H.S. Weight Room Addition - Updated Front Ends.pdf

PDF 3 MB Posted

Attached to
High School Weight Room Addition
Solicitation number
RFP GRPS 270000000030 1
Issued by
Kent County, Michigan

About this file

This is a bid advertisement and front-end documentation for Greenville Public Schools in Michigan for the Greenville High School Weight Room Addition project. The project involves a comprehensive renovation and addition to the high school's weight room facility, requiring sealed bids submitted in triplicate to the Greenville Public Schools Administration Office at 1414 W Chase Street, Greenville, Michigan 48838 by October 27, 2026 at 10:00 a.m. A mandatory pre-bid walk-through is scheduled for October 14, 2026 at 4:00 p.m. at Greenville High School (111 N Hillcrest Street), and requests for information must be submitted by October 19, 2026 at 10:00 a.m. Mandatory post-bid interviews are scheduled for October 28 and 29, 2026. The project encompasses thirteen bid categories: Sitework, Concrete, Masonry, Metals, General Trades, Roofing Systems, Aluminum Storefronts, LPDA (drywall and acoustical), Flooring, Painting, Fire Suppression, Mechanical, and Electrical. Construction is scheduled to begin in June 2027 during summer break with substantial completion targeted for March 6, 2028.

Bidders must submit a 5% bid security or bid bond, a sworn and notarized familial disclosure statement, and an Iran Disclosure Act affidavit. All bidders must demonstrate at least ten years' experience under their current company name, possess valid Michigan licensing and insurance, and maintain financial resources to complete the work. The successful contractor will be required to secure a Performance, Labor, and Material bond covering 100% of the contract cost. The bid documents include mandatory alternates for flooring options (rubber athletic sheet flooring, custom water-jet cut logo, and synthetic turf) that must be priced. All work must comply with MIOSHA regulations, and contractors are responsible for obtaining all necessary state and local permits. The project is not subject to prevailing wage requirements. Bidding documents are available through Fritz Wahlfield Construction Co., Inc. via Procore and the West Michigan Builders Exchange. This is not a prevailing wage project.

View the file

Other files

File Type Posted
PROJECT SCHEDULE (1).pdf PDF
BID INVITE TEMPLATE (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 11 13 ADVERTISEMENT FOR BIDS

BID PROPOSAL

Sealed bids, in triplicate, for Greenville Public Schools, Greenville Highschool Weight Room Addition, will be received at Greenville Public Schools Administration Office, 1414 W Chase St, Greenville, MI 48838 on Tuesday, October 27, 2026 @ 10:00 A.M. Any bids received after this date and time will not be accepted or considered. All bids will be opened and read publicly. FAXED OR EMAILED BIDS WILL NOT BE ACCEPTED.

This project is not a prevailing wage project.

All bids must be accompanied by the following;

1. 5% Bid Bond/ Security

2. Sworn and Notarized Familial Disclosure

3. Iran Disclosure Act

SITE INSPECTION

A Pre-bid meeting will be Wednesday, October 14, 2026. This meeting will begin at 4:00 P.M. at Greenville High

School located at 111 N Hillcrest St, Greenville, MI 48838. This pre-bid walk thru is highly recommended. There will be no other time available to view the site.

BID DOCUMENTS

Bidding documents may be viewed and/or requested via the following:

Fritz Wahlfield Construction Co., Inc. (Via Procore) West Michigan Builders Exchange

4455 Westshire Dr. 678 Front St. NW, Comstock Park, MI 49321 Grand Rapids, MI 49504

(616) 784-5833 (616) 949-8650

Please note that contractors are responsible to review information on all drawings and specifications.

BIDDER QUALIFICATIONS

Bidders submitting a proposal for this project shall have the following qualifications:

1. At least (10) years’ experience under the current company’s name.

2. Licensed and insured to perform work in the State of Michigan.

3. Shall have financial resources to complete work under this scope

BID SECURITY

All bids are required to have a bid security or bid bond in the amount of 5% of the bid being submitted. This shall secure the Owner from loss or damage by reason in the occurrence a bid is withdrawn or failure of the successful bidder not entering into Contract with the Owner if the Bid is accepted by the Owner.

