PWS_Wind_Tunnel_15-T-0054.docx
DOCX document 30 KB Posted
- Attached to
- VERTICAL WIND TUNNEL TRAINING
- Solicitation number
- H92240-15-T-0054
- Issued by
-
United States Special Operations Command
About this file
Performance Work Statement for Vertical Wind Tunnel Training
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wind_Tunnel_CLIN_List.xls | XLS spreadsheet | |
| CLAUSE_252.209-7998_ _7999.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H92240-15-T-0054 Performance Work Statement (PWS) Naval Special Warfare Command Vertical Wind Tunnel
1 BACKGROUND
1.1 Naval Special Warfare Command requires the use of a Vertical Wind Tunnel (VWT) to conduct HALO sustainment training for Air Operations Trainer/Examiners, SEAL/SWCC, prospective MFF students for all Military Free Fall personnel.
2 OBJECTIVES
2.1 The Government intends to award a Firm Fixed Priced IDIQ contract for VWT time to facilitate the continuation training of MCADS parachutist and Military Free Fall personnel. A portion of the VWT time will be purchased from the contractor with coaching provided by the contractor for advanced skills.
3 SCOPE
3.1 The contractor shall provide hours of Wind Tunnel Training Time and hours of Hourly Coaching Time for one on one advanced skills as needed. Work shall be performed at contractor’s facilities. Contractor facilities outside 200 miles of Joint Expeditionary Base, Little Creek, VA will require government travel costs (per diem) which will be added to offerors price.
4 REQUIREMENTS
4.1 The contractor shall provide numerous hours of Wind Tunnel Training Time and hours of Hourly Coaching Time to one on one advanced skills. User also requires wind tunnel safety observer personnel.
4.2 Contractor’s facility shall meet or exceed the following standards:
4.2.1 Fan Driven
4.2.2 14’ Diameter
4.2.3 52” Tall
4.2.4 180 mph max (1400hp)
4.2.5 Flight Area: Enclosed
4.2.6 Tunnel entry/exit: Enter and exit through single door opening
5 SECURITY
5.1 Not Applicable
6 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION (GFP/GFE/GFI)
6.1 Government will provide VWT training parachute systems and associated PPE for continuation training.
7 QUALITY CONTROL
7.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.
8 QUALITY ASSURANCE
8.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
8.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
9 PLACE OF PERFORMANCE
9.1 All performance will take place at the contractor facility.
10 PERIOD OF PERFORMANCE
10.1 Base: Date of award through 12 months
Option Period 1: 12 months following previous period Option Period 2: 12 months following previous period Option Period 3: 12 months following previous period Option Period 4: 12 months following previous period
Ver: Oct 2014
Attachment Ver: Dec 2014
File details come from the government source that posted it. Updated .