Atch_10_PPQ.doc

DOC document 106 KB Posted

Attached to
SOCOM Wide Mission Support (SWMS) Group A Federal contract opportunity
Solicitation number
H92222-14-R-0020
Issued by
United States Special Operations Command

About this file

Attachment 10 PPQ

View the file

Other files for this federal contract opportunity

Other files attached to SOCOM Wide Mission Support (SWMS) Group A, newest first.
File Type Posted
RFP_Q A_1-26-2015.pdf PDF
H92222-14-R-0020_Amendment_0004.pdf PDF
H92222-14-R-0020_Conformed_through_Amend_04.doc DOC document
Atch_3_Amend_04.xls XLS spreadsheet
Atch_7_SMEP_Amend_04_PENDING.pdf PDF
Atch_8_J5_Strat_and_Plan_Amend_03.pdf PDF
H92222-14-R-0020_Amendment_0003.pdf PDF
Atch_6_SORDAC_Amend_03.pdf PDF
SWMS_Group_A_RFP_Q As_Final_Batch.pdf PDF
Atch_8_J5_Strat_and_Plan_Amend_02.pdf PDF
Atch_6_SORDAC_Amend_02.pdf PDF
Atch_7_SMEP_Amend_02.pdf PDF
Atch_5_Amend_02.pdf PDF
H92222-14-R-0020_Amendment_0002.pdf PDF
Group_A_FBO_Post_1-16-2015.pdf PDF
H92222-14-R-0020_Batch_3_Q A.pdf PDF
H92222-14-R-0020_Q A_Batch_2.pdf PDF
Atch_3_Amend_01.xls XLS spreadsheet
Atch_10_PPQ_Amend_01.doc DOC document
Atch_11_Amend_01.doc DOC document
Atch_7_SMEP_Amend_01.pdf PDF
Atch_9_PPI_Amend_01.doc DOC document
Atch_5_J2_Amend_01.pdf PDF
Atch_6_SORDAC_Amend_01.pdf PDF
Atch_8_J5_Amend_01.pdf PDF
H92222-14-R-0020-0001.pdf PDF
Group_A_Q A_Batch_1.pdf PDF
Atch_12_Client_Authorization.doc DOC document
Atch_13_SF_1408.doc DOC document
Atch_11_Consent.doc DOC document
Atch_7_SMEP.pdf PDF
CDRL_A002_QA_Attachment.pdf PDF
Atch_3_Group_A_Pricing_Template.xls XLS spreadsheet
Atch_2_Group_A_DD_254.pdf PDF
Atch_8_J5_Strategic_and_Plans_Support.pdf PDF
Atch_5_J2_Sample_PWS.pdf PDF
Atch_1_Group_A_SOW.pdf PDF
CDRL_A001.pdf PDF
CDRL_A002_Group_A_Quarterly.pdf PDF
Atch_6_SORDAC_Group_A.pdf PDF
H92222-14-R-0020.doc DOC document
Final_Group_A_RFP_QA.xls XLS spreadsheet
Atch_9_PPI.doc DOC document
Group_A_Draft_RFP_Sample_SOO.doc DOC document
Draft_H92222-14-R-0020_SWMS_Group_A_Strat_Comm_Creative_Writer_SOW.doc DOC document
Draft_H92222-14-R-0020_SWMS_Group_A.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H92222-14-R-0020 Attachment 10

PAST PERFORMANCE QUESTIONNAIRE SWMS GROUP A

PART I INSTRUCTIONS: THE OFFEROR SHALL COMPLETE PART 1 BEFORE SENDING THE QUESTIONNAIRE TO THE CUSTOMER.

Check the applicable Group A taxonomy that corresponds with the referenced service:

FORMCHECKBOX

Program Management

FORMCHECKBOX

Engineering & Technical Services

FORMCHECKBOX

Administrative & Other Services

PART I: CONTRACT IDENTIFICATION

Questionnaire provided for:
(Insert Company Name & Cage Code)
Is this company a Small Business? (select one):
Yes FORMCHECKBOX

No FORMCHECKBOX

SWMS Prime Offeror Name & Cage Code:

Contract/TO Title: ______________________________________________

Contract/TO Number: __________________________________________

Project Name: _________________________________________________

The company designation under the referenced Contract/TO:
FORMCHECKBOX

Prime Offeror;

FORMCHECKBOX

Joint Venture Component of Prime Offeror; or

FORMCHECKBOX

Subcontractor

If Prime Contractor, list Major Subcontractor(s), if applicable:

Customer Type:
FORMCHECKBOX

Federal Agency FORMCHECKBOX Commercial Organization

Customer Name:

Contract/TO Contracting Officer Contact information:

Name &Title:

Phone No. :

Address:

Contract/TO COR Contact information:

Name &Title:

