Attachment_1_-_PWS_Basic_Plumbing_COI.pdf

PDF 105 KB Posted

Attached to
Basic Plumbing Course of Instruction
Solicitation number
H92240-17-T-0025
Issued by

About this file

Performance Work Statement

View the file

Other files

File Type Posted
H92240-17-T-0025.pdf PDF
Attachment_2_-_ELIN_Price_Spreadsheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Naval Special Warfare Command

Basic Plumbing Course of Instruction

1.0 BACKGROUND

1.1 Due to the various and remote locations that Naval Special Warfare Group 2 supports while deployed there is a high demand for NSW support to have a general knowledge of and be proficient in many areas other than their designated Navy rating i.e. Builders, Steelworkers, Electricians, Equipment Operators, and Mechanics.

2.0 OBJECTIVES

2.1 The overall objective of the Basic Plumbing training course is to train NSWG2 personnel on theory and develop their field knowledge of basic pipefitting, basic utilities installation, plumbing tool use and common plumbing practices. This training will be for experienced and inexperienced personnel.

3.0 SCOPE

3.1 The Contractor shall provide the personnel, management, materials, equipment and facilities (not otherwise provided by the government) necessary to ensure all course students complete the course of instruction objectives.

4.0 REQUIREMENTS

4.1 Provide training in the following:

4.1.1 The Contractor shall provide a five (5) day course of instruction for five (5) personnel in a classroom environment. This course will consist of 8 hours of instruction per day – Monday through Friday. Specific course dates will be provided at the Task Order Level.

Dates are subject to change at the Government’s discretion with prior notice to the Contractor within a reasonable time not less than 15 calendar days.

4.1.2 The Contractor shall draft course schedule, detailed curriculum outline, and biographies of intended faculty/instructors.

4.1.3 The Contractor shall provide all materials, manuals, and outlines needed to accomplish the course for up to five students. The Government will provide to the Institution the exact number of students, names and their contact information at least 30 days prior to the inception of the class, as available.

4.1.4 The Contractor shall provide daily syllabus 2 weeks before class begins.

4.1.5 The Contractor shall conduct informal surveys at the end of each class and forward to

NSW Technical Point of Contact within 7 days after course ends.

4.2 Provide training based on the following Basic Plumbing Course outline:

4.2.1 Basic Safety

4.2.1.1 Safety rules / First Aid

4.2.1.2 Hearing / Eye Protection

4.2.1.3 Personal Protective Equipment

4.2.2 Tools and their uses

4.2.2.1 Soldering: Instructors will provide copper fittings, couplings and soldering materials and will instruct the proper techniques of proper soldering.

4.2.2.2 Pipe Threader: Instruct each student the proper technique for loading the pipe into the machine, set the dye to the proper diameter and the proper technique to thread.

4.2.2.3 Plumbers Snake: Instruct each student in the proper technique how to / when to and where to use a plumbers snake.

4.2.3 Blueprint Reading

4.2.3.1 Common mechanical nomenclature: Using standard mechanical blueprints and a print legend, instruct each student as to what each symbol on a mechanical print identifies.

4.2.4 Rough Plumbing installation

4.2.4.1 Sink: Instruct each student the proper technique for installing a hot / cold water line to (1) sink.

4.2.4.2 Water Heater: Instruct each student the proper technique for installing a water heater equipped with cold water in & hot water out. Also minor electrical installation will be needed to power the unit.

4.2.4.3 Shower: Instructor will provide each student with the hands on knowledge of installing a shower, equipped with a hot / cold water line, drain and mixing valve.

4.2.4.4 Toilet: Instructor will provide each student with the hands on knowledge of installing a toilet, cold water supply, drain and wax ring.

4.2.4.5 Drain: Instructor will provide each student with the hands on knowledge of installing a waste line for all applicable fixtures.

4.2.5 Final Exam

4.2.5.1 Problem Solving: Using a pre equipped bathroom, instructor will create deficiencies within each utility fixture from which each student will be graded upon successful completion of evolution.

5.0 DELIVERABLES

Description Num ber

PWS

Ref.

Delivery Date

Contractor Manpower Reporting

0001 6.0 Annually NLT 31 October and/or at contract completion.

6.0 CONTRACTOR MANPOWER

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for NSWG 2 via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil

7.0 CONTRACTOR TRAVEL

7.1 Not Applicable

8.0 SECURITY

8.1 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.

9.0 SAFETY

9.1 Nothing in the Statement of work, nor any Government action or failure to act in performance of the contract shall relieve the contractor of its responsibility for the safety of the contractor's personnel and property, the Government's personnel and property, and the general public. Furthermore, nothing in this PWS shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.

10.0 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION

10.1 N/A

11.0 QUALITY CONTROL

11.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.

12.0 QUALITY ASSURANCE

12.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.

12.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.

12.3

13.0 PERIOD OF PERFORMANCE

13.1 Period of performance will be determined on each task order. Dates are subject to change at the Government’s discretion with prior notice to the Contractor within a reasonable time not less than 15 calendar days

File details come from the government source that posted it. Updated .