| Number | PWS Section | Question | Response |
| 1 | PWS 4.1.7.1 | Will the government clairify the 500 hours annual estimated LOE for the PM cited in this section? This number differs from the listed hours in Attachment II ELIN Schedule? | Removed. See revised PWS. |
| 2 | RFQ section N.3 | Is it the government's intention for offerors to submit an hourly FFP rate with in Attachment II ELIN Schedule? Or is the intention for offerors to provide a total FFP cost per ELIN? | Quoter shall submit unit price total for quantity (per day) |
| 3 | RFQ section N.3 | In response to the PWS, will the government allow for offerors adjust the LOE within Attachment II ELIN Schedule? | These are anticipated ceiling quantities and not Level of Effort. Quoters are requested to only include Unit Cost and not make any other revisions to the Attachment. |
| 4 | PWS 7.2 | PWS cites "Contractor costs for Government authorized travel are included in this contract." Does this include the application of offeror G&A being applied as an allowable, reasonable and allocable to this contract. As per FAR 31.201-2 and 31.201-4 | This is a business decision of the Quoter. Quoter shall include all considerations within their quote based on the set forth CLIN/ELIN structure. |
| 5 | PWS 3.3 | Will the government provide the LOE referenced as para "4.1.8" as to better define/map to Attachment II ELIN Schedule per LCAT? | References to Level of Effort have been removed from the PWS. Please see revised PWS. |
| 6 | PWS 3.3 | Will the government provide historic annual number of training days requirred for both JTAC Operator and Pilot SME support? XX Days x 10 hours per day of required support. | Due to the nature of the requirement as an IDIQ, historical quantities may not be an accurate reflection of potential needs. |
| 7 | PWS 12.1 | Request the "Evaluator Letter of Designation" be removed as a requirement. As per OPNAVINST 1500.82 page 7-1 "Navy JTAC-I designation letter can be issued by the unit CO." As such this assumes that NAVSOC will issue JTAC-I designation letter to awardees qaulitied JTAC-I's. | Corrected. See revised PWS. |
| 8 | PWS 12.4 | Request the Contractor shall have Conventional Forces JTAC deployed experience be removed from the requirement. | Removed. See revised PWS. |
| 9 | RFQ SF 1449 Block 8 | Will the government please clairfy the RFQ reponse date? RFQ Q&As are due on 24 July 2017 consolidated Q&A document posted to FBO on or around 31 July 2017. | RFQ has been extended. Please see revised closing date/time. |
| 10 | RFQ | Request incumbent data, contract # and type, and previous set aside information | Tactical Linguist Concepts, LLC, H92240-13-C-0023, Firm Fixed Price contract, 100% Small Business Set-Aside |
| 11 | PWS 3.3 | Para calls out paragraph 4.1.8 which is not shown in PWS | Corrected. See updated PWS file |
| 12 | PWS 4 | Shows that services will be provided to NSWG 1 and 2, earlier reference was made to SBT JTACs. Confirm that services will not be provided to any other Naval Special Warfare Groups under this effort? | SBT personnel may participate in training planned and executed by Group 1 and Group 2 |
| 13 | PWS 4.1.1.1 | Confirm requirement is for newly designated JTACs and that folders currently exist for all current/qualified JTACs? | Yes |
| 14 | PWS 4.1.3.1 - 4.1.3.2 | Confirm that these documents may be submitted in "contractor defined" format? | Yes |
| 15 | PWS 4.1.5 | Confirm that annual reviews will be conducted throughout the ordering period but report and recommendations are not required until the end of period of performance? | Yes |
| 16 | PWS 4.2.4.6 | Please define "Authroized Digital CAS platform" as to the actual hardware or system to be used | There are multiple platforms. An example is hand-held Link 16, APASS, ATAK. |
| 17 | PWS 4.2.5 | It appears there is a formatting issue with the PWS. Please confirm that the qualifications listed in 4.2.6 actually apply to the Pilot SME? 4.2.6 lists the separate billet of JTAC Operator/SME as a FAC(A) qualified with flight expereince and a Wep School grad | Corrected. See revised PWS. |
