H.Final_Solicitation.pdf
PDF 13 MB Posted
- Solicitation number
- 10A2836
- Issued by
- Calaveras County, Rancho Calaveras CDP, California
About this file
This document is a contract bid package from the California Department of Transportation (Caltrans) for a Small Business Minor B culvert replacement project located in Calaveras County on Route 4, spanning post miles 35.6 and 37.5. The project involves replacing six existing culverts with new reinforced concrete pipes at various locations near Avery, with work to be completed within 25 working days. The bid is specifically designated for certified small businesses, with a total estimated project cost of $359,224.00. Quotes are due on October 2, 2025, and the contract is set to be awarded to the lowest responsible bidder whose quote complies with all requirements.
The project includes detailed specifications for culvert replacements, drainage system improvements, and associated roadway work. Bidders must be certified as a small business and have either a Class A or applicable Class C contractor's license. The bid requires various supporting documentation, including a Subcontractor List, Small Business Status form, and California Company Preference form. The project involves replacing culverts ranging from 14" x 23" to 24" in size, with specific requirements for materials, installation, and environmental compliance. Additional requirements include erosion control measures, seed mix specifications, and adherence to California civil rights and nondiscrimination laws. The Department encourages Disabled Veteran Business Enterprise (DVBE) participation but does not establish a specific contract goal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D.Bid_Proposal_Sheets-F.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 10A2836 The following is the Table of Contents for the Small Business Minor B Package documents:
Table of Contents 1 Page
Invitation for Price Quote–Cover Letter 1 Page General Bidders Instructions/Checklist 2 Pages
Proposed Form of Agreement, STD 213 2 Pages
Information Handout 20 Pages
Specifications 34 Pages Link to the 2024 Edition of the Standard Specifications Page 35
The Bid Package contains 19 Project Plans for this project.
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
Invitation for Price Quote (IFPQ)
Contract No. 10A2836 Quote Due Date: October 2, 2025
Prospective Contractors:
California Department of Transportation (Caltrans/Department) has issued the enclosed Invitation for Price Quote (IFPQ) for services described in the enclosed proposed contract.
Please read the entire contract package and all attachments carefully. If you desire to submit a quote, complete the Price Quote sheet and email it to the Analyst listed in the IFPQ. Your signature affixed to and dated on the quote proposal shall constitute a certification under penalty of perjury, unless exempted, that you have complied with the nondiscrimination program requirements of Government Code Section 12990 and Title 2, California Code of Regulations, Section 11102, and the nondiscrimination program requirements of Title VI of the Civil Rights Act of 1964, 49 Code of Federal Regulations (CFR) Part 21, and 23 CFR Part 200.
Award of this contract will be to the lowest responsible contractor whose quote complies with all requirements as described in this IFPQ.
If your bid is more than $461,000.00, it will be rejected per Public Contract Code Section 10105(b).
Contractor must be a Certified Small Business at the time of the quote date.
Invitation for Price Quote https://dot.ca.gov/programs/procurement-and-contracts/
“Improving lives and communities through transportation.”
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th Street, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
General Contractors Instructions/Checklist
Solicitation No. 10A2836
A complete bid or bid package will consist of the items identified below.
Complete this checklist to confirm the items in your bid package. Place a check mark or “X” next to each item that you are submitting to Caltrans. All attachments identified below (unless noted otherwise) are required and must be attached in your Bid Package submittal (links to documents are not acceptable), or your bid may be considered non-responsive. It is the prospective contractor’s responsibility to confirm receipt of their bid before the time the bid is due. Omission of documents or bids lost during transmission will be deemed non-responsive.
Return this checklist with your bid package.
Quotes omitting this information may be regarded as non-responsive and rejected.
Do not submit company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
Price Quote Proposal for Unit Items (ADM-1509). Complete and sign the Price Quote Proposal for Unit Item Sheet(s).
Subcontractor List (DES-OE-0102.2.C) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTDESOE0102.2C. List all subcontractors, including DVBEs, as applicable to the requirements of this solicitation.
Contract Requirements (ADM-0378) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0378
Small Business Status (DOT DES-OE-0102.4) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4.
California Company Preference (DES-OE-0102.9) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTDESOE0102.9.
Certified DVBE Summary (DOT ADM-4015) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015.
Contractor Certification Clauses (CCC 04/2017) can be downloaded at https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.
California Civil Rights Laws Certification (DOT ADM-0076) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076.
Darfur Contracting Act Certification (DOT ADM-0077) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077.
DOT DES-OE-0102.14 In-Use Off-Road Diesel-Fueled Vehicle List can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214.
https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTDESOE0102.2C https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0378 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTDESOE0102.9 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015 http://www.dgs.ca.gov/ols/Resources/StandardContractLanguage.aspx https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214
“Improving lives and communities through transportation.”
The following forms and information will be required at the time of contract award and signature.
Payment Bond (ADM-2009) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009
Certificate(s) of Insurance
Postconsumer-Content Certification (CalRecycle 74) can be downloaded at https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/1114 80&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb.
Payee Data Record (STD 204) can be downloaded at https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf. This form is designed to allow vendors to self-report information needed for accurate and complete reporting of vendor payment income.
Completion of this form is required by all vendors providing goods and/or services to the State of California.
Contract Will Not Be Executed Without These Documents.
https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
PROPOSED FORM OF AGREEMENT
DO NOT COMPLETE
Continued on the following sheets, each bearing the Agreement/Contract number.