The Successful bidder will be asked to secure a Performance, Labor, and Material bond for all work under contract.

Please keep this cost separate on the bid form provided. All bonds shall be from a surety company with an ‘A’ rating.

00 41 00 BID FORM

SUBMIT IN TRIPLICATE

BID TO: Greenville Public Schools 1414 W Chase St, Greenville, MI 48838

ATTENTION: Mr. Wayne Roedel, Superintendent

BID FROM: _______________________________________________________

PROJECT: Greenville Highschool Weight Room Addition

The undersigned, has familiarized themselves with the local conditions as to the cost of the work, and having examined the site conditions and bidding documents prepared by Kingscott Associates Inc., 259 East Michigan Ave., Suite 308, Kalamazoo, MI 49007, hereby proposes to furnish all labor, materials, taxes, equipment, and services needed for the completion of all work in the category submitted. All addenda that have been issued for this project have been recognized and included. The cost for performing work is:

Bid Category Number: _________________

Bid Category Description: ____________________________________________________________

Base Bid Amount: ____________________________________________________________ Dollars

ALLOWANCES: Base Bid includes all allowance cost(s) set forth in Section 01.2100 of the General Requirements and identified in the Instruction to Bidders.

TAXES: Base Bid includes all applicable taxes, including Michigan Sales Tax.

ACKNOWLEDGEMENT OF ADDENDA

The following addenda have been received and acknowledged with their execution is included in the base bid cost:

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

ALTERNATES (MANDATORY TO PROVIDE PRICING AS NEEDED WITH BASE BID)

The following alternates are an add to the Base Bid Cost.

Alternate No. A1:

1. Replace existing flooring with 10 mm rubber athletic sheet flooring (RAF-RAF-2).

Cost: Add/ Delete $___________________________________

Alternate No. A2:

1. Custom water-jet cut logo location. Refer to drawings and renderings provided by Sorinex.

Alternate No. A3:

1. Replace existing flooring with turf with white line markings where indicated, (TURF-1).

COST OF BONDS: Bond Cost for Performance, Labor, and Material Bond Cost. This cost must be included in the

Base Bid. Please list the cost of the bond below.

Greenville Highschool Weight Room Addition:

PLM Bond Amount ____________________________________________________________ Dollars

VOLUNTARY ALTERNATES

The following is a list of Voluntary Alternates. The owner reserves the right to accept or reject and voluntary alternates.

1. ______________________________________________________________________________

2. ______________________________________________________________________________

UNIT PRICE

1. Unit Price No. 1: NA

BID BOND

Accompanying this bid as required by the instructions to Bidders, is a bid security if the form of (Certified Check, Cashier’s Check, or Bid Bond) in the amount of:

Bid Bond Amount ____________________________________________________________ Dollars

CONSTRUCTION SCHEDULE

The undersigned acknowledges the construction schedule set in the bid documents and that they must be met.

ADDITIONAL WORK

1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor's own forces. This includes both overhead and profit.

2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This includes both overhead and profit.

CREDIT FOR WORK DELETED FROM CONTRACT

All work deleted from this contract by the Owner should be credited 100% back to the Owner.

AGREEMENT

In submitting this bid, it is understood that the Owner reserves the right to accept or reject any/all bids for any reason.

This bid is valid 60 days from the date of the opening.

Firm: _______________________________________________________________

Date: __________________

By: _____________________________________________________

Signature: ________________________________________________________

Title: ______________________________

Phone: (_______) _____________________

Email: ______________________________________________________

CONTACT INFORMATION

Please list contact information for the person(s) that should receive communication regarding THIS submitted bid, including Post-Bid Invites. (If Additional contacts should also receive communication, please attach a separate sheet listing a Name, Title, Email and Phone Number for each contact)

Name: ___________________________________________________

Title: ____________________________________________________

Email: ___________________________________________________

Phone: (________) ____________________________

FAMILIAL DISCLOSURE STATEMENT

In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing the familial relationship between the Owner or any employee of the Bidder and any member of Greenville Public Schools Board of Education or Superintendent of Greenville Public Schools.