| 18 | PWS 5 | Deliverable 0001 shows Training Folders are to be presented 45 days after award. Confirm that current folders exist for all NSW JTACs and that folders will only need to be created from scratch for newly designated JTACs? | See response to Q13. |
| 19 | PWS 8.1 | Will contractors not be allowed SIPRNET access at Government facilities? It is shown in the DD254 but not shown in the PWS. | DD254 has been removed as an attachment. |
| 20 | PWS 9 | Will the Government provide vehicles or transport with NSW personnel to/from ranges? Since many ranges are on rough/unimproved terrain access with rental vehicles can be problematic and should rental vehicles sustain damage most insurances will not cover the loss on a military training range. | Yes. See updated PWS file |
| 21 | PWS 9.3.1 | "Contractor live fire ranges…" implies that the Govt intends to conduct training on contractor provided ranges? Can the Government confirm this? | No. See revised PWS. |
| 22 | PWS 10 | Statement contradicts the requirement in 11.1.6 for Contractor to provide PRC-148/152 | No contradiction. Govt will provide encrypted radios and vendor shall provide NATO version of radios. |
| 23 | PWS 11 | Will the Government consider providing NVGs as Government Furnished Equipment? | No |
| 24 | DD254 | Blocks 10a and 10h are not congruent with the requirement in PWS 10 for access to Type 1 encrypted radios or PWS 11.1.6 to provide tactical radios. We realize this is a draft DD254 but it should reflect the requirements in the RFQ. | DD254 has been removed as an attachment. |
| 25 | PWS 12.1 | Will NSWC carry/sponsor contract JTACs on a Commander’s JTAC designation letter? | No |
| 26 | There are references / clauses referring to IDIQs/Task Orders/ Incentive Contracts. Please remove any reference and add FFP appropriate language to the solicitation. | This is a Indefinite Delivery/Indefinite Quantity contract with FFP provisions. Clauses are appropriate. | |
| 27 | CLIN Delivery - There are only two CLIN numbers for the entire Period of Performance. | This is a Indefinite Delivery/Indefinite Quantity contract. Orders will be issued against CLINS 0001 and 0002 and in accordance with ELIN Schedule. | |
| 28 | The Government has estimated the travel CLIN 002 at $350,000 annually and the CLIN is FFP. The PWS 7.2 states the travel is to be cost reimursable. | CLIN 0002 has been revised to reflect "COST" type identification. | |
| 28 | This solicitation does not state that it is a Task Order or IDIQ. Please clarify or strike any reference including clauses referring to IDIQ. Please add clauses for an FFP. | Please see revisions to the solicitation to reference IDIQ contract type. | |
| 29 | The solicitation states "to the extent to which the quote is capable of meeting PWS paragraph 8.2." PWS 8.2 is Security. PWS 12 is the qualification criteria. | Please see revisions to the solicitation to reference IDIQ. | |
| 30 | Please clarify which items under PWS 11.1 are GFE and which are CFE? | PWS Paragraph 11.1 identifies strictly Contractor provided materials. | |
| 31 | PWS 12 | Under 3.2 the work will be provided in 3 separate components. Paragraph 4.2.6 also contains qualification requirements. Please consolidate all qualifications and break down qualifications into the three separate components as defined in 3.2. | Qualifications from paragraph 4.2.6 have been moved to 12.7. |
| 32 | Will the Government consider including rotary wing aircraft experience in addition to fixed wing? | As this is an evaluation factor, the Government cannot comment on Quoter business decisions. | |
| 33 | PWS 3.2 | Please confirm that all personnel as outlined in 3.2 are assigned to units at Coronado and Norfolk. Will the government provide office space at these locations? | Locations vary based on training objectives. No office spaces will be provided. |
| 34 | In reference to the QASP, please strike out reference to reduction in payment. | Paragraph 4.3 of the QASP has been revised. |