicitation Page 3: Please confirm that the ELIN Bxx, Cxx, Dxx, and Exx are referring to the 4 consecutive years.

ANSWER: Yes, the contractor shall provide pricing for all ordering periods in the Attachment 3 – ELIN table; ELINs A001-A005, B001-B005, C001-C005, D001-D005, and E001-E005.

8. QUESTION:

Are we submitting ELINs for MS only? Do we need submit for any of the other locations listed in section 7.1.1 of the PWS under Place of Performance?

ANSWER: Yes, submit pricing for Mississippi only as annotated in the Attachment 3 and Attachment 4 ELIN price submission spreadsheets. Other locations, if and when required, shall be negotiated at the task order level.

9. QUESTION:

Is there a difference between ELIN A001 on Attachment 3 and ELIN A001 on Attachment 4?

These look to be identical.

ANSWER:

The total evaluated price will be calculated from the Attachment 3 – ELIN Table, which provides COI prices that will be firm-fixed price at the Basic contract level.

Attachment 4 – ELIN Table represents just those COIs that will be ordered on Task Order 0001 (2 COIs under ELIN A001).

Provide both attachments with the quote submission.

10. QUESTION:

Attachments 3 and 4: Do you want a summary of the unit price only or are you looking for a breakout of line items?

ANSWER: The quoter is only required to submit the total unit price for each COI. The Government may require additional “other than cost and pricing data” prior to award.