H.08.01b 368-A03-02 - Machinery Arrangment.pdf

PDF 472 KB Posted

Attached to
3127 – HURLEY REPOWER GENERATOR PROCUREMENT
Solicitation number
W912BU-21-Q-0007
Issued by

About this file

This document package includes a machinery arrangement drawing package and a federal contract solicitation. The solicitation seeks proposals to repower the electrical power plant aboard the Dredge HURLEY, owned by the U.S. Army Corps of Engineers. The existing powerplant utilizes three aging diesel generator sets. The solicitation requests proposals to supply three new diesel generator sets sized to power the vessel as originally intended with two generators online and one on standby. Additional required equipment includes auxiliary cooling, exhaust equipment, factory acceptance testing, installation and testing support, final acceptance, and training. The contractor will provide all components and services under a single award. Proposals are due by April 15, 2021, with anticipated award by June 1, 2021 and installation to occur at a commercial shipyard under a separate future contract. Equipment warranties must be supported in the Memphis, Tennessee area where the vessel is homeported.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

REV

OFSHEET

DWG. NO.

B

SIZE

SCALE:

PROJECT NO.

of Engineers

US Army Corps

REFERENCES

NO TITLE

APPROVALS

USCG

ABS

A/C - AIR CONDITIONING

AC/OC - AFTER COOLER/OIL COOLER

A - AFT

ABL - ABOVE BASELINE

AMR - AUXILIARY MACHINERY ROOM

AUX - AUXILIARY

BHP - BRAKE HORSEPOWER

BTM - BOTTOM

CIRC - CIRCULATING

CL - CENTERLINE

CLG - COOLING

CONN - CONNECTION

CONT - CONTROLLER

CPP - CONTROLLABLE PITCH PROPELLER

DG - DREDGING GENERATOR

DISCH - DISCHARGE

DIST - DISTILLER

DN - DOWN

DWG - DRAWING

ELEC - ELECTRICAL

ELEX - ELECTRONICS

ENG - ENGINE

EXH - EXHAUST

EXP - EXPANSION

FO - FUEL OIL

FS - FIRE STATION

GMS - GENERATOR MONITORING SYSTEM

GPM - GALLONS PER MINUTE

HP - HORSEPOWER

HT- HIGH TEMPERATURE

IAF - INSTALLING ACTIVITY FURNISHED

INSTL - INSTALLATION

JKT - JACKET

KW - KILOWATT

LB - POUND

LO - LUBE OIL

LT - LOW TEMPERATURE

LVL - LEVEL

M - MODIFIED

MFR - MANUFACTURER

MOD(S) - MODIFICATION(S)

ABS - AMERICAN BUREAU OF SHIPPING

COMB - COMBUSTION

FDN - FOUNDATION

GFE - GOVERNMENT FURNISHED EQUIPMENT

GEN - GENERATOR

MACH - MACHINERY

MMS - MARINE MONITORING SYSTEM

NO - NUMBER

ICMS - INTEGRATED CONTROL & MONITORING SYSTEM

N/R - NOT REQUIRED

DRAWING NO.

ABBREVIATION LEGEND

1. THIS DRAWING WAS CREATED FROM REFERENCE 1. IT HAS BEEN MODIFIED

TO SHOW THE CONCEPT DESIGN FOR THE REPOWERING AND THE

LOCATIONS OF THE NEW DIESEL GENERATORS.

2. THE MACHINERY LIST IS NOT TO BE CONSTRUED AS RESTRICTIVE OR AS

EXCLUDING EQUIPMENT REQUIRED IN SUPPORT OF THE REPOWERING.

3. MACHINERY LIST REFLECTS EQUIPMENT OBSERVED DURING 07/2018 SHIP

CHECK.

4. EQUIPMENT INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM F1166-07

OR ABS GUIDANCE ON ERGONOMICS TO MARINE SYSTEMS.

5. EQUIPMENT INSTALLATION SHALL CONSIDER SERVICE AREA REQUIREMENTS

FOR INSPECTION, MAINTENANCE, AND REPAIRS AS SPECIFIED BY THE OEM.

6. EQUIPMENT INSTALLATION SHALL ALLOW FOR UNOBSTRUCTED PASSAGE

FOR WALKWAYS, LADDERS, AND DOORS AS WELL AS FREE ACCESS TO

HATCHES AND MANHOLE OPENINGS.