(_____) No, there is no relationship between the Owner or any employee of the Bidder and any member of Greenville Public Schools Board of Education or Superintendent of Greenville Public Schools.

(_____) Yes, there is a relationship between the Owner or any employee of the Bidder and any member of Greenville Public Schools Board of Education or Superintendent of Greenville Public Schools. Please list the relationship below.

BIDDER BOARD OF EDUCATION MEMBER OR SUPERINTENDENT

Subscribed and sworn this _______________________ day of ___________________________________, 2026

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

AFFIDAVIT OF COMPLIANCE IRAN ECONOMICS SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner, or authorized officer of the below-named company (the “Contractor”), pursuant to the compliance certification requirement provided in Greenville Public Schools Request for Proposal (the “RFP”), hereby certifies, represents, and warrants that the Contractor (which includes its officers, directors and employees) is not an

“Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012

(the “Act”), and that in the event the Contractor is awarded a contract by the Greenville Public Schools as a result of the aforementioned RFP, the Contractor is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the Contract.

The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School Districts investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.

Contractor: _____________________________________________________

By: _______________________________________________ Title: ____________________________________

Date: __________________________________________________________

This instrument was acknowledged before me on the __________________ day of _____________________, 2026

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

REQUEST FOR INFORMATION (RFI) DURING BIDDING PHASE

Requests For Information (RFI’s) will ONLY be accepted through a completed RFI form provided on page 8 in the front ends of this project.

Pre-Bid RFI’s deadline to submit: OCTOBER 19, 2026 BY 10:00 A.M.

Please email the completed RFI form to both:

amanda@wahlfieldconstruction.com f3@wahlfieldconstruction.com

The CM will review the RFI before submitting to the AE firm.

Any questions not submitted following this process prior to the deadline will not be answered.

REQUEST FOR INFORMATION (RFI) FORM

Project: Greenville Highschool Weight Room Addition Date: ________________

Deadline: OCTOBER 19, 2026 BY 10:00 A.M. Action Requested:

______ Clarification

Attn: Fritz Wahlfield III, Fritz Wahlfield Construction (CM) ______ Direction

______ Approval

Company: __________________________________________________ ______ Alternate

Contact: ___________________________________________________ ______ Other

Email: _____________________________________________________

Phone No:__________________________________________________

Reference Drawing No: __________________________ Detail No: ___________ Spec. Section: ___________

Request Information:

RFI #: _________

CM Recommendation:

By: _______________________________ Date: ________________

AE Recommendation:

By: _______________________________ Date: ________________

BID CATEGORIES INDEX

1. Sitework

2. Concrete

3. Masonry

4. Metals

5. General Trades

6. Roofing Systems

7. Aluminum Storefronts

8. LPDA

9. Flooring

10. Painting

11. Fire Suppression

12. Mechanical

13. Electrical

BID CATEGORY NO. 01 - SITEWORK

INCLUDE:

1. Complete Sitework work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

31.1000 SITE CLEARING

31.2000 EARTH MOVING

31.2500 EROSION AND SEDIMENTATION CONTROL

32.1124 AGGREGATE BASE COURSE

33.3113 FACILITY SANITARY SEWERS

33.4200 STORMWATER CONVEYANCE

33.4211 STORMWATER GRAVITY PIPING

33.4230 STORMWATER DRAINS

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

9. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

10. Responsibility of the Contractor to contact Miss Dig at least 36 hours prior to start of work.

11. The CM will provide a one time staking of grades, building footprint, and misc. locations.

a. Additional staking will be at the cost of the Contractor.

12. Concrete or asphalt cutting to complete work in this scope.

13. Any dewatering necessary to complete this scope of work.

14. Sitework included as it relates to pages V1.10, V1.11, V1.12, C2.10, C2.30, C2.40, C3.10, C3.30, C4.10, C4.20, and C5.10 on the construction drawings.

