H.08.01b 368-A03-02 - Machinery Arrangment.pdf
PDF 472 KB Posted
- Attached to
- 3127 – HURLEY REPOWER GENERATOR PROCUREMENT
- Solicitation number
- W912BU-21-Q-0007
About this file
This document package includes a machinery arrangement drawing package and a federal contract solicitation. The solicitation seeks proposals to repower the electrical power plant aboard the Dredge HURLEY, owned by the U.S. Army Corps of Engineers. The existing powerplant utilizes three aging diesel generator sets. The solicitation requests proposals to supply three new diesel generator sets sized to power the vessel as originally intended with two generators online and one on standby. Additional required equipment includes auxiliary cooling, exhaust equipment, factory acceptance testing, installation and testing support, final acceptance, and training. The contractor will provide all components and services under a single award. Proposals are due by April 15, 2021, with anticipated award by June 1, 2021 and installation to occur at a commercial shipyard under a separate future contract. Equipment warranties must be supported in the Memphis, Tennessee area where the vessel is homeported.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
REV
OFSHEET
DWG. NO.
B
SIZE
SCALE:
PROJECT NO.
of Engineers
US Army Corps
REFERENCES
NO TITLE
APPROVALS
USCG
ABS
A/C - AIR CONDITIONING
AC/OC - AFTER COOLER/OIL COOLER
A - AFT
ABL - ABOVE BASELINE
AMR - AUXILIARY MACHINERY ROOM
AUX - AUXILIARY
BHP - BRAKE HORSEPOWER
BTM - BOTTOM
CIRC - CIRCULATING
CL - CENTERLINE
CLG - COOLING
CONN - CONNECTION
CONT - CONTROLLER
CPP - CONTROLLABLE PITCH PROPELLER
DG - DREDGING GENERATOR
DISCH - DISCHARGE
DIST - DISTILLER
DN - DOWN
DWG - DRAWING
ELEC - ELECTRICAL
ELEX - ELECTRONICS
ENG - ENGINE
EXH - EXHAUST
EXP - EXPANSION
FO - FUEL OIL
FS - FIRE STATION
GMS - GENERATOR MONITORING SYSTEM
GPM - GALLONS PER MINUTE
HP - HORSEPOWER
HT- HIGH TEMPERATURE
IAF - INSTALLING ACTIVITY FURNISHED
INSTL - INSTALLATION
JKT - JACKET
KW - KILOWATT
LB - POUND
LO - LUBE OIL
LT - LOW TEMPERATURE
LVL - LEVEL
M - MODIFIED
MFR - MANUFACTURER
MOD(S) - MODIFICATION(S)
ABS - AMERICAN BUREAU OF SHIPPING
COMB - COMBUSTION
FDN - FOUNDATION
GFE - GOVERNMENT FURNISHED EQUIPMENT
GEN - GENERATOR
MACH - MACHINERY
MMS - MARINE MONITORING SYSTEM
NO - NUMBER
ICMS - INTEGRATED CONTROL & MONITORING SYSTEM
N/R - NOT REQUIRED
DRAWING NO.
ABBREVIATION LEGEND
1. THIS DRAWING WAS CREATED FROM REFERENCE 1. IT HAS BEEN MODIFIED
TO SHOW THE CONCEPT DESIGN FOR THE REPOWERING AND THE
LOCATIONS OF THE NEW DIESEL GENERATORS.
2. THE MACHINERY LIST IS NOT TO BE CONSTRUED AS RESTRICTIVE OR AS
EXCLUDING EQUIPMENT REQUIRED IN SUPPORT OF THE REPOWERING.
3. MACHINERY LIST REFLECTS EQUIPMENT OBSERVED DURING 07/2018 SHIP
CHECK.
4. EQUIPMENT INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM F1166-07
OR ABS GUIDANCE ON ERGONOMICS TO MARINE SYSTEMS.
5. EQUIPMENT INSTALLATION SHALL CONSIDER SERVICE AREA REQUIREMENTS
FOR INSPECTION, MAINTENANCE, AND REPAIRS AS SPECIFIED BY THE OEM.
6. EQUIPMENT INSTALLATION SHALL ALLOW FOR UNOBSTRUCTED PASSAGE
FOR WALKWAYS, LADDERS, AND DOORS AS WELL AS FREE ACCESS TO
HATCHES AND MANHOLE OPENINGS.