Other Contract/TO Technical POC(s) Contact information:

Name &Title:

Contract/TO Period of Performance:

Contract/TO Type:
FORMCHECKBOX

FFP; FORMCHECKBOX

T&M; FORMCHECKBOX

CPFF; FORMCHECKBOX

Other (hybrid)

Original Contract/TO Total Value:

Current Contract/TO Total Value:

PART 2 INSTRUCTIONS: CUSTOMER RESPONDENT, PLEASE COMPLETE THIS QUESTIONNAIRE AND E-MAIL TO KAREN.STEVENS@SOCOM.MIL AND SHERRI.ASHBY@SOCOM.MIL, NO LATER THAN THE CLOSING DATE OF THE REQUEST FOR PROPOSAL IDENTIFIED IN SECTION L. THE “SUBJECT” LINE IN THE SUBMISSION EMAIL SHALL CLEARLY INDICATE: “SWMS Group A PPQ Submission for Prime Offeror XXX”. DO NOT PROVIDE A COMPLETED COPY TO THE CONTRACTOR.

PART 2: EVALUATION

Name and Title of Person Completing Questionnaire:

Contact Information of Person Completing Questionnaire:

Your Role in this Contract/TO:

For each question, please place an “X” in the box corresponding to the rating. Please provide supporting rationale for all ratings except “Satisfactory” or “Not Applicable”. The narratives need not be lengthy. Narratives should be just clear and concise. Space for narrative comments is provided at the bottom of the questionnaire. The ratings are defined as follows:

CODE

PERFORMANCE LEVEL

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N NOT APPLICABLE – Unable to provide a rating. Contract did not include performance on this element or sub-element or information was not available. Do not know.

Program Management
E
V
S
M
U
N

M1. Provided effective management of personnel resources to include geographically dispersed work locations as required

M2. Was effective and responsive in allocating sufficient personnel resources in the performance of customer requirements

M3. Demonstrated ability to hire, maintain, retain, and replace, if necessary, qualified personnel during the contract period.

M4. Timeliness of awards to subcontractors and management of subcontractors, including subcontract costs. Early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.

M5. Was effective and efficient in hiring adequate personnel based on existing, new, and emerging requirements.

M6. Effectively managed cost, schedule, and performance to meet customer

Requirements.

M7. Ability to maintain effective Quality Control Plan; provided effective quality control and/or inspection procedures to meet contract requirements.

M8. Corrected deficiencies in timely manner and pursuant to their quality control procedures

M9. Ensured quality/effectiveness of subcontracted efforts.

M10. Ability of Contractor to detect, disclose, avoid, and mitigate OCI issues/risks.

M11. Ability of Contractor to provide employee conflict of interest training and compliance with non-disclosure policy.

M12. Complied with Security requirements in getting personnel security clearances and safeguarding classified materials.

Technical Capability
E
V
S
M
U
N

T1. Understood/complied with customer technical requirements

T2. Understood/complied with customer-specific processes as required

T3. Provided effective quality control and/or inspection procedures to meet contract requirements

T4. Corrected deficiencies in timely manner and pursuant to their quality control procedures

T5. Identified problems as they occurred and suggested alternative resolutions

T6. Displayed initiative to solve problems

T7. Developed, tracked, and maintained realistic schedules

T8. Was efficient and timely in performance and delivery of services

Cost Control
E
V
S
M
U
N

C1. Was accurate in forecasting contract costs

C2. Met forecasted costs and perform within contract costs

C3. Alerted Government of unforeseen costs before they occur

C4. Sufficiency and timeliness of cost reporting

C5. Current, accurate and complete billings

C6. Identified problems as they occurred and suggested alternative resolutions

C7. Paid subcontractors in a timely manner

C8. Provided accurate and complete line item cost proposals including all aspects of work required for each task

Overall Contractor Performance
E
V
S
M
U
N

OCP1. How would you rate the contractor's overall performance?

OCP2. Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in OCP2 below
FORMCHECKBOX

YES FORMCHECKBOX

NO

OCP3. Was the contractor ever issued a full or partial termination for default or termination for convenience under the referenced contract? If yes, explain outcome in OCP3 below

FORMCHECKBOX

YES FORMCHECKBOX

NO

OCP4. Would you award another contract to this contractor? If not, explain in OCP4 below
FORMCHECKBOX

YES FORMCHECKBOX

NO

NARRATIVE SUMMARY

(Do not include personal names in the narrative section.)

N1. What were the contractor’s greatest strengths in the performance of the contract?

N2. What were the contractor’s greatest weaknesses in the performance of the contract?

OCP2. If marked yes, explain outcome here.

OCP3. If marked yes, explain outcome here.

OCP4. If marked no, explain here.

Once complete, this form contains Source Selection Information IAW FAR 3.104

File details come from the government source that posted it. Updated .