15. Furnish and Install SESC and permit.

16. Include all permits necessary to complete this scope, including local and state level.

17. Site Clearing as shown.

18. Removal of existing concrete as shown.

19. Storm Sewer, Sanitary Sewer, and Water services as shown.

20. Excavation and backfill for new addition as shown.

a. Backfill must be compacted in lifts specified in the bidding documents.

21. Landscaping and Site Restoration as needed.

BID CATEGORY NO. 02 - CONCRETE

1. Complete Concrete work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

03.1000 CONCRETE FORMING AND ACCESSORIES

03.2000 CONCRETE REINFORCING

03.3000 CAST-IN-PLACE CONCRETE

03.3600 POST INSTALLED ANCHORS

07.1400 FLUID-APPLIED WATERPROOFING

07.2100 THERMAL INSULATION

07.2600 VAPOR RETARDERS

07.9200 JOINT SEALANTS

32.1313 CONCRETE PAVING

32.1623 SIDEWALKS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

9. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

10. Furnish and Install all Cast in place concrete; Footings, Foundation Walls, Slab on Grade (SOG), and site concrete as shown.

11. Furnish and Install fluid applied waterproofing on concrete as shown.

12. Furnish and Install Rigid Insulation on Footings, Foundations, and SOG as shown.

13. Furnish and Install Concrete Reinforcing as shown.

14. Furnish and Install Vapor Barrier as shown.

15. Furnish and Install Joint Sealants at control joints as shown.

BID CATEGORY NO. 03 - MASONRY

1. Complete Masonry work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

03.4100 PRECAST STRUCTURAL CONCRETE

04.2000 UNIT MASONRY

07.1400 FLUID-APPLIED WATERPROOFING

07.2100 THERMAL INSULATION

07.2119 FOAMED-IN-PLACE INSULATION

07.2129 SPRAYED INSULATION

07.2500 WEATHER BARRIERS

07.2700 AIR BARRIERS

07.8400 FIRESTOPPING

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

9. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

10. Furnish and Install CMU, Brick, and CMU/ Precast Caps and Lintels as shown.

11. Furnish and Install all rebar and masonry accessories as shown or called out for.

12. Furnish and Install Fluid-Applied Waterproofing on Masonry units as shown.

13. Furnish and Install the Foamed in Place Insulation as shown.

14. Furnish and Install all masonry flashing, weeps, and webbing as shown.

15. Furnish and Install Pre-Cast Concrete for Portal Frames.

16. Install Steel Lintels/ Beams in Masonry as shown.

17. Install Steel Bearing Plates in Masonry as shown.

18. Finishing of Beam Pockets with Masonry.

19. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, flashings, weeps, etc., as shown, specified, and/ or required.

20. Grouting solid of new hollow metal frames in masonry.

21. Grouting of top course of block at existing window openings per Details.

22. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.

23. Toothing and Finishing of Masonry Units at all areas unless otherwise noted.

24. Tooth-in all openings as specified in the general Demolition Notes

25. Brick Washing at all new masonry walls and openings where brick work has been completed.

26. Furnish and Install Joint Sealants at all control joints as shown.

BID CATEGORY NO. 04 - METALS

1. Complete Metal work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

05.1200 STRUCTURAL STEEL FRAMING

05.2100 STEEL JOIST FRAMING

05.3100 STEEL DECKING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

9. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

10. Furnish and Install Steel Joist Framing and Decking.

a. This includes welding or mechanical fastening as called out for.