The provisions on the following pages hereof constitute a part of the Agreement
TBD
10A2836
1. Contractor agrees to indemnify, defend, and save harmless the State, its officers, agents, and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, materialmen, laborers and any other person, firm or corporation furnishing or supplying work services, materials or supplies in connection with the performance of this contract, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be injured or damaged by Contractor in the performance of this contract.
2. Contractor, and the agents and employees of Contractor, in the performance of the Agreement, shall act in an independent capacity and not as officers or employees or agents of State of California.
3. The State may terminate this agreement and be relieved of the payment of any consideration to Contractor should Contractor fail to perform the covenants herein contained at the time and in the manner herein provided. In the event of such termination the State may proceed with the work in any manner deemed proper by the State. The cost to the State shall be deducted from any sum due Contractor under this agreement, and the balance, if any, shall be paid Contractor upon demand.
4. Without the written consent of the State, this Agreement is not assignable by Contractor either in whole or in part.
5. Time is of the essence in this Agreement.
6. No alteration or variation of the terms of this contract shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein, shall be binding on any of the parties hereto.
7. The consideration to be paid Contractor, as provided herein, shall be in compensation for all of Contractor’s expenses incurred in the performance hereof, including travel and per diem, unless otherwise expressly so provided.
State of California California State Transportation Agency Department of Transportation
“Provide a safe and reliable transportation network that serves all people and respects the environment”
M e m o r a n d u m
To: MR. JASON MILLER Date: February 18, 2025 Senior Transportation Engineer File: 10-CAL-4 PM35.6-37.5 Branch Chief, District 10 10-1N240 Maintenance Design 1021000129
From: DIVISION OF ENGINEERING SERVICES
GEOTECHNICAL SERVICES
OFFICE OF GEOTECHNICAL DESIGN NORTH
Subject: GEOTECHNICAL INFORMATIONAL HANDOUT FOR CULVERT REPLACMENTS
ASSOCIATED WITH PROJECT 10-1N240
INTRODUCTION
At the request of District 10 Maintenance Design, the Office of Geotechnical Design
- North (OGDN) is providing this Maintenance Support Memorandum to address concerns brought up in the 100% PS&E review regarding potential for “hard rock” conditions that could be encountered during culvert replacements included in this projects scope of work. This memo is being prepared to provide Geotechnical information and recommendations to assist District Construction and project contractors and bidders. It is recommended that this memo be included in the “Informational Handout to Contractors and Bidders” for this project.
No subsurface site investigation, laboratory testing or analysis was performed for this memo. Information and opinions provided in this memo are based on a review of existing literature, plans, and documents provided by Maintenance Design and professional judgement based on visual inspections of the culvert locations and materials exposed on the ground surface(s) in the near vicinity of the culverts proposed for replacement. A site reconnaissance was performed in support of the memo on February 8, 2025.
Pertinent Reports and Investigations The following documents were used in preparing this report.
1. United State Department of Agriculture, National Conservation Service Web Soil Survey http://websoilsurvey.nrcs.usda.gov, “Calaveras County, California, Stanislaus National Forest, California, Parts”, 2023.
Contract No. 10A2836 http://websoilsurvey.nrcs.usda.gov/
MR. JASON MILLER GEOTECHNICAL INFORMATIONAL HANDOUT
February 18, 2025 10-CAL-4 PM 35.6-37.5 Page 2 10-1N240
1021000129
“Provide a safe and reliable transportation network that serves all people and respects the environment”
2. California Geologic Survey, “Geologic Map of the Sacramento Quadrangle, California”, 1:250,000, Wagner, D.L., Jennings, C.W., Bedrossian, T.L. and Bortugno, E.J., 1981.
3. Google Earth Aerial Imagery, Photo dated, May 2024.
Caltrans Information
1. Caltrans Culvert Inventory Database, CIMS Statewide Web Viewer Culvert ID: 300045203745, 10-CAL-4 PM 37.45 Culvert ID: 300046003751, 10-CAL-4 PM 37.51 Culvert ID: 300046003747, 10-CAL-4 PM 37.47 Culvert ID: 300040003563, 10-CAL-4 PM 35.63
2. Draft Project Plans provided by Maintenance Design, dated 1/16/2025.
EXISTING SITE CONDITIONS
As stated, above information regarding existing site conditions provided below was generated from review of existing documents and a site reconnaissance performed on February 8, 2025.
Based on our review of the project plans, it is our understanding that 4- existing corrugated metal pipe (CMP) culverts are proposed to be removed and replaced with reinforced concrete pipes (RCP). At two locations the culverts will be upsized from 18 inch to 24 inch and at the other two locations the culverts will be roughly the same size as the existing but due to shape variances will be slightly wider in width and slightly shorter in height, see Table 1 below.
Table 1: Culvert Information Culvert
Plan Location
Post Mile Existing Culvert Diameter (inches)
Replacement Culvert Diameter (Inches)
1 35.63 18 24 2 37.51 18 14x23 Elliptical 3 37.47 18 14x23 Elliptical 4 37.45 18 24
Based on the geologic map and soil survey reviewed, material mapped within the area of Post Mile (PM) 37.5, culvert locations 2, 3 and 4, consists of variable thick (35- 65 inches) of sandy-clay soil layers overlying Rhyolitic tuff and sedimentary rocks associated with the Valley Springs Formations. During our site reconnaissance moderately weathered, moderately hard to hard, granitic cobbles and boulders up to 3.5 feet in maximum dimension were observed on the ground surface in the near vicinity of the existing drainage channel and within the drainage channel bank (see attached photolog, photos 1&2). Additionally, just west of the outlet for culvert 1, what appeared to be highly weathered, soft to moderately hard conglomerate
Contract No. 10A2836 https://caltrans-cip.dot.ca.gov/portal/apps/webappviewer/index.html?id=f048392f72384291b436f357b68d49e1
Page 3 10-1N240 1021000129
“Provide a safe and reliable transportation network that serves all people and respects the environment” bedrock was exposed in the channel flow line (see attached photolog, photos 3&4).
