PWS_Revision.docx

DOCX document 36 KB Posted

Attached to
Provide Advanced Off Road Driving Training
Solicitation number
H92240-15-T-2008
Issued by

About this file

PWS

View the file

Other files

File Type Posted
DFAR_CLAUSE_252.209-7999_(DEV) 1 .pdf PDF
DFAR_CLAUSE_252.209-7998_(DEV) 1 .pdf PDF
Past_Performance_Information_Form.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Naval Special Warfare Command Off-Road Driving

1. BACKGROUND

1.1 This Off-Road Driving course requires the capability to conduct operations in varying environmental and terrain conditions to ensure the continued success of this command and safety of our personnel. This course will address the specific techniques called upon when conducting mobility operations in various technical terrains. The broad scope of terrain encountered during operations requires advanced training and education for personnel in order to safely and efficiently operate mobility platforms while preserving operability of the vehicle utilized. Operations conducted in various complex terrain, require a depth of knowledge and experience to ensure the safety of each unit from the smallest operational element to a larger NSW force. The need for this training is driven by the multiple areas that Naval Special Warfare forces are currently operating in and may be called upon to operate in the future. With the current operational tempo and manpower limitations found within the NSW forces on the east coast, contractor assistance is required. Contractor assistance will act as a force multiplier, enhance unit capabilities and improve on the readiness and effectiveness of the command by providing technical and tactical resources to support the war-fighter. Contractor support is critical in assisting the Command in meeting emerging mission essential requirements.

2. OBJECTIVES

2.1 Per FRM requirements (APPENDIX J SEAL 1.28 and SEAL 1.32) SEAL Teams are required to complete non-standard mobility training prior to and during Unit Level Training (ULT). The current formalized courses of instruction offered by Naval Special Warfare has exposed a requirement for training in advanced off-road driving.

3. SCOPE

3.1 The contractor shall provide the capability to address the following:

3.1.1 Contractor will train 15 SEAL Team TEN members in current advanced off-road techniques and requirements.

3.1.2 Long range driving operations to include navigation by map, compass, and GPS.

3.1.3 Vehicle recovery operations.

3.1.4 Vehicle field repairs.

3.1.5 Various driving terrains to include; advanced terrain, high / low desert, mountainous terrain, multiple river and stream crossings, dry and wet conditions, soft sand and viscous mud.

3.1.6 Non-standard vehicles to be encountered overseas; Toyota Hilux, Land Rover, and Range Rover.

3.1.7 All vehicles must be manual transmissions.

3.1.8 Driving techniques to enhance vehicle preservation

3.1.9 Advanced off-road nighttime driving on NVG’s

4. REQUIREMENTS

4.1 The contractor shall provide the following:

4.1.1 Instructors whose qualifications include:

4.1.1.1 Experienced Off-Road Driving Instructor (8+ years desired)

4.1.1.2 Understanding of Military Applications

4.1.1.3 Recent real world advanced off-road driving experience.

4.1.2 At a minimum the following learning points must be included into the curriculum:

4.1.2.1 Contractor will train 15 SEAL Team TEN members in current advanced off-road techniques and requirements.

4.1.2.2 Long range driving operations to include navigation by map, compass, and GPS.

4.1.2.3 Vehicle recovery operations.

4.1.2.4 Vehicle field repairs.

4.1.2.5 Various driving terrains to include:

4.1.2.5.1 Advanced terrain.

4.1.2.5.2 High/low desert.

4.1.2.5.3 Mountainous terrain.

4.1.2.5.4 Multiple river and stream crossings

4.1.2.5.5 Dry and wet conditions

4.1.2.5.6 soft sand and viscous mud

4.1.2.6 Non-standard vehicles know to be utilized by U.S. Forces overseas. Examples include:

4.1.2.6.1 Toyota Hilux

4.1.2.6.2 Land Rover

4.1.2.6.3 Range Rover

4.1.2.7 All vehicles must be manual transmission.

4.1.2.8 Driving techniques to enhance vehicle preservation.

4.1.2.9 Advanced off-road night time driving on NVGs.

4.1.3 The contractor shall support the training program with the capability to encounter various environmental conditions, refine TTP’s, instruct training, and provide recommended material solutions. The contractor shall perform analysis constantly and provide updates in each area to ensure the strategy and techniques remain relevant. The contractor shall support elements of SEAL Team TEN in training for pre-deployment purposes.

4.1.4 The contractor will provide suitable vehicles, training sites, and terrain to support the training requirements identified in 4.1.2.

4.1.5 The contractor/instructors on site will provide all fuel, ancillary equipment, vehicle recovery gear, and repair gear required to support training.

4.2 Participate in a Post-Award Conference.

4.2.1 This meeting shall provide an introduction between the Contractor personnel and Government personnel who will be involved with the contract. The meeting shall provide the opportunity to discuss technical, management and security issues. The Post Award Conference will aid both the Government and Contractor in achieving a clear and mutual understanding of all requirements, and identify and resolve any potential issues. The Contractor shall be prepared to discuss any items requiring clarification and gather information as necessary to support each deliverable. The Contractor shall provide a written summary of the Post-Award Conference (CDRL A003).

5. DELIVERABLES

Deliverable
CDRL
PWS Ref.
Delivery Date
Training Schedule
A001
4.2
3 days after contract award
Training Plan
A002
4.3
3 days after contract award
Post Award Conference Minutes
A003
4.4
1 work day after post award conference
Contractor Manpower Reporting
A004
6.0
NLT 31 October or at contract completion, whichever is sooner.

6. CONTRACTOR MANPOWER REPORTING

6.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the NSWG-2/ST10 via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil . (CDRL A004)

7. CONTRACTOR TRAVEL

7.1 Contractor travel is authorized for: Training will depart from Victorville, CA, and will go through Cougar Buttes, Lucerne Valley, Barstow, Stoddard Valley and then back to Victorville, CA. Most of areas we will be traveling through reside within BLM lands. This covers approximately 600 miles total in these various areas.

7.2 Contractor costs for Government authorized travel are included in this contract. All travel shall be in accordance with FAR 31.205-46 and applicable travel regulations (Joint, Federal or Standardized). Contractor payment claims shall include applicable documentation to support actual costs incurred (e.g. airfare and hotel/lodging receipts) as well as any receipts valued at or above $75.00. Failure to provide appropriate documentation may result in loss of reimbursement of travel expenses.

8. SECURITY

8.1 Not Applicable

9. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION (GFP/GFE/GFI)

9.1 ST-10 personnel attending the course will provide their own clothing, necessary personal gear, and personal protective equipment required for the course of instruction. This will include but not be limited to durable civilian clothes, bump helmet, NVG’s, gloves, compass, and GPS.

10. QUALITY CONTROL

10.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.

11. QUALITY ASSURANCE

11.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.

11.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.

12. APPLICABLE DOCUMENTS Not Applicable

13. PLACE OF PERFORMANCE

13.1 Training shall be conducted in the Death Valley area with travel previously mentioned under line 7.

14. PERIOD OF PERFORMANCE

14.1 March 1st – March 7th 2015

Ver: Oct 2014

Ver: Dec 2014

File details come from the government source that posted it. Updated .