CRES - STAINLESS STEEL

CU - CUBIC

DBL - DOUBLE

DGE - DREDGE GENERATOR ENGINE

DP - DREDGE PUMP

DSL - DIESEL

EA - EACH

EMERG - EMERGENCY

EMS - ELECTRONIC MARINE SYSTEMS

F/FWD - FORWARD

FAB - FABRICATED

FLG - FLANGE

FR - FRAME

FT - FEET

FW - FRESH WATER

GFRP - GLASS FIBER REINFORCED PLASTIC

GRP - GROUP

HSWT - HORIZONTAL SLIDING WT

HYD- HYDRAULIC

ID - INSIDE DIAMETER

JW - JACKET WATER

LCG - LONGITUDINAL CENTER OF GRAVITY

LH - LEFT HAND

LKG - LOOKING

MDC - MARINE DESIGN CENTER

ME - MAIN ENGINE

MTR - MOTOR

NOM - NOMINAL

P/S - PORT AND STARBOARD

OD - OUTSIDE DIAMETER

PKG - PACKAGE

PLATF - PLATFORM

PMP - PUMP

PN - PIECE NUMBER

PNL - PANEL

PROP - PROPULSION

PWR - POWER

QTY - QUANTITY

R/RELOC - RELOCATED

R/R - REMOVED AND REINSTALLED

RCVR - RECEIVER

RECIRL - RECIRCULATED

RED - REDUCTION

REF - REFERENCE

REQ - REQUIRED

REV - REVISION

RH - RIGHT HAND

RM - ROOM

RPM - REVOLUTIONS PER MINUTE

R - REMOVAL

SCE - SOURCE

SS - SHIP SERVICE

STBD - STARBOARD

STBY - STANDBY

STD - STANDARD

STWG - STOWAGE

SUCT - SUCTION

SW - SALT WATER

SWBD - SWITCHBOARD

SYS - SYSTEM

SVCE - SERVICE

T - TORQUE

TBD - TO BE DETERMINED

TCG - TRANSVERSE CENTER OF GRAVITY

TDH - TOTAL DYNAMIC HEAD

TK - TANK

TYP - TYPICAL

USCG - UNITED STATES COAST GUARD

USPHS - US PUBLIC HEALTH SERVICE

VCG - VERTICAL CENTER OF GRAVITY

VL - VERTICAL LADDER

VLV - VALVE

W/ - WITH

WT - WATERTIGHT

WT - WEIGHT

WTR - WATER

XFMR - TRANSFORMER

XFR - TRANSFER

STA - STATION

DE - DREDGING ENGINE

VAL - VALUE

CPRSR - COMPRESSOR

DR - DOOR

- INITIAL ISSUE 10/22/18 ACALL

E - EXISTING

HEX - HEAT EXCHANGER

OMS - OIL MIST SEPARATOR

CCS - CENTRAL CONTROL STATION

AHU - AIR HANDLING UNIT

RESERVATIONS

1. ENGINE DATA RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.

2. EXHAUST PIPING RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.

3. HT AND LT HEAT EXCHANGERS AND EXPANSION TANKS PENDING RECEIPT OF

FINAL VENDOR DATA.

4. ENGINE FOUNDATIONS PENDING RECEIPT OF FINAL VENDOR DATA.

5. WEIGHT CONTROL RESERVED PENDING RECEIPT OF FINAL VENDOR DATA.

1 REVISED DRAWING NUMBER 2/13/19 ACALL

REV

OFSHEET

DWG. NO.

B

SIZE

SCALE:

PROJECT NO.

of Engineers

US Army Corps

2 53/8" = 1'-0"

REV

OFSHEET

DWG. NO.

B

SIZE

SCALE:

PROJECT NO.

of Engineers

US Army Corps

3 53/8" = 1'-0"

REV

OFSHEET

DWG. NO.

B

SIZE

SCALE:

PROJECT NO.

of Engineers

US Army Corps

4 5 3/8" = 1'-0"

REV

OFSHEET

DWG. NO.

B

SIZE

SCALE:

PROJECT NO.

of Engineers

US Army Corps

5 5 3/8" = 1'-0"

Sheets and Views
Machinery Arrangement Concept Design 2013-Sheet 1 A
Machinery Arrangement Concept Design 2013-Sheet 2A
Machinery Arrangement Concept Design 2013-Sheet 3
Machinery Arrangement Concept Design 2013-Sheet 4
Machinery Arrangement Concept Design 2013-Sheet 5

File details come from the government source that posted it. Updated .