The conglomerate bedrock observed was overlain by variable 3 to 3.5 feet of sandy clay soils forming the banks of the drainage channel.
Based on the geologic map and soil survey reviewed, material mapped within the area of Post Mile (PM) 35.6, culvert location 1, consists of variable thick (6-79 inches) of sandy-loam with gravels and cobbles, soil layer(s) overlying undifferentiated metasedimentary or volcanic rocks belonging to the Calaveras Complex. During our site reconnaissance moderately weathered, moderately hard to hard, volcanic boulders up to 12 inches in maximum dimension and what appeared to be a larger boulder or bedrock outcrop of moderately weathered, moderately hard phyllite were observed on the ground surface or in the drainage channel flow line 10 feet east of the culvert inlet head wall (see attached photolog, photo 5&6). However, soil probing in the drainage channel flow line at the culvert inlet indicated a hand probe could be pushed with relative ease into the subsurface material.
In addition to our visual observations, a fiberglass soil probe hand pushed into the subsurface material was utilized to probe penetration depths at each culvert location vertically into the ground at the drainage flow line elevation and sub-horizontally into the drainage channel banks at or in the near vicinity of each culvert inlet and outlet. Depth of probe penetration is provided in Table 2 below.
PRELIMINARY CONCLUSIONS AND RECOMMENDATIONS
Hard rock excavation or difficult ripping in excavations is typically encounter for two different reasons:
1. Hard boulders sufficient in size to exceed the horsepower or weight of the equipment being utilized to perform the excavation with.
2. Moderately weathered to fresh, moderately hard to hard bedrock with limited discontinuities (joints, fractures, foliation) being encountered in the excavation.
Table 2 below summarizes our evaluation based on our site reconnaissance of the probability of a contractor encountering one or both conditions while performing the excavation for the removal and replacement of the proposed culverts for this project. Additional information about these probabilities and recommendations should one or both conditions be encountered can be found in the paragraphs following Table 2.
Page 4 10-1N240
“Provide a safe and reliable transportation network that serves all people and respects the environment”
Table 2: Soil Probe Penetration and Probability of Encountering Hard Rock in Excavation Culvert
Location Soil Probe
Penetration (Inches)
Channel Flowline
(Inlet/Outlet)
Soil Probe Penetration
(Inches) Channel
Banks (Inlet/Outlet)
Probability of Encountering Bedrock in Excavation
Probability of Encountering
Oversized Material in Excavation
(cobbles and boulders)
1 2/1 36/* Moderate High 2 12/30 18/24 Low High 3 6/12 24/24 Low High 4 2/1 18/24 Moderate High
* Not applicable culvert outlet above ground surface elevation
Based on the documents reviewed and our site reconnaissance, there is a high probability of encountering cobbles and boulders in the proposed excavations at each culvert location. Pending the type and horsepower of the equipment the contractor utilizes to perform the excavation work with, to reach finish grade and/or design width for the excavation may require over excavation to remove the boulders or hard rock excavation means (hoe-ram, jackhammer, etc,) to reduce or break up the boulder(s) to achieve finish grade. If over excavation and removal of the boulders is utilized, it is recommended that Structure Backfill conforming to Section 19-3 of the Standard Specification be utilized to fill the void resulting from the removal of the boulder(s) to bring the excavation back up to finish grade.
Based on the documents reviewed and our site reconnaissance, there is a moderate probability of encountering metasedimentary (Phyllite) and conglomerate bedrock at culvert locations 1 and 4 respectively. At each of these locations, in the near surface the rock is considered highly to moderately weathered and could be considered difficult to rip (excavate). The bedrock material encountered during our site reconnaissance could be penetrated up to 1 inch with the pick end of a geologic hammer (see photolog, Photos 4&6) Pending the type and horsepower of the equipment the contractor utilizes to perform the excavation work with, to reach finish grade for the proposed replacement culvert diameters and associated drop inlets, may require difficult ripping techniques (excavator bucket with rock teeth) or use of a hoe-ram, jackhammer, or other means to break up the rock to achieve finish grade or excavation depths.
As stated above, the opinions and recommendations expressed in the memorandum are based on review of publish data, project plans provided by the District, visual site reconnaissance perform and near surface field testing of the materials at the site.
Page 5 10-1N240
“Provide a safe and reliable transportation network that serves all people and respects the environment”
William Webster
CERTIFIED
ENGINEERING
GEOLOGIST
No. 2485
EXPIRES: 2/28/26
It is recommended that this Maintenance Support Memorandum be included in “Informational Handout to Contractors and Bidders” as a portion of the bid packet for this project.
PROPOSED FUTURE INVESTIGATIONS
No additional work is proposed at this time. Should you have questions regarding information or recommendations provided in this memo or require additional services, please do not hesitate to contact Bill Webster at 805-305-5451.