CRES - STAINLESS STEEL
CU - CUBIC
DBL - DOUBLE
DGE - DREDGE GENERATOR ENGINE
DP - DREDGE PUMP
DSL - DIESEL
EA - EACH
EMERG - EMERGENCY
EMS - ELECTRONIC MARINE SYSTEMS
F/FWD - FORWARD
FAB - FABRICATED
FLG - FLANGE
FR - FRAME
FT - FEET
FW - FRESH WATER
GFRP - GLASS FIBER REINFORCED PLASTIC
GRP - GROUP
HSWT - HORIZONTAL SLIDING WT
HYD- HYDRAULIC
ID - INSIDE DIAMETER
JW - JACKET WATER
LCG - LONGITUDINAL CENTER OF GRAVITY
LH - LEFT HAND
LKG - LOOKING
MDC - MARINE DESIGN CENTER
ME - MAIN ENGINE
MTR - MOTOR
NOM - NOMINAL
P/S - PORT AND STARBOARD
OD - OUTSIDE DIAMETER
PKG - PACKAGE
PLATF - PLATFORM
PMP - PUMP
PN - PIECE NUMBER
PNL - PANEL
PROP - PROPULSION
PWR - POWER
QTY - QUANTITY
R/RELOC - RELOCATED
R/R - REMOVED AND REINSTALLED
RCVR - RECEIVER
RECIRL - RECIRCULATED
RED - REDUCTION
REF - REFERENCE
REQ - REQUIRED
REV - REVISION
RH - RIGHT HAND
RM - ROOM
RPM - REVOLUTIONS PER MINUTE
R - REMOVAL
SCE - SOURCE
SS - SHIP SERVICE
STBD - STARBOARD
STBY - STANDBY
STD - STANDARD
STWG - STOWAGE
SUCT - SUCTION
SW - SALT WATER
SWBD - SWITCHBOARD
SYS - SYSTEM
SVCE - SERVICE
T - TORQUE
TBD - TO BE DETERMINED
TCG - TRANSVERSE CENTER OF GRAVITY
TDH - TOTAL DYNAMIC HEAD
TK - TANK
TYP - TYPICAL
USCG - UNITED STATES COAST GUARD
USPHS - US PUBLIC HEALTH SERVICE
VCG - VERTICAL CENTER OF GRAVITY
VL - VERTICAL LADDER
VLV - VALVE
W/ - WITH
WT - WATERTIGHT
WT - WEIGHT
WTR - WATER
XFMR - TRANSFORMER
XFR - TRANSFER
STA - STATION
DE - DREDGING ENGINE
VAL - VALUE
CPRSR - COMPRESSOR
DR - DOOR
- INITIAL ISSUE 10/22/18 ACALL
E - EXISTING
HEX - HEAT EXCHANGER
OMS - OIL MIST SEPARATOR
CCS - CENTRAL CONTROL STATION
AHU - AIR HANDLING UNIT
RESERVATIONS
1. ENGINE DATA RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.
2. EXHAUST PIPING RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.
3. HT AND LT HEAT EXCHANGERS AND EXPANSION TANKS PENDING RECEIPT OF
FINAL VENDOR DATA.
4. ENGINE FOUNDATIONS PENDING RECEIPT OF FINAL VENDOR DATA.
5. WEIGHT CONTROL RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.
1 REVISED DRAWING NUMBER 2/13/19 ACALL
REV
OFSHEET
DWG. NO.
B
SIZE
SCALE:
PROJECT NO.
of Engineers
US Army Corps
2 53/8" = 1'-0"
REV
OFSHEET
DWG. NO.
B
SIZE
SCALE:
PROJECT NO.
of Engineers
US Army Corps
3 53/8" = 1'-0"
REV
OFSHEET
DWG. NO.
B
SIZE
SCALE:
PROJECT NO.
of Engineers
US Army Corps
4 5 3/8" = 1'-0"
REV
OFSHEET
DWG. NO.
B
SIZE
SCALE:
PROJECT NO.
of Engineers
US Army Corps
5 5 3/8" = 1'-0"
| Sheets and Views |
| Machinery Arrangement Concept Design 2013-Sheet 1 A |
| Machinery Arrangement Concept Design 2013-Sheet 2A |
| Machinery Arrangement Concept Design 2013-Sheet 3 |
| Machinery Arrangement Concept Design 2013-Sheet 4 |
| Machinery Arrangement Concept Design 2013-Sheet 5 |
File details come from the government source that posted it. Updated .