090115 Amendment A0001.doc

DOC document 86 KB Posted

Attached to
LTATV
Solicitation number
H92222-09-R-0014
Issued by

About this file

SF 30 Amendment 01

View the file

Other files

File Type Posted
090120 Questions and Answers 1-16.doc DOC document
CDRLs.docx DOCX document
Attch 02 LTATV Performance Parameters -7 Jan 09.xls XLS spreadsheet
Attch 03 Past Performance Matrix 6 Jan 09.doc DOC document
090109 Final LTATV RFP.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to a) Revise the Prime Item Specification date in CLINs 1001, 2001, 3001, 4001, and 5001; b) Revise 52.212-1 Instructions to Offerors – Commercial Items to reflect the correct proposal due date; c) Revise List of Attachments/Exhibits by incorporating a revised Prime Item Specification dated 20 Jan 09; and

d) Incorporate Questions and Answers numbers 1 through 16 dated 20 Jan 2009.

a) Revise the item description in CLINs 1001, 2001, 3001, 4001, and 5001 by changing the Prime Item Specification date from 6 Jan 2009 to read 20 Jan 2009. The following are the revised CLINs 1001, 2001, 3001, 4001, and 5001:

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,625
Each

Lightweight Tactical All Terrain Vehicle

FFP

Lightweight Tactical All Terrain Vehicle (LTATV) shall be in accordance with Prime Items Specification dated 20 Jan 09. Each vehicle shall include all associated special tools, operators’ manual, and maintenance manual in accordance with CDRLs A001, A002, and A003.

Period of Performance: 1 Apr 2009 through 31 Mar 2010.

Offerors will submit their proposed unit prices using a step ladder structure similar to the one below. Offerors shall propose price breaks based upon the most cost effective pricing schedule available.

FOB: Destination

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Lightweight Tactical All Terrain Vehicle

Lightweight Tactical All Terrain Vehicle (LTATV) shall be in accordance with Prime Items Specification dated 20 Jan 09. Each vehicle shall include all associated special tools, operators’ manual, and maintenance manual in accordance with CDRLs A001, A002, and A003.

Period of Performance: 1 Apr 2010 through 31 Mar 2011.

Offerors will submit their proposed unit prices using a step ladder structure similar to the one below. Offerors shall propose price breaks based upon the most cost effective pricing schedule available.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Lightweight Tactical All Terrain Vehicle

Lightweight Tactical All Terrain Vehicle (LTATV) shall be in accordance with Prime Items Specification dated 20 Jan 09. Each vehicle shall include all associated special tools, operators’ manual, and maintenance manual in accordance with CDRLs A001, A002, and A003.

Period of Performance: 1 Apr 2011 through 31 Mar 2012.

Offerors will submit their proposed unit prices using a step ladder structure similar to the one below. Offerors shall propose price breaks based upon the most cost effective pricing schedule available.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Lightweight Tactical All Terrain Vehicle

Lightweight Tactical All Terrain Vehicle (LTATV) shall be in accordance with Prime Items Specification dated 20 Jan 09. Each vehicle shall include all associated special tools, operators’ manual, and maintenance manual in accordance with CDRLs A001, A002, and A003.

Period of Performance: 1 Apr 2012 through 31 Mar 2013.

Offerors will submit their proposed unit prices using a step ladder structure similar to the one below. Offerors shall propose price breaks based upon the most cost effective pricing schedule available.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Lightweight Tactical All Terrain Vehicle

Lightweight Tactical All Terrain Vehicle (LTATV) shall be in accordance with Prime Items Specification dated 20 Jan 09. Each vehicle shall include all associated special tools, operators’ manual, and maintenance manual in accordance with CDRLs A001, A002, and A003.

Period of Performance: 1 Apr 2013 through 31 Mar 2014.

Offerors will submit their proposed unit prices using a step ladder structure similar to the one below. Offerors shall propose price breaks based upon the most cost effective pricing schedule available.

b) Revise 52.212-1(b) to reflect the correct proposal due date:

52.212-2(b) is changed from:

(b) Submission of offers. Offerors shall submit a complete Proposal on 6 Feb 2009 no later than 12:00 p.m. (EST). Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Proposals shall be transmitted via email to the following addresses: tiffany.garfield.ctr@socom.mil and/or kevin.jans@socom.mil. As a minimum, offers must show—

To Read:

(b) Submission of offers. Offerors shall submit a complete Proposal on 26 Jan 2009 no later than 4:00 p.m. (EST). Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Proposals shall be transmitted via email to the following addresses: tiffany.garfield.ctr@socom.mil and/or kevin.jans@socom.mil. As a minimum, offers must show—

c) Revise List of Attachments/Exhibits by incorporating a revised Prime Item Specification dated 20 Jan 09:

LIST OF ATTACHMENTS/EXHIBITS

TYPE OF DOCUMENTS
DESCRIPTION
NUMBER

OF PAGES

Attachments

01
LTATV Program Prime Items Specification dated 20 Jan 2009
9
02
LTATV Performance Matrix dated 7 Jan 2009
3
03
LTATV Past/Current Performance Table 6 Jan 2009
1

Exhibits

A001
Operators Manual LTATV
1
A002
Maintenance Manual LTATV
1
A003
Special Tools List
1
A004
Spare Parts List
1

(End of Summary of Changes)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE

PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA

15C. DATE SIGNED

15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)

(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)

X

H92222-09-R-0014

9B. DATED (SEE ITEM 11)

09-Jan-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jan-2009

CODE

HQ USSOCOM SOAL-K

ATTN: TIFFANY GARFIELD

7701 TAMPA POINT BLVD

MACDILL AFB FL 33621-5323

H92222

7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

See Item 6

FACILITY CODE

EMAIL:

TEL:

File details come from the government source that posted it. Updated .