Prepared by:
WILLIAM WEBSTER, CEG SEGARAN LOGESWARAN, PE
Senior Engineering Geologist Senior Transportation Engineer Office of Geotechnical Design – North Office of Geotechnical Design – North
Report Copy List Devin Nguyen – District 10 Maintenance Design Jose Alicea – District 10 Maintenance Engineering Geotechnical Archive (GeoDOG)
Photo 1 Granitic Boulders lining channel culvert 1oc. 4 Photo 2 Measured 3.5’ boulder culvert loc. 4
Photo 3 Conglomerate bedrock exposed in flow line culvert loc. 4 Photo 4 Pick imbedded in conglomerate bedrock culvert loc. 4
CALTRANS
Geotechnical Services Office of Geotechnical Services Geotechnical Design Branch-North
Page
10-CAL-4 PM 35.6/37.5
MAINTENANCE SUPPORT MEMORANDUM
Photolog EFIS: 1021000129
Date: February 2025
Photo 5: 12” cobble in channel culvert 1oc. 1 Photo 6: Pick imbedded in phyllite boulder or bedrock culvert loc. 1
CALTRANS
Geotechnical Services Office of Geotechnical Services Geotechnical Design Branch-North
Page
10-CAL-4 PM 35.6/37.5
MAINTENANCE SUPPORT MEMORANDUM
Photolog EFIS: 1021000129
Date: February 2025 x x x x x
D E
S I
G N
E
G I
N E
E R
L A
S T
R
V I S I
O N
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
PROJECT PLANS FOR CONSTRUCTION ON
STATE HIGHWAY
P R
O J
E C
M A
N A
G E
R
SHEET
DEL NORTE
SISKIYOU MODOC
HUMBOLDT
TRINITY SHASTA LASSEN
TEHAMA
MENDOCINO
GLENN BUTTE
PLUMAS
SIERRA
NEVADA
PLACER
Y U B
A
COLUSA
LAKE
YOLO
NAPASONOMA
EL DORADO
MARIN
AMADOR
ALPINE
C A L
A V E R
A S
CONTRA
COSTA
TUOLUMNE
MONO
SANTA
CLARA
SANTA CRUZ
S T
A N
IS
L A
U S
MARIPOSA
MERCED
M A
D E R
A
FRESNO
MONTEREY
INYO
TULARE
KINGS
OBISPO KERN
SANTA
BARBARA
VENTURA
LOS ANGELES
SAN BERNARDINO
RIVERSIDE
IMPERIALSAN DIEGO
ORANGE
SOLANO
ALAMEDA
M E
N T
O
S A
C R
A
J O
A Q
U
INS
A N
SAN
BENITO
SAN
LUIS
S U
T T
E R
SAN FRANCISCO
SAN MATEO
Dist COUNTY ROUTE
TOTAL
SHEETSTOTAL PROJECT
LOCATION MAP
D A
P L
O T
T
D
M A
R
POST MILES
No.
OF LICENSE AS SPECIFIED IN THE "NOTICE TO BIDDERS."
INDEX OF PLANS
T I
P L
O T
T
D
R
R
THE CONTRACTOR SHALL POSSESS THE CLASS (OR CLASSES)
PLANS APPROVAL DATE
R E
G I S
T E
R E
D P
ROFESSIONA
L
E N
G I
N E
E R
S
T A
TE
OF CALIF
ORN
IA
No.
Exp.
CIVIL
PROJECT ENGINEER
REGISTERED CIVIL ENGINEER
DATE
COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET.
RESPONSIBLE FOR THE ACCURACY OR
OFFICERS OR AGENTS SHALL NOT BE
THE STATE OF CALIFORNIA OR ITS
CONTRACT No.
PROJECT ID
PROJECT NUMBER & PHASEUNIT
1021000129ab001.dgn s147885USERNAME =>
DGN FILE =>
RELATIVE BORDER SCALE
IS IN INCHES
0 2 31
CALTRANS WEB SITE IS: HTTP//WWW.DOT.CA.GOV/BORDER LAST REVISED 9/30/2012
10 1 XXCal 35.6/37.5
TO BE SUPPLEMENTED BY STANDARD PLANS DATED 2018
10210001291
J A
S O
B
I L
L E
R J
A S
O
B
I L
L E
R
NO SCALE
JONATHAN DANG
C54050
12-31-21
XX/XX/XX
X X
X X
X X
XXXXXX XX, XXXX
10-1N2404
PMCOUNTY ROUTE DESCRIPTIONLoc No.
1 Cal
LOCATIONS OF CONSTRUCTION
Cal
35.63
37.45
PM 35.3
Begin Work
JUNCTION OF ROUTE 4 AND MORRIS ROAD
MEADOW VIEW Ln
HILLCREST Dr
CANYON VIEW Dr
MORAN Rd
SHEEPRANCH Rd
MORRIS Rd
MEADOW Rd
AVERY HOTEL Rd
HOWARD Ct
RED TAIL
HAWK Rd
RED APPLE Dr
0.1 MILE NORTH OF CRESCENT COVE
AND SPECIAL PROVISIONS BOOK.