11. Furnish Steel Lintels as shown.

12. Include all equipment to complete work.

13. All onsite welding must be completed by certified welders.

14. Provide any fire protection and welding protection needed to complete the work in this scope.

15. Provide fire watch for work completed above.

16. Furnish and install any shoring needing to complete the work in this scope.

17. Furnish and Install steel framing for MEP’s as shown.

BID CATEGORY NO. 05 - GENERAL TRADES

18. Complete General Trades work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

06.1000 ROUGH CARPENTRY

06.1600 SHEATHING

07.2100 THERMAL INSULATION

07.9200 JOINT SEALANTS

08.1113 HOLLOW METAL DOORS AND FRAMES

08.1416 FLUSH WOOD DOORS

08.3323 OVERHEAD COILING DOORS

08.7100 DOOR HARDWARE

10.1100 VISUAL DISPLAY UNITS

10.1419 DIMENSIONAL LETTER SIGNAGE

10.1423 PANEL SIGNAGE

10.1423.16 ROOM-IDENTIFICATION PANEL SIGNAGE

12.2400 WINDOW SHADES

19. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

20. Dust control measures for all work in this Bid Category.

21. Daily clean-up at work areas.

22. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

23. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

24. Warranties as specified.

25. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

26. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

27. Furnish and Install Note Items 2 and 3 as shown on Page A0.3. Remove at the completion of the Project.

28. Selective Demolition as shown on D1.1

a. This includes any shoring as needed.

29. Furnish and Install Rough Carpentry as shown.

a. Wood Framing and Parapet caps at CMU walls.

b. Wood Framing and Blocking at Metal Framing areas.

c. Wood Bucks at doors and window openings.

30. Furnish and Install Hollow Metal Door Frames as shown.

31. Furnish and Install Hollow Metal Doors as shown.

32. Furnish and Install Flush Wood Doors as shown.

33. Furnish and Install Door Hardware as shown.

34. Furnish and Install Visual Display Units.

35. Furnish and Install Dimensional Letter Signage.

36. Furnish and Install Panel Signage.

37. Furnish and Install Room Identification Panel Signage.

38. Furnish and Install Window Shades.

BID CATEGORY NO. 06 - ROOFING SYSTEMS

1. Complete Roofing Systems work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

07.2100 THERMAL INSULATION

07.2500 WEATHER BARRIERS

07.5323 EPDM THERMOSET SINGLE-PLY ROOFING

07.6200 SHEET METAL FLASHING AND TRIM

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

9. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

10. Furnish and Install a Complete EPDM roof system as shown.

a. This includes the specified insulation for this system.

11. Flash in and patch membrane roof system as required at all new curbs, equipment, rails, etc.

a. Including all metal flashings and copings related to this work.

b. Including flashing in all existing penetrations along with all new penetrations.

12. Tie into the existing roofing system at the end of each day as necessary.

13. Furnish, install, and flash in the new Premanufactured Metal Fascia with Extension and Fabricated Metal

Fascia Panel per Details.

14. Demolition of existing metal roof cap for tie in of new roof system.

15. Furnish and Install the 2 hour rated expansion joint as shown.

BID CATEGORY NO. 07 - ALUMINUM STOREFRONTS

1. Complete Aluminum Storefronts work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

08.4313 ALUMINUM-FRAMED STOREFRONTS

08.7100 DOOR HARDWARE

08.8000 GLAZING

08.8300 MIRRORS

08.8813 FIRE-RATED GLAZING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Furnish and install all glass and glazing as shown.

a. Contractor is responsible for temporary infills at new storefronts to maintain building security and to protect from weather.

10. Furnish and install any break metal necessary to complete this scope.

a. Including all flashings, sills, closures, etc. as required for a complete installation.

b. Including the Bent Aluminum Corner Closure per Detail 7 on A6.1.01.

11. Furnish and install all joint sealants for related work in this scope.

12. Contractor is responsible for all field measurements for this scope of work.

13. Glass cleaning at substantial completion of the entire project.

14. Furnish and install all glazing films as specified and/ or as shown.

15. Furnish and install egress stickers at all new egress openings as required by code.

16. Furnish and Install Door Hardware as specified for aluminum applications.

BID CATEGORY NO. 08 - LPDA

17. Complete LPDA work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

09.2116 GYPSUM BOARD ASSEMBLIES

09.2216 NON-STRUCTURAL METAL FRAMING

09.5100 ACOUSTICAL CEILINGS

09.5113 ACOUSTICAL PANEL CEILINGS

09.8433 SOUND-ABSORBING WALL UNITS

18. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

19. Dust control measures for all work in this Bid Category.

20. Daily clean-up at work areas.

21. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

22. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

23. Warranties as specified.

24. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

25. Furnish and install all new metal stud walls, chases, bulkheads, furring, etc. as shown.

a. Including cold formed metal framing at walls & soffits, non-structural metal framing, and metal hat channel.

26. Engineered drawings required to be provided for cold formed metal framing.

27. Furnish and install all batt insulation in interior partitions and exterior metal stud walls as shown.

28. Furnish and install all gypsum boards, tape, joint compound, corner bead, etc. as specified and as shown.

a. All gypsum board must be finished as specified for painting.

b. Including repairs at demo scars, modifications, etc. as required.

29. Repair/ Modify existing bulkheads as required for new construction.

30. Furnish and install firestopping at all rated assemblies as shown on the drawing.

31. Furnish and install new acoustical ceiling systems as shown on the drawings.

a. Includes Sound Panels as shown.

b. Including any perimeter trim at clouds, steps in ceiling height, etc.

32. Coordinate layout and elevations with the Construction Manager prior to install.

BID CATEGORY NO. 09 - FLOORING

1. Complete Flooring work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

09.6253 SYNTHETIC TURF FLOORING

09.6500 RESILIENT FLOORING

09.6513 RESILIENT BASE AND ACCESSORIES

09.6566 RESILIENT ATHLETIC FLOORING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Furnish and Install Complete Flooring system as shown.

a. Includes Synthetic Turf, Resilient Athletic Flooring.

b. Including all tiling, resilient flooring, fluid-applied flooring, tile carpeting, base, and all transitions/ accessories as required by Owner or by code.

c. Responsible for monitoring and procuring methods for humidity control during the installation of the new tiling or flooring systems.

10. Demolition of existing flooring, base, and accessories per Demolition Note 1B on Page D1.1

11. Floor Prep as needed.

BID CATEGORY NO. 10 - PAINTING

1. Complete Painting work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

09.9123 INTERIOR PAINTING

09.9124 INTERIOR PAINTING (MPI STANDARDS)

09.9600 HIGH-PERFORMANCE COATINGS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Furnish and install all painting as shown and specified in the Construction Documents for this project.

a. Including but not limited to, walls, ceilings, structural steel, misc. steel, door frames, doors, etc.

b. Include prepping of surfaces prior to painting.

10. Fire barrier signage/ stenciling on fire walls within concealed space above ceiling per code requirements.

BID CATEGORY NO. 11 - FIRE SUPPRESSION

1. Complete Fire Suppression work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

21.0517 SLEEVES AND SLEEVE SEALS FOR FIRE SUPPRESSION PIPING

21.0523 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING

21.0529 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND

EQUIPMENT

21.0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21.0800 COMMISSIONING OF FIRE SUPPRESSION

21.1313 WET-PIPE SPRINKLER SYSTEMS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.

Provide the CM with a copy of the permit(s).

10. All sealed drawings as required for permitting and approvals.

11. Furnish and install Fire Protection system(s) as specified and as shown on FP000 and FP110.

12. Firestopping/Fire-caulk at rated assemblies as specified in Section 07.8400 for all penetrations.

13. All tie ins and draining of the existing system as required to complete work.

14. It is the responsibility of this Contractor to cut in all fire protection heads into the acoustical ceiling pads.

15. All work to be completed to meet industry standards.

BID CATEGORY NO. 12 - MECHANICAL

1. Complete Mechanical work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

23.0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23.0516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

23.0517 SLEEVES AND SLEEVE SEALS FOR HVAP PIPING

23.0518 ESCUTCHEONS FOR HVAC PIPING

23.0523.12 BALL VALVES FOR HVAC PIPING

23.0523.14 CHECK VALVES FOR HVAC PIPING

23.0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23.0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23.0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23.0713 DUCT INSULATION

23.0716 HVAC EQUIPMENT INSULATION

23.0719 HVAC PIPING INSULATION

23.0800 HVAC COMMISSIONING REQUIREMENTS

23.0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

23.0993.11 SEQUENCE OF OPERATIONS FOR HVAC DDC

23.2113 HYDRONIC PIPING

23.2116 HYDRONIC PIPING SPECIALTIES

23.3113 METAL DUCTS

23.3300 AIR DUCT ACCESSORIES

23.3713.23 REGISTERS AND GRILLES

23.3723 HVAC GRAVITY VENTILATORS

23.7313.13 INDOOR, BASIC AIR-HANDLING UNITS

23.8219 FAN COIL UNITS

23.8239.13 CABINET UNIT HEATERS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.

Provide the CM with a copy of the permit(s).

10. Plumbing and Mechanical demolition as shown on page MD110G.

11. Using qualified trades, saw cutting/ removal/ excavation/ backfill/ compaction/ new concrete at any areas needed for plumbing or mechanical not shown on demolition drawings.

a. Including adjusting existing or new floor drains/ cleanouts for new floor finishes as required.

12. Any coring through masonry or concrete to complete work in this scope must be included.

13. Furnish and install all Plumbing and Mechanical systems as specified and shown.

a. All equipment as specified.

b. Testing and Balancing as required.

c. Including caulking/ joint sealants for the work completed in this bid category.

14. All duct and HVAC piping insulation as required.

a. Including minor repairs to existing insulation.

15. Furnish and install exterior louvers as shown.

16. All DDC and Controls must be included as specified and shown.

17. Firestopping/Fire-caulk at rated assemblies as specified in Section 07.8400 for all penetrations.

18. Floor protection and smoke remediation for any welding or soldering.

BID CATEGORY NO. 13 - ELECTRICAL

1. Complete Electrical work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.1113 ADVERTISEMENT FOR BIDS

00.3100 AVAILABLE PROJECT INFORMATION

00.4100 BID FORM

01.0000 GENERAL REQUIREMENTS

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2500 SUBSTITUTION PROCEDURES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.3300 SUBMITTAL PROCEDURES

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5639 TEMPORARY TREE AND PLANT PROTECTION

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.7700 CLOSEOUT PROCEDURES

02.4119 SELECTIVE DEMOLITION

26.0010 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL

26.0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26.0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26.0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26.0533.13 CONDUIT FOR ELECTRICAL SYSTEMS

26.0533.16 BOXES FOR ELECTRICAL SYSTEMS

26.0533.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS

26.0544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND

CABLING

26.0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26.0923 LIGHTING CONTROL DEVICES

26.2416.01 PANELBOARDS

26.2726 WIRING DEVICES

26.5119 LED INTERIOR LIGHTING

28.4621.11 ADDRESSABLE FIRE-ALARM SYSTEMS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Dust control measures for all work in this Bid Category.

4. Daily clean-up at work areas.

5. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

6. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

7. Warranties as specified.

8. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

9. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.

Provide the CM with a copy of the permit(s).

10. Electrical demolition as shown on page ED110G.

11. Existing items/ fixtures/ devices to be salvaged, stored for re-use/ re-installation as indicated on drawings.

12. Using qualified trades, saw cutting/ removal/ excavation/ backfill/ compaction/ new concrete at any areas needed for electrical not shown on demolition drawings.

13. Any coring through masonry or concrete to complete work in this scope must be included.

14. Demolition and removal of electrical, communications, and fire alarm systems required to facilitate new construction and/or remodeling. It is this Contractor’s responsibility to survey existing conditions to determine the extent of removals.

15. Remove all ceiling-mounted devices including but not limited to power, data, ceiling fans, wireless routers, exit lights, etc.

16. Reinstall ceiling-mounted devices after new ceiling is installed.

17. Patching of surfaces to receive new finishes or fire ratings as a result of your demolition, using qualified trades. Example: screw holes at wire-mold.

18. Temporary electrical (power and lighting) systems. Remove upon the direction of the Construction Manager.

19. Furnish and install blank cover plates at all removed electrical fixtures/ devices at walls, ceilings, and floors not noted for demolition.

20. Furnish and install complete Electrical & Low Voltage systems as specified and shown.

a. Including the electrical work shown on the Civil drawings.

21. All Fire Alarm system work.

a. Including reconnection to monitoring services as required.

22. Receive access control power supplies, mount, and energize with 120V.

23. Furnish and install disconnect switches, wiring, conduit and other equipment/ wiring per Div. 26 as required for a complete and proper electronic access control system.

24. Metal…