PWS_BDAR_FY15_(updated).docx
DOCX document 33 KB Posted
- Attached to
- PROVIDE ADVANCED MOBILITY REPAIR COI
- Solicitation number
- H92240-15-T-0096
- Issued by
-
United States Special Operations Command
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DFAR_CLAUSE_252.209-7998_(DEV) 1 .pdf | ||
| DFAR_CLAUSE_252.209-7999_(DEV) 1 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Naval Special Warfare Command Group Two
ADVANCED MOBILITY/MAINTENANCE/BDAR
| 1.0 | BACKGROUND |
| 1.1 Due to the various and remote locations that Transportation supports while deployed there is a high demand for all Seabees to have a general knowledge and be proficient in many areas other than their Navy rating i.e. Construction Mechanics, Equipment Operators. |
| 2.0 | OBJECTIVES | |
| 2.1 The objective is to provide a Course of Instruction (COI) in Advanced Mobility/Maintenance/Battle Damage Assessment and Repair (BDAR) that will provide training on the operation as well as operator maintenance of the HMMWV. | ||
| 3.0 | SCOPE FOR ADVANCED MOBILITY/MAINTENANCE/BDAR | |
| 3.1 The Contractor shall provide the personnel, management and materials necessary to ensure all students complete the course of instruction objective. The class size for each course of instruction will be twelve (12) students with a student to instructor ratio of 3:1. | ||
| 4.0 | REQUIREMENTS | |
| 4.1.1 The Contractor shall provide training in the following: |
4.1.2 Advanced Mobility Training (classroom)
4.1.2.1 Vehicle Characteristics
4.1.2.2 Major Systems
4.1.2.3 Safety
4.1.2.4 Off-Road Operations
4.1.2.5 Terrain Physics/Dynamics
4.1.3 BDAR Techniques for the HMMWV-Shop
4.1.3.1 Cooling System Troubleshooting and Repair
4.1.3.2 Fuel System Troubleshooting and Repair
4.1.3.3 Electrical System Troubleshooting and Repair
4.1.3.4 Steering System Troubleshooting and Repair
4.1.3.5 Practical Exercise
4.1.3.6 Transmission Troubleshooting and Repair
4.1.3.7 Driveline Troubleshooting and Repair
4.1.3.8 Suspension System Troubleshooting and Repair
4.1.3.9 Electrical System Troubleshooting and Repair
4.1.3.10 Practical Exercise
| 4.1.4 Off Road/Cross Country Operations-Track |
| 4.1.4.1 Safety Brief |
4.1.4.2 Introduction to Off-Road Course. (Practical Exercise)
4.1.4.3 Preventative Maintenance Checks and Services (PMCS)
| 4.1.4.3.1 Before |
| 4.1.4.3.2 During |
4.1.4.3.3 After
| 4.1.5 Performance Data | |
| 4.1.5.1 Engine |
4.1.5.2 Drive Line
4.1.5.3 Vehicle Weight
4.1.5.4 Gear Reduction
4.1.5.5 Gradeability
4.1.5.6 Approach Angle
4.1.5.7 Departure Angle
4.1.6 Terrain Physics/Dynamics (Practical Exercise) In-Field Obstacles
4.1.6.1 Brake Throttle Modulation
4.1.6.2 Crossing Logs, Walls, Rocks, Severe Ditches, etc.
| 4.1.6.3 Controlling Wheel Spin | |
| 4.1.6.4 Side Slop Operation | |
| 4.1.6.5 Operation on Hills |
4.1.6.6 Operation in Water
4.1.6.7 Operation in Sand
4.1.6.8 Vehicle Recovery Operations
4.1.6.9 Returning to On-Road Operations
4.1.6.10 Night (blackout) operations
4.1.7 Intro. - Maintenance Training: Electrical Troubleshooting
4.1.7.1 12/24 Dual Voltage System
4.1.7.2 Glow Plug System
| 4.1.7.3 Starter | |
| 4.1.7.4 Protective Control Box | |
| 4.1.7.5 Electrical System | |
| 4.1.7.6 Organizational Troubleshooting: 4L80E Transmission | |
| 4.1.8 Off Road/Cross Country Operations (Practical Exercise) | |
| 4.1.8.1 Safety Brief / PMCS |
4.1.8.2 Operate Over Infield Controlled Obstacles
4.1.8.3 Operate in Off-Road Environment
4.1.8.3 Operate in Extreme Off-Road Environment
4.1.6 Terrain Physics/Dynamics (Practical Exercise) In-Field Obstacles
4.1.6.1 Safety Brief / PMCS
4.1.6.2 Operate in Extreme Off-Road Environment.
| 4.1.6.3 Perform Self Recovery Using Vehicle Winch. | |
| 4.1.6.4 Perform Self Recovery Using Field Expedient Methods. | |
| 4.1.6.5 Perform Recovery of Another HMMWV | |
| 4.2 Develop Training Plan (A001). | |
| 4.3 Develop Course Schedules: Course schedule will be confirmed with the Lead Instructor. (A002). | |
| 4.4 Course completion certificate to be provided to each student upon completion of course. (A003). |
| 5.0 | DELIVERABLES |
| Deliverable | |
| CDRL | |
| PWS Ref. | |
| Delivery Date |
| Training Plan |
| A001 |
| 4.2 |
| 5 days after contract award |
| Course Schedule |
| A002 |
| 4.3 |
| 5 days after contract award |
| Completion Certificate |
| A003 |
| 4.4 |
| Upon completion of course |
| 6.0 | CONTRACTOR MANPOWER REPORTING: |
| 6.1 Contractor Manpower Reporting not required due to the dollar value. |
7.0 CONTRACTOR TRAVEL
7.1 Contractor travel is not authorized for this service.
8.0 SECURITY
8.1 The contractor shall insure requirements for safeguarding classified information and classified materials, for obtaining and verifying personnel security clearances, for verifying security clearances and indoctrination of visitors, for controlling access to restricted areas, for protecting government property, and for the security of automated and non-automated management information systems and data are fulfilled. The contractor's management system shall prevent unauthorized disclosure of classified and sensitive unclassified information. The government shall be immediately notified if any security incident or any indication of a potential unauthorized disclosure or compromise of classified or sensitive unclassified information.Contractor is not required base access.
| 9.0 | SAFETY |
| 9.1 Nothing in the Statement of work, nor any Government action or failure to act in performance of the contract shall relieve the contractor of its responsibility for the safety of the contractor's personnel and property, the Government's personnel and property, and the general public. Furthermore, nothing in this PWS shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract. |
10.0 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION (GFP/GFE/GFI): N/A
| 11.0 | QUALITY CONTROL |
| 11.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract. |
12.0 QUALITY ASSURANCE
12.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
13.0 APPLICABLE DOCUMENTS: There are no applicable documents for this requirement.
14.0 PLACE OF PERFORMANCE
14.1 Training shall be conducted at the contractor’s facility
Ver: Oct 2014
Ver: May 2013
File details come from the government source that posted it. Updated .