CONTRACT IS INCLUDED IN THE NOTICE TO BIDDERS
THE STANDARD PLANS LIST APPLICABLE TO THIS
X-X XXXXXXXXXXXXXXXXXXXXXXXXXX
X-X XXXXXXXXXXXXXXXXXXXXXXXXXX
X-X XXXXXXXXXXXXXXXXXXXXXXXXXX
X TITLE AND LOCATION MAP
No. DESCRIPTION
SHEET
AND AT SHEEP RANCH ROAD
AT 0.4 MILE WEST OF HORSESHOE DRIVE
IN CALAVERAS COUNTY IN AND NEAR AVERY
Hunter
Reservoir
A n g e l s
C r
UTICA
POWERHOUSE
Rd
FOLENDORF Rd
BRICE
STATION Rd
CEDAR VISTA Dr
FOREST MEADOWS Dr
NORTHWOOD Dr
FOSTER Ct
DARBY RUSSELL Rd
CRESCENT COVE
US FORESTRY
Dept
LASHKOFF PLACE
RO
UTE 4
STRAWBERRY
HILL Rd
Red
Apple
Hathaway
Pines
Avery
To Murphys
M i l l
C r
PM 37.8
End Work
HUNTER DAM Rd
HORSESHOE Dr
INFORMATION HANDOUT Contract No. 10A2836Page 1 of 13 s147885 Line s147885 Line s147885 Line s147885 Line s147885 Line s147885 Oval s147885 Typewritten Text s147885 Oval s147885 Oval s147885 Oval s147885 Oval s147885 Typewritten Text s147885 Typewritten Text s147885 Typewritten Text s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culverts #1 to #5
CAL-4-PM 37.45
s147885 Rectangle s147885 Typewritten Text
CAL 37.45
s156138 Text Box s156138 Text Box
Rectangle s147885 Typewritten Text Culvert #6
CAL-4-35.63
s147885 Line s147885 Oval s147885 Typewritten Text s156138 Text Box s156138 s147885 Typewritten Text Culvert #6
CAL-4-35.63
Screenshot is From Culvert Inspection Program Website s156138
Contract No. 10A2836 s156138 s147885 Oval s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culvert #1
CAL-4-PM 37.45
s147885 Rectangle s147885 Typewritten Text
CAL 37.45
s156138 Text Box Contract No. 10A2836 s156138 s147885 Oval s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culvert #2
CAL-4-PM 37.45
s156138 Text Box Contract No. 10A2836 s156138 s147885 Oval s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culvert #3
CAL-4-PM 37.45
s156138 Text Box Contract No. 10A2836 s156138 s147885 Typewritten Text Culvert #4
CAL-4-PM 37.45
s147885 Typewritten Text Morris Rd s147885 Line s147885 Oval s147885 Typewritten Text s156138 Text Box Contract No. 10A2836 s156138 s147885 Oval s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culvert #5
CAL-4-PM 37.45
s147885 Typewritten Text Avery Sheep Ranch Rd s156138 Text Box Contract No. 10A2836 s156138 s147885 Oval s147885 Typewritten Text s147885 Rectangle s147885 Typewritten Text Culvert #6
CAL-4-35.63
s156138 Text Box Contract No. 10A2836 s156138 s147885 Typewritten Text Culvert #6
CAL-4-35.63
Drainage Inlet s156138 Text Box Contract No. 10A2836 s156138 s147885 Typewritten Text Culvert #6
CAL-4-35.63
Drainage Outlet s156138 Text Box Contract No. 10A2836 s156138
No. County Route Postmile System No. Inlet End Treatment Outlet End Treatment Diameter (ft) Number of Barrels Total Length of All Barrels Status LATITUDE LONGITUDE
1 CAL 4 35.63 300040003563 300040003563002 300040003563001 1.5 1 66.88 Poor 38.18429639 -120.3755333
2 CAL 4 37.45 300044003745 300044003745002 300044003745001 1.5 1 32.45 Poor 38.20382784 -120.3698712
3 CAL 4 37.45 300045203745 300045203745002 300045203745001 1.5 1 120.98 Fair 38.20387425 -120.3697172
4 CAL 4 37.45 300045203745 300045203745003 300045203745002 1.5 1 126.83 Fair 38.20420862 -120.3695981
5 CAL 4 37.47 300046003747 300046003747002 300046003747001 1.5 1 45.00 Fair 38.20434974 -120.3697889
EA 1N240 CAL - 4 - 35.63 & 37.45
s156138 Typewritten Text Contract No. 10A2836 s156138
Small Business Minor B Solicitation
Quotes open: Thursday, October 2, 2025 Dated: September 19, 2025
Revised 3/27/2025
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
Notice to Bidders And
Special Provisions
For Construction On State Highway In Calaveras County in and near Avery at 0.4 mile west of Horseshoe Drive and at 0.1 mile north of Moran Road.
In District 10 On Route 4 Under
Standard Specifications dated 2024
Project plans approved August 19, 2025 Standard Plans dated 2024
Identified by Contract No. 10A2836
10-Cal-4-35.6, 37.5 Project ID 1021000129
SPECIAL NOTICES
California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew a contract with a State agency with respect to any contract in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the contract is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the Certification attached.
Assumption of Risk and Indemnification Regarding Exposure to Environmental Health Hazards In addition to, and not a limitation of, Contractor’s indemnification obligations contained elsewhere in this Agreement, Contractor hereby assumes all risks of the consequences of exposure of Contractor’s employees, agents, Subcontractors, Subcontractors’ employees, and any other person, firm, or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement, to any and all environmental health hazards, local and otherwise, in connection with the performance of this Agreement. Such hazards include, but are not limited to, bodily injury and/or death resulting in whole or in part from exposure to infectious agents and/or pathogens of any type, kind, or origin. Contractor also agrees to take all appropriate safety precautions to prevent any such exposure to Contractor’s employees, agents, Subcontractors, Subcontractors’ employees, and any other person, firm, or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement. Contractor also agrees to indemnify and hold harmless Caltrans, the State of California, and each and all of their officers, agents, and employees, from any and all claims and/or losses accruing or resulting from such exposure. Except as provided by law, Contractor also agrees that the provisions of this paragraph shall apply regardless of the existence or degree of negligence or fault on the part of Caltrans, the State of California, and/or any of their officers, agents, and/or employees.
Mandatory Organic Waste Recycling
It is understood and agreed that pursuant to Public Resources Code Sections 42649.8 et seq., if Contractor generates two (2) cubic yards or more of organic waste or commercial solid waste per week, Contractor shall arrange for organic waste recycling services or commercial waste recycling services that separate/source organic waste recycling. Contractor shall provide proof of compliance, i.e. organic waste recycling services or commercial waste recycling services that separate/source organic waste recycling, upon request from Caltrans Contract Manager.
ADA Compliance
All entities that provide electronic or information technology or related services that will be posted online by Caltrans must be in compliance with Government Code Sections 7405 and 11135 and the Web Content Accessibility Guidelines (WCAG) 2.0 or subsequent version, published by the Web Accessibility Initiative of the World Wide Web Consortium at a minimum Level AA success. All entities will respond to and resolve any complaints/deficiencies regarding accessibility brought to their attention.
Satisfying a Self-Insured Retention (SIR) All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to the Contractor shall also be available and applicable to the State.
Electronic Signatures Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures for this Agreement. Documents that are referenced by this Agreement may still require manual signatures.
Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law . By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) intends to provide GenAI as a deliverable to the State; or
2) intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) functionality of a State system,
b) risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)
California Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Bid Bonds
Bid bonds are only required for agreements over $461,000.00. Contractors are no longer required to purchase and submit a Bid Bond when bidding on Minor B Projects. Section 2-1.34 of the 2024 Standard Specifications is not applicable to Minor B Projects.
Waste Disposal
Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq
CONTRACT NO. 10A2836
The special provisions contained herein have been prepared by or under the direction of the following Registered
Persons.
HIGHWAYS
REGISTERED CIVIL ENGINEER No.
Exp.
CIVIL
C67128
JASON B.
MILLER
09-30-26
08/29/26
Mobile User
Table of Contents
Notice to Bidders
Special Provisions
Division I General Provisions
1 General
2 Bidding
3 Contract Award and Execution
4 Scope of Work
5 Control of Work
6 Control of Materials
7 Legal Relations and Responsibility to The Public
8 Prosecution and Progress
9 Payment
Division II General Construction
12 Temporary Traffic Control
14 Environmental
Division III Earthwork and Landscape
21 Erosion Control
Division V Surfacings and Pavement
39 Asphalt Concrete
Division VII Drainage Facilities
61 General
Division VIII Miscellaneous Construction
73 Concrete Curbs and Sidewalks
Division IX Traffic Control Devices
84 Markings
Division XI Materials
90 Concrete
Link to the 2024 Edition of the Standard Specifications……………………………………………….…….35
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. When applicable, revised standard plans (RSPs) listed below are included in the project plans.
ABBREVIATIONS, LINES, SYMBOLS, AND LEGEND
A3A Abbreviations (Sheet 1 of 3) A3B Abbreviations (Sheet 2 of 3) A3C Abbreviations (Sheet 3 of 3) A10A Legend - Lines and Symbols (Sheet 1 of 5) A10B Legend - Lines and Symbols (Sheet 2 of 5) A10C Legend - Lines and Symbols (Sheet 3 of 5) A10D Legend - Lines and Symbols (Sheet 4 of 5) A10E Legend - Lines and Symbols (Sheet 5 of 5)
PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT MARKINGS
A20A Pavement Markers and Traffic Lines - Typical Details A20B Pavement Markers and Traffic Lines - Typical Details
RUMBLE STRIP
A40D Center Line Rumble Strip Details - Ground-In Indentations
EXCAVATION AND BACKFILL
A62A Excavation and Backfill - Miscellaneous Details A62D Excavation and Backfill - Concrete Pipe Culverts A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method
OBJECT MARKERS, DELINEATORS, CHANNELIZERS, AND BARRICADES
A73A Object Markers A73B Markers
P74 Pavement Edge Treatments P76 Pavement Edge Treatments - New Construction
DRAINAGE INLETS, PIPE INLETS AND GRATES
D71 Drainage Inlet Markers D73F Precast Drainage Inlet Notes D73G Precast Drainage Inlet Tables D74 Drainage Inlet Details D75B Concrete Pipe Inlets D75C Pipe Inlets - Ladder and Trash Rack Details D77B Grate Details No. 2
CONCRETE PIPE - DIRECT DESIGN METHOD
D79 Precast Reinforced Concrete Pipe - Direct Design Method D79A Precast Reinforced Concrete Pipe - Direct Design Method
CONSTRUCTION LOADS ON CULVERTS AND STRUT DETAILS
D88 Construction Loads on Culverts
PIPE CULVERT HEADWALLS, ENDWALLS, WINGWALLS AND JUNCTION
STRUCTURE
D89B Pipe Culvert Headwalls - Straight and "L"
FLARED END SECTIONS
D94A Metal and Plastic Flared End Sections D94B Concrete Flared End Sections
PIPE COUPLING AND JOINT DETAILS
D97H Reinforced Concrete Pipe or Non-Reinforced Concrete Pipe - Standard and
Positive Joints
LANDSCAPE AND EROSION CONTROL
H1 Landscape and Erosion Control Symbols H51 Erosion Control Details - Fiber Roll and Compost Sock
TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN
T1A Temporary Crash Cushion, Sand Filled (Unidirectional) T1A1 Temporary Crash Cushion, Sand Filled (Unidirectional) T1B Temporary Crash Cushion, Sand Filled (Bidirectional) T2 Temporary Crash Cushion, Sand Filled (Shoulder Installations) T3A Temporary Railing (Type K) T3B Temporary Railing (Type K) T3C Temporary Barrier System (Cross Bolt) T3D Temporary Barrier System (Cross Bolt) T3E Temporary Barrier System (Cross Bolt) RSP T3F Temporary Barrier System (Cal F-23) RSP T3F2 Temporary Barrier System (Cal F-23) RSP T3G Temporary Barrier System (Staking or Anchoring) RSP T3G2 Temporary Barrier System (Staking or Anchoring)
TEMPORARY TRAFFIC CONTROL SYSTEMS
T9 Traffic Control System Tables for Lane and Ramp Closures T13 Traffic Control System with Reversible Control on Two Lane Conventional
Highways T13A Traffic Control System Two Lane Conventional Highways T13B Traffic Control System Two Lane Conventional Highways
TEMPORARY WATER POLLUTION CONTROL
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout
Facility)
ROADSIDE SIGNS
RS1 Roadside Signs - Typical Installation Details No. 1 RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2 RS4 Roadside Signs - Typical Installation Details No. 4
OVERHEAD AND ROADSIDE SIGN PANELS
S89 Roadside Sign - Formed Single Sheet Aluminum Panel S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape S95 Roadside Single Sheet Aluminum Signs, Diamond Shape
Notice to Bidders Quotes open: October 2, 2025 Dated: September 19, 2025 General work description: Culvert Replacement The Department of Transportation (Department) will receive quotes for Construction On State Highway In Calaveras County in and near Avery at 0.4 mile west of Horseshoe Drive and at 0.1 mile north of Moran Road.
District-County-Route-Post Mile: 10-Cal-4-35.6, 37.5 Prime Contractor must have either a Class A license or an applicable Class C license.
Prime Contractor must be a certified Small Business under Section 2-1.05.
Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation.
Bids must be on a unit price basis.
Complete the work within 25 working days.
The estimated cost of the project is $359,224.00.
The Department will receive quotes until 2:15 p.m. on the quotes open date at:
Analyst’s Email: tammy.p.tran@dot.ca.gov *Put SB Contract # in the Subject Line of the Email
Quotes received after this time will not be accepted.
No pre-bid meeting is scheduled for this project.
Quote Packages, including Invitation for Quote, Notice to Bidders, Special Provisions, and Project Plans are available in electronic format only. These documents may be viewed and obtained at:
Cal eProcure website: https://caleprocure.ca.gov/pages/index.aspx Standard Specifications dated 2024 Standard Plans dated 2024
Present bidders’ inquiries to the District at:
Attn: District 10 Construction Bidder Inquiry Desk 1976 E. Dr. Martin Luther King Jr. Blvd Stockton, CA 95205 Email Bidder Inquiry Desk : CR.Bidders.Questions@dot.ca.gov
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Department will open bids under Section 2-1.43.
There will be no public opening of quotes. Quotes results will not be listed on the Internet.
Request quote results at:
Analyst’s Name: Tammy Tran Email: tammy.p.tran@dot.ca.gov Phone: (279) 599-7880
District office addresses are provided in the Standard Specifications.
mailto:tammy.p.tran@dot.ca.gov https://caleprocure.ca.gov/pages/index.aspx mailto:CR.Bidders.Questions@dot.ca.gov mailto:tammy.p.tran@dot.ca.gov
Prevailing wages may be required on this Contract under Section 7-1.02K(2). The Director of the California Department of Industrial Relations (DIR) determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located at https://dot.ca.gov/programs/construction/labor-compliance.
Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to http://ppmoe.dot.ca.gov/des/oe/contractor-info.html. Additional information is provided in the Excluded Parties List System at https://www.ojp.gov/tfsc/doj_ojp_tfsc_excluded_parties_guide_508.
Standard Specifications and Standard Plans may be viewed at Department’s Division of Design website at https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications.
http://www.dir.ca.gov/ https://dot.ca.gov/programs/construction/labor-compliance http://ppmoe.dot.ca.gov/des/oe/contractor-info.html https://www.ojp.gov/tfsc/doj_ojp_tfsc_excluded_parties_guide_508 https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Special Provisions
Division I General Provisions 1 General
Add to section 1-1.01:
Bid Items and Applicable Sections Item code
Item description Applicable section
652317 A
14" X 23" ELLIPTICAL REINFORCED CONCRETE PIPE (CLASS
III, RGJ)
652318 A
19" X 30" ELLIPTICAL REINFORCED CONCRETE PIPE (CLASS
III, RGJ)
705207 A
14" X 23" ELLIPTICAL STEEL FLARED END SECTION 70
705209 A
19" X 30" ELLIPTICAL CONCRETE FLARED END SECTION 70
Replace the definition of Bid Item List in Section 1-1.07B with:
Bid Item List: List of bid items and the associated quantities on the Quote Proposal for Unit Quote Items.
Replace the definition of Director in Section 1-1.07B with:
Director: Department’s District Director.
Add the following to Section 1-1.07B:
Quote: Bid for an agreement with bidders limited to only Small Businesses under Section 2-1.05.
Add to section 1-1.09:
This project is in a freeze-thaw area.
Add the following to the table in Section 1-1.11:
Reference or agency or department unit
Website Address Telephone Number
Office of Civil Rights https://dot.ca.gov/programs/ civil-rights
1823 14th Street Sacramento, CA 95811 (916) 324-0449
2 Bidding
Replace Section 2-1.05 with:
2-1.05 Bidder Eligibility Bidder must be certified as a small business at the time and date of bid opening and on the date of contract award or have submitted a complete application to the Department of General Services (DGS), Office of Small Business and DVBE Services. The complete application and any required substantiating documentation must be received by DGS by 5:00 p.m. on the bid opening date.
https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights
Replace Section 2-1.06A with:
2-1.06A General Standard Specifications and Standard Plans may be viewed at Bidders’ Exchange website.
The Bid Package may be viewed and obtained at the Cal eProcure website.
The Bid Package includes the Invitation for Bid, Notice to Bidders, Special Provisions, Project Plans, Revised Standard Plans, and a web link to the Standard Specifications and Standard Plans.
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout
• Geotechnical Information Handout
• List of Existing Traffic Management System
Elements
Replace the 3rd paragraph of Section 2-1.06B with:
If an Information Handout or cross sections are available, you may view and obtain them at the Cal eProcure website.
Add the following to Section 2-1.10 Submit the form with your bid.
Replace section 2-1.11 with:
2-1.11 IN-USE OFF-ROAD DIESEL-FUELED VEHICLE LIST
Section 2-1.11 applies to non-informal-bid contracts.
Complete and submit the In-Use Off-Road Diesel-Fueled Vehicle List form under section 2-1.33.
On the In-Use Off-Road Diesel-Fueled Vehicle List form, list each fleet used by you or your subcontractor to perform work and is subject to 13 CCR § 2449 et seq. Submit a copy of a valid Certificate of Reported Compliance (13 CCR § 2449, subdivision (n)) for each fleet listed on the form within 10 days of bid opening. Failure to list a fleet used by you or your subcontractor to perform work on the In-Use Off-Road Diesel-Fueled Vehicle List form may result in a nonresponsive bid. Failure to submit the Certificate of Reported Compliance for a fleet listed on the In-Use Off-Road Diesel-Fueled Vehicle List form may result in a nonresponsive bid.
Replace Section 2-1.15 with:
2-1.15 Disabled Veteran Business Enterprises (DVBE) 2-1.15A General Take necessary and reasonable steps to ensure that DVBEs have opportunity to participate in the Agreement.
Comply with Military and Veterans Code Sections 999 et seq.
Department encourages bidders to obtain DVBE participation to ensure Department achieves its State-mandated overall DVBE goal.
If you obtain DVBE participation:
1. Complete and submit the Certified DVBE Summary form under with your bid. List all DVBE participation on this form.
2. List each first tier DVBE subcontractor in the Subcontractor List form, regardless of percentage of the total bid.
If a DVBE joint venture is used, submit the joint venture agreement with the Certified DVBE Summary form.
List each first tier DVBE, subcontractor on the Subcontractor List (DES-OE-0102C) regardless of percentage of the total bid.
DVBEs must be certified by the bid opening date and remain certified through contract award.
Delete Section 2-1.18.
Delete Section 2-1.27.
Replace Section 2-1.33 with:
2-1.33 Bid Document Completion and Submittal Complete forms in the Bid Package. Submit the forms with your bid.
Failure to submit the forms and information as specified may result in a nonresponsive bid.
If an agent other than the authorized corporate officer or a partnership member signs the bid, file a Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be nonresponsive.
Delete Section 2-1.34
Delete the second paragraph of Section 2-1.40.
Replace Section 2-1.43 with:
2-1.43 Bid Opening The Department opens the bids after the time shown in the Notice to Bidders.
Replace the first paragraph of Section 2-1.47 with:
The Department may grant bid relief under Public Contract Code Sections 5100 et seq. Submit any request for bid relief to DPAC. The Relief of Bid Request form is available at the Department's website.
3 Contract Award and Execution Add the following to Section 3-1.02A:
For a unit price-based bid, submit the bid with a unit price and the item total (the product of the unit price and the quantity) for each item and a total price (the sum of the item totals) in the spaces provided on the Bid Item List. Prices submitted on the Bid Item List are the basis of comparison of bids except:
1. If a discrepancy between the unit price and the item total exists, the unit price prevails except:
1.1. If the unit price is illegible, omitted, or the same as the item total, item total prevails, and the unit price is the quotient of the item total and the quantity.
1.2. If a decimal error is apparent in the product of the unit price and the quantity, the Department will use either the unit price or item total based on the closest by percentage to the unit price or item total in the Department's Final Estimate.
2. If the unit price and the item total are illegible or are omitted, the bid may be determined nonresponsive.
3. Bids on lump sum items are item totals. If a unit price for a lump sum item is entered and it differs from the item total, the item total prevails.
4. Entries are to be expressed in dollars or decimal fractions of a dollar. Symbols such as commas and dollar signs are ignored and have no significance in establishing unit price or item total.
5. Unit prices and item totals are interpreted by the number of digits and decimal placement. Do not round item totals or the total bid.
Replace Section 3-1.04 with:
3-1.04 Contract Award If the Department awards the contract, the award is made to the lowest responsible bidder within 30 days after bid opening.
Replace Section 3-1.09 with:
3-1.09 Contract Bonds Section 3-1.05 does not…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .