GSE Bid Drawings _ Part 1A.pdf
PDF 15 MB Posted
- Solicitation number
- 36C78621B0005
About this file
This pre-solicitation notice provides details for a future solicitation seeking a firm fixed price construction contract to expand gravesite capacity at the Dayton National Cemetery in Dayton, Ohio. The project scope includes construction of new columbarium walls with 2,080 niches and an in-ground cremains section with 2,512 plots. The notice specifies a 100% set-aside for verified Service-Disabled Veteran Owned Small Businesses. Interested contractors must be registered in the System for Award Management and verified in the Vendor Information Pages database by the proposal receipt date. The anticipated period of performance is 300 days from notice to proceed. The project value is estimated between $1-5 million. The solicitation will be issued in May 2021 via beta.SAM.gov and require attendance at a pre-bid conference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB Contractor Cost Estimate Worksheet.xlsx | XLSX spreadsheet | |
| GSE Bid Drawings _ Part 2A.pdf | ||
| 36C78621B0005_1.docx | DOCX document | |
| GSE Bid Drawings _ Part 1B.pdf | ||
| Specs BD 20210311.pdf | ||
| GSE Bid Drawings _ Part 3B.pdf | ||
| GSE Bid Drawings _ Part 3A.pdf | ||
| GSE Bid Drawings _ Part 2B.pdf | ||
| DOL Davis Bacon Wage Determination Montgomery County Ohio.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1
_g i_ co ve r.d w g ed it:
eh ed m an s av ed
:3 /1
0/
:3
P M p lo t:3 /1
0/
:3
P M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
BID DOCUMENTS
Approved: Project Director
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
VA PROJECT NO. 810CM3029
CONSULTANTS
ANDERSON ENGINEERING OF MN, LLC
PROJECT MANAGEMENT, ARCHITECTURE, LANDSCAPE
ARCHITECTURE, PLANNING, ENVIRONMENTAL, CIVIL
ENGINEERING
13605 1ST AVENUE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: CURT CLAEYS, PROJECT MANAGER
PHONE: (763) 412-4000
IMEG
STRUCTURAL ENGINEERING
2882 106TH STREET
DES MOINES, IA 50322
CONTACT: TODD BARRETT
PHONE: (515) 334-9960
EC DESIGN
IRRIGATION
400 5TH STREET,
WEST DES MOINES, IA 50265
CONTACT: ERIK CHRISTIANSEN
PHONE: (515) 225-6365
CPMI
COST ESTIMATOR
1001 GRAND AVE., SUITE 201
WEST DES MOINES, IA 50265
CONTACT: BRYAN BERTRAND
PHONE: (515) 244-1166
TERRACON
GEOTECHNICAL ENGINEER
611 LUNKEN PARK DR.,
CINCINNATI, OH 45226
CONTACT: JEFFREY DUNLAP
PHONE: (513) 321-5816
VICINITY MAP LOCATION MAPN.T.S. N.T.S.
N
GI001
JREH
COVER
N
GRAVESITE SUMMARY SHEET INDEX
EXPANSION QTY.
COLUMBARIUM NICHES
IN-GROUND CREMAINS
DISTURBED ACRES 1.94
W THIRD ST
LIS
C
U M
D R
S G
E
TTY
S B
U R
G A
V E
DAYTON NATIONAL CEMETERY
PROJECT LOCATION
Sheet Sheet Title
GI001 COVER 1
GC101 OVERALL SITE PLAN AND OPERATIONS 2
GC102 IGC SITE PLAN AND OPERATIONS 3
GC103 COLUMBARIUM SITE PLAN AND OPERATIONS 4
GC701 SWPPP 1 5
GC702 SWPPP 2 6
VF101 EXISTING CONDITIONS PLAN OVERALL 7
VF102 EXISTING CONDITIONS ENLARGEMENT 1 8
VF103 EXISTING CONDITIONS ENLARGEMENT 2 9
BL101 BORING LOCATIONS 10
CD101 IGC DEMOLITION PLAN 11
CD102 COLUMBARIUM DEMOLITION PLAN 12
CS101 SECTION 46 IGC LAYOUT & NUMBERING PLAN 13
CS102 SECTION 46 IGC GRADING & UTILITY PLAN 14
CS501 SITE DETAILS 1 15
CS502 SITE DETAILS 2 16
CS503 SITE DETAILS 3 17
CS504 SITE DETAILS 4 18
CS505 SITE DETAILS 5 19
CC101 COLUMBARIUM LAYOUT PLAN 20
CC102 COLUMBARIUM FOUNDATION PLAN 21
CC103 COLUMBARIUM PAVING PLAN 22
CC104 COLUMBARIUM NUMBERING PLAN 23
CC105 COLUMBARIUM GRADING PLAN 24
CC106 COLUMBARIUM UTILITY PLAN 25
CC107 COLUMBARIUM UTILITY ENLARGEMENT 26
CC501 COLUMBARIUM ELEVATIONS 1 27
CC502 COLUMBARIUM ELEVATIONS 2 28
CC503 COLUMBARIUM ELEVATIONS 3 29
CC504 COLUMBARIUM ELEVATIONS 4 30
CC505 COLUMBARIUM ELEVATIONS 5 31
CC506 COLUMBARIUM ELEVATIONS 6 32
CC507 COLUMBARIUM DETAILS 1 33
CC508 COLUMBARIUM DETAILS 2 34
CC509 RETAINING WALL DETAILS 1 35
CC510 RETAINING WALL DETAILS 2 36
LP101 SECTION 46 IGC PLANTING PLAN 37
LP102 COLUMBARIUM PLANTING PLAN 38
LP501 PLANTING DETAILS 39
IR101 SITE IRRIGATION PLAN 40
IR102 SITE IRRIGATION PLAN 41
IR103 IRRIGATION COVERAGE PLAN 42
IR104 IRRIGATION COVERAGE PLAN 43
IR501 IRRIGATION DETAILS 44
SS000 GENERAL NOTES 45
SS100 COLUMBARIUM FOUNDATION PLAN & DETAILS 46
PROJECT
AREAS
SITE DATA
ADDRESS: 44 WEST THIRD STREET, DAYTON OHIO 45428
COUNTY: MONTGOMERY
GARAGE
B
A
C
891011
12131415
16171819
20212223
24252627
28293031
32333435
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 s ite p la n ov er al l.d w jri ch ne r s av ed :3
/9 /2
:5
AM
lo t:3 /9
/2
6:
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
OVERALL SITE PLAN AND
OPERATIONS
ADMINISTRATION/
MAINTENANCE
BUILDING
MAIN ENTRANCE
COMMITTAL SHELTER A
COMMITTAL SHELTER B
IGC
WISCONSIN AVE
BROW
N A
VE
IN
D
IAN
A AVECOLORADO AVE
TEXAS AVE
DAKOTA AVE
KA
N
SA
S
AV
E
S G
ET
TY
SB
U
R G
A
VE
W THIRD ST
NEW MEXICO PL
PENNSYLVANIA AVE
OHIO AVE W
ISC
O N
SIN
AVE
W THIRD ST
GC101
SEE
CC-100's
SEE
CS-100's
LEGEND
ANNOTATION LEGEND
IN-GROUND CREMAINS
COLUMBARIA
IGC
COL
NEW BURIAL SECTION HEADSTONE DIRECTION
TEMPORARY ACCESS ROUTE
CONTRACTOR STAGING AREA
RELOCATED TREE FROM SECTION 46
N 0 150' 300'
SCALE:1
OVERALL SITE PLAN AND OPERATIONS
1" = 150' (30" x 42" PAPER SIZE)
MCMAHON AVE
TEMPORARY
CONTRACTOR ACCESS
OFF THIRD STREET
ALTERNATE
STAGING AREA
IGC STAGING
AREA
COLUMBARIUM
STAGING AREA
GENERAL NOTES:
1. CONTRACTOR SHALL COMMENCE CONSTRUCTION AT SECTION 46
(IGC) WITHIN 60 DAYS OF NOTICE TO PROCEED.
2. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF
THE GEOTECHNICAL REPORT DATED OCTOBER 5, 2020 BY TERRACON
(PROJECT NO. N1205096 UNLESS DIRECTED OTHERWISE.
3. CONTRACTOR SHALL OBTAIN CONSTRUCTION ACCESS PERMIT FROM
CITY FOR TEMPORARY SITE ENTRANCE OFF OF THIRD STREET. ALL
DISTURBED PAVEMENT AND GROUND TO BE REPLACED IN-KIND. SEE
DEMO PLAN FOR REMOVAL, PROTECTION, AND REPLACEMENT
INSTRUCTIONS.
4. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE PERMITS..
VERIFY RECEIPT OF ALL REQUIRED PERMITS PRIOR TO
CONSTRUCTION.
5. EXISTING TOPOGRAPHIC AND UTILITY INFORMATION PROVIDED BY
A/E ON A SURVEY PREPARED BY RANDALL MILLER & ASSOCIATES, INC.
NO POTHOLING OCCURRED. BE ADVISED THAT THE LOCATION AND
TYPE OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR
GENERAL INFORMATION ONLY. THE INFORMATION IS NOT
WARRANTED TO BE ACCURATE OR COMPLETE. THE CONTRACTOR, IN
COOPERATION WITH THE APPROPRIATE UTILITY COMPANY OR
MUNICIPALITY, IS RESPONSIBLE FOR VERIFYING THE LOCATION, SIZE,
AND DEPTH OF ALL UNDERGROUND UTILITIES.
6. ALL HANDICAPPED STALLS AND ACCESS RAMPS SHALL COMPLY WITH
CURRENT ADA STANDARDS.
7. LOCATE AND PROTECT EXISTING UTILITIES UNLESS OTHERWISE
NOTED.
8. SUBSTITUTIONS FROM INFO. SHOWN HERON SHALL BE REVIEWED
AND APPROVED BY THE ENGINEER OF RECORD.
9. CONTRACTOR SHALL VERIFY LOCATIONS OF RELOCATED TREES
FROM IGC SECTION 46 WITH COR PRIOR TO RE-PLANTING.
NEW DIRECTOR SIGN
LOCATION TO BE
COORDINATED WITH
CEMETERY DIRECTOR & COR
NEW COLUMBARIUM A SIGN
NEW COLUMBARIUM B SIGN
NEW COLUMBARIUM B
EXISTING COLUMBARIUM A
RELOCATED
TREES
RELOCATED
TREE
CONSTRUCTION SIGN LOCATION
COORDINATE WITH CEMETERY & COR.
B
A
C
891011
12131415
16171819
20212223
24252627
28293031
32333435
B
C
89100111
1133144155
16177188199
20211222233
24255266277
28299300311
32333344355
A
GARAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 o pe ra tio ns .d w jri ch ne r s av ed
:3 /9
/2
:1 lo t:3
/9 /2
6:
P M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
IGC SITE PLAN AND OPERATIONS
GC102
LEGEND
SILT FENCE
CONSTRUCTION FENCE WITH SCREEN
TEMPORARY ACCESS ROUTE
CONTRACTOR STAGING AREA
ROCK ENTRANCE
GRADING LIMITS
N 0 20' 40'
SCALE:1
IGC SITE PLAN AND OPERATIONS
1" = 20' (30" x 42" PAPER SIZE)
IGC STAGING AREA
SILT FENCE
NEW
SECTION 46
IN-GROUND
CREMAINS
ENTRANCE TO STAGING AREA
ENTRANCE
GATE
TEMPORARY CONSTRUCTION
FENCE WITH SCREEN
GRADING LIMITS
ALTERNATE
STAGING AREA
GENERAL NOTES:
1. CONTRACTOR SHALL COMMENCE
CONSTRUCTION AT SECTION 46 (IGC)
WITHIN 60 DAYS OF NOTICE TO
PROCEED.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 o pe ra tio ns .d w jri ch ne r s av ed
:3 /9
/2
:1 lo t:3
/9 /2
6:
P M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
COLUMBARIUM SITE PLAN AND
OPERATIONS
GC103
LEGEND
SILT FENCE
TEMPORARY ACCESS ROUTE
CONSTRUCTION FENCE WITH SCREEN
CONTRACTOR STAGING AREA
ROCK ENTRANCE
TREE PROTECTION (SEE 7/LP501)
N 0 20' 40'
SCALE:1
COLUMBARIUM SITE PLAN AND OPERATIONS
1" = 30' (30" x 42" PAPER SIZE)
NEW
COLUMBARIUM
COURT
TEMPORARY CONSTRUCTION
FENCE WITH SCREEN
SILT
FENCE
TEMPORARY GATE
WITH LOCK
TEMPORARY GATE
COLUMBARIUM
STAGING AREA
SHEET NOTES
1. CONTRACTOR TO OBTAIN CONSTRUCTION ACCESS PERMIT FROM
CITY TO ACCESS CEMETERY OFF OF THIRD STREET. CALL LISA
@ 937-333-3840 TO REQUEST PERMIT. PERMIT DURATION IS FOR
3 MONTHS AND NEEDS TO BE COMPLETED AND PAID FOR PRIOR
TO BEGINNING CONSTRUCTION. REPLACE IN-KIND ANY
DISTURBED PAVEMENT, CURB, AND LAND. REMOVE, PROTECT,
AND REPLACE DECORATIVE METAL FENCE ONCE ACCESS TO
CEMETERY IS NO LONGER NEEDED.
2. ROAD PAVING AND REGRADING OF MCMAHON AVE. SHALL BE
COMPLETED WITHIN 7 CALENDAR DAYS OF THE START OF WORK.
CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION
FENCE STANDS BETWEEN PAVEMENT REPLACEMENT WORK AND
CEMETERY ROAD. SUBMIT SCHEDULE TO COR FOR APPROVAL.
3. PROTECT ALL TREES WITHIN COLUMBARIUM STAGING AREA.
COLUMBARIUM A SIGN
COLUMBARIUM B SIGN
4 46
DAYTON NC - GRAVESITE EXPANSION
DAYTON NATIONAL CEMETERY IS LOCATED IN THE CITY OF DAYTON IN MONTGOMERY
COUNTY BOUNDED ON THE NORTH BY W THIRD ST. AND ON THE SOUTH BY MICHIGAN AVE,
EXTENDING FROM LISCUM DR TO S GETTYSBURG AVE. THE PROPOSED SITES ARE
LOCATED IN THE LOWER GREAT MIAMI WATERSHED, AND ENCOMPASSES A COMBINED 1.94
ACRES.
THE PLANNED SCOPE OF THE PROJECT INCLUDES:
THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS
GRADING OF THE SITE FOR THE CONSTRUCTION OF COLUMBARIA & IGC SECTIONS,
ROADS, AND PARKING LOTS.
GRADING AS REQUIRED FOR THE INSTALLATION OF THE STRUCTURES, ROADS, AND
PARKING LOTS.
INSTALLATION OF STORM SEWER.
PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB, GUTTER, AND
SIDEWALKS THROUGHOUT THE SITE.
CONSTRUCTION OF COLUMBARIA & IGC SECTIONS, ROADS, AND PARKING LOTS.
RECEIVING WATERS
WITHIN A 1 MILE RADIUS OF THE PROJECT SITE, MULTIPLE UNNAMED WATER BODIES
SOUTH OF THE SITE ARE PRESENT. HOWEVER, RUNOFF FROM THE PROJECT AREA WILL
BE PRIMARILY BE CAPTURED BY STORM SEWER UTILITIES.
SOIL TYPES
GEOTECHNICAL REPORT BY TERRACON DATED 11/5/2020 IS TO BE KEPT ON SITE AS PART
OF THE SWPPP AND IS TO BE MADE AVAILABLE UPON REQUEST. SEE SHEETS BL101 FOR
BORING INFORMATION.
PRIOR LAND USE
DEVELOPMENT AREA WAS PRIMARILY USED AS GREEN SPACE FOR DAYTON NATIONAL
CEMETERY.
LONG TERM MAINTENANCE AND OPERATION
DAYTON NATIONAL CEMETERY HAS ENTERED INTO A MAINTENANCE AGREEMENT WITH THE
CITY OF DAYTON THAT IDENTIFIES THE AGENCY THAT IS RESPONSIBLE FOR ONGOING
MAINTENANCE, AND HOW RESPONSIBILITY WILL BE TRANSFERRED TO OTHER AGENTS.
PROJECT PERSONNEL AND TRAINING
THIS SWPPP WAS PREPARED BY PERSONNEL THAT ARE VERIFIED IN THE DESIGN OF
CONSTRUCTION SWPPP. COPIES OF THE CERTIFICATIONS ARE ON FILE WITH THE
ENGINEER.
PROVIDE A CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO IS
KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND
SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. THE EROSION CONTROL
SUPERVISOR WILL WORK WITH THE PROJECT ENGINEER / SWPPP DESIGNER TO OVERSEE
THE IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION, AND
MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS BEFORE,
DURING, AND AFTER CONSTRUCTION UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN
FILED WITH THE OHIO EPA. PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION
MEETING. WORK WILL NOT BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION
HAS BEEN PROVIDED TO THE PROJECT ENGINEER.
PROVIDE AT LEAST ONE CERTIFIED INSTALLER FOR EACH CONTRACTOR OR
SUBCONTRACTOR THAT INSTALLS EROSION/SEDIMENT CONTROL PRODUCTS INCLUDING
SODDING, SILT FENCE, ROLLED EROSION CONTROL PRODUCTS, AND DITCH CHECKS.
PROVIDE PROOF OF CERTIFICATION AT THE RECONSTRUCTION MEETING. WORK WILL NOT
BE ALLOWED TO COMMENCE UNTIL PROOF OF CERTIFICATION HAS BEEN PROVIDED TO
THE PROJECT ENGINEER.
CHAIN OF RESPONSIBILITY
THE OWNER AND CONTRACTOR ARE CO-PERMITTEES FOR THE NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION PERMIT. THE CONTRACTOR IS
RESPONSIBLE TO COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION PERMIT AT
ALL TIMES UNTIL THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED. THE CONTRACTOR
WILL DEVELOP A CHAIN OF COMMAND WITH ALL OPERATORS ON THE SITE TO ENSURE
THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE CONSTRUCTION
PROJECT IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, AND A
NOTICE OF TERMINATION (NOT) HAS BEEN SUBMITTED.
PROJECT CONTACTS
THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND
INSTALLATION, INSPECTION, AND MAINTENANCE OF THE EROSION PREVENTION AND
SEDIMENT CONTROL BMPS BEFORE, DURING, AND AFTER CONSTRUCTION UNTIL THE
NOTICE OF TERMINATION (NOT) HAS BEEN FILED.
*CERTIFIED FOR DESIGN OF CONSTRUCTION SWPPP BY UNIVERSITY OF MINNESOTA,
EXPIRES 5/31/22
SITE INSPECTION AND MAINTENANCE
CONTRACTOR SHALL PROVIDE NAME, CONTACT INFO, AND TRAINING DOCUMENTATION
FOR THE PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION AND
INSPECTION/MAINTENANCE OF BMPS. ONLY QUALIFIED INSPECTION PERSONNEL SHALL
PERFORM INSPECTIONS.
INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS
DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT
GREATER THAN 0.5 INCHES WITHIN A 24 HOUR TIME FRAME. INSPECTION FREQUENCY MAY
BE REDUCED TO MONTHLY FOR DORMANT SITES IF THE ENTIRE SITE IS TEMPORARILY
STABILIZED OR RUNOFF IS UNLIKELY DUE TO WEATHER CONDITIONS FOR EXTENDED
PERIODS OF TIME. INSPECT ALL TEMPORARY AND PERMANENT WATER QUALITY
MANAGEMENT, EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL THE SITE HAS
UNDERGONE FINAL STABILIZATION AND THE N.O.T. HAS BEEN SUBMITTED. INSPECT
SURFACE WATER INCLUDING DRAINAGE DITCHES FOR SIGNS OF EROSION AND SEDIMENT
DEPOSITION. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF
TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE
OF OFF SITE SEDIMENT ACCUMULATION.
RECORD AND SIGN ALL INSPECTIONS AND MAINTENANCE ACTIVITIES IN WRITING WITHIN 24
HOURS. SUBMIT INSPECTION REPORTS IN A FORMAT THAT IS ACCEPTABLE TO THE
PROJECT ENGINEER. INSPECTION RECORDS SHALL BE KEPT FOR 3 YEARS AFTER
TERMINATION OF CONSTRUCTION ACTIVITIES.
FOR PROJECTS THAT DISCHARGE TO PROHIBITED WATERS, CONDUCT ROUTINE SITE
INSPECTIONS AT A MINIMUM OF ONCE EVERY 72 HOURS (3 DAYS).
INCLUDE THE FOLLOWING IN THE RECORDS OF EACH INSPECTION AND MAINTENANCE
ACTIVITY:
A. DATE AND TIME OF INSPECTIONS
B. NAMES & QUALIFICATIONS OF PERSONS CONDUCTING INSPECTIONS
C. FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE
ACTIONS
D. CORRECTIVE ACTION TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING
MAINTENANCE ACTIVITIES
E. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS
F. DOCUMENTS AND CHANGES MADE TO THE SWPPP
REPLACE, REPAIR OR SUPPLEMENT ALL NONFUNCTIONAL BMPS BY IN THE TIME PROVIDED
BELOW:
A. REPAIR, REPLACE, OR SUPPLEMENT PERIMETER CONTROL DEVICES WHEN IT
BECOMES NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT OF THE DEVICE.
COMPLETE REPAIRS BY
B. THE END OF THE NEXT BUSINESS DAY FOLLOWING DISCOVERY.
C. REPAIR OR REPLACE INLET PROTECTION DEVICES WHEN THEY BECOME
NONFUNCTIONAL OR SEDIMENT REACHES 12 THE HEIGHT AND/OR DEPTH OF THE
DEVICE. COMPLETE REPAIRS BY THE END OF THE NEXT BUSINESS DAY FOLLOWING
DISCOVER.
D. DRAIN AND REMOVE SEDIMENT FROM TEMPORARY AND PERMANENT SEDIMENT
BASINS ONCE THE SEDIMENT HAS REACHED 12 THE STORAGE VOLUME. COMPLETE
WORK WITHIN 72 HOURS OF DISCOVERY.
E. REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATER INCLUDING
DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. RESTABILIZED
ANY AREAS THAT ARE DISTURBED BY SEDIMENT REMOVAL OPERATION. SEDIMENT
REMOVAL AND STABILIZATION MUST BE COMPLETED WITHIN 7 DAYS OF DISCOVERY.
PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR WORKING IN SURFACE
WATERS.
F. REMOVE TRACKED SEDIMENT FROM PAVED SURFACES BOTH ON AND OFF SITE
WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MAY HAVE TO OCCUR MORE
OFTEN TO MINIMIZE OFF SITE IMPACTS. LIGHTLY WET THE PAVEMENT PRIOR TO
SWEEPING
G. MAINTAIN ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS GONE UNDER
FINAL STABILIZATION, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN
SUBMITTED TO THE MPCA.
AREA SUMMARY
SPECIAL SITE NOTES
IF SITE REQUIRES PERMANENT STORMWATER MANAGEMENT HYDROLOGIC AND WATER
QUALITY MODELING DATA IS AVAILABLE UPON REQUEST.
THE SWPPP COORDINATOR MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72
HOURS UPON REQUEST AND SHALL BE RESPONSIBLE FOR THE FOLLOWING:
SUBMIT THE NPDES PERMIT APPLICATION AND COMPLY WITH ALL REQUIREMENTS
IMPLEMENT THE SWPPP.
OVERSEE INSTALLATION AND MAINTENANCE PRACTICES AND REPAIRS IDENTIFIED
IN THE SWPPP.
IMPLEMENT AND OVERSEE EMPLOYEE TRAINING AND RECORD IN OR WITH THE
SWPPP.
CONDUCT OR PROVIDE FOR INSPECTION AND MONITORING ACTIVITIES AND
MAINTAIN LOGS AS PERMIT REQUIRES.
IDENTIFY OTHER POTENTIAL POLLUTANT SOURCES NOT LISTED IN THE SWPPP AND
ADD THEM.
IDENTIFY ANY DEFICIENCIES IN THE SWPPP AND CORRECT THEM.
ENSURE THAT CHANGES TO CONSTRUCTION PLANS ARE ADDRESSED IN THE
SWPPP.
FILE THE NOTICE OF TERMINATION UPON PROJECT COMPLETION.
AFTER THE NOTICE OF TERMINATION HAS BEEN FILED, THE OWNER SHALL BE
RESPONSIBLE FOR ASSIGNING RESPONSIBILITY FOR PERMANENT MAINTENANCE
MEASURES.
PERMITS
THE FOLLOWING PERMITS APPLY TO THIS PROJECT:
LOCATION OF SWPPP REQUIREMENTS
THE REQUIRED SWPPP ELEMENTS MAY BE LOCATED IN MANY PLACES
WITHIN THE PLAN SET.
SWPPP AMENDMENTS
A QUALIFIED INDIVIDUAL MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING
THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW
THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS.
PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS
NECESSARY TO CORRECT PROBLEMS IDENTIFIED OF ADDRESS SITUATIONS WHENEVER
THERE IS A CHANGE IN DESIGN, CONSTRUCTION OPERATION, MAINTENANCE, WEATHER,
OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF
POLLUTANTS TO SURFACE WATERS OR GROUNDWATER.
PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS
NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER
INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA
OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY
MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER
OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCE OR THE
SWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL.
STABILIZATION TIME FRAMES
ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO
THE PLANS AND SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE
BELOW. FINAL STABILIZATION WILL OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE
COVER WITH A DENSITY OF 70% OVER THE ENTIRE DISTURBED AREA COMPARED TO
EXISTING CONDITIONS. ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND
SEDIMENT CONTROL BMPS MUST BE REMOVED AS PART OF THE SITE FINAL STABILIZATION.
ALL SEDIMENT MUST BE CLEANED OUT OF CONVEYANCES AND TEMPORARY
SEDIMENTATION BASINS IF APPLICABLE.
1. INITIATE INLET STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS
TEMPORARILY OR PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE
STABILIZATION WITHIN THE TIME FRAME LISTED. IN MANY INSTANCES THIS WILL
REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING THE COURSE OF THE
PROJECT. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT CLAY OR SILT AND
STOCKPILED AND CONSTRUCTED ROAD BASE ARE NOT APPROPRIATE AND
THEREFORE EXEMPT FROM THE STABILIZATION REQUIREMENT.
2. APPLICATION OF MULCH, HYDROMULCH, TACKIFIER AND POLYACRYLAMIDE ARE NOT
ACCEPTABLE STABILIZATION METHODS IN THESE AREAS.
3. STABILIZE ALL AREAS OF THE SITE PRIOR TO THE ONSET OF WINTER, ANY WORK STILL
BEING PERFORMED WILL BE SNOW MULCHED, SEEDED, AND BLANKETED WITHIN THE
TIME FRAMES IN THE NPDES PERMIT.
4. TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER
CONTROL BMPS. USE RAPID STABILIZATION METHODS APPROVED BY THE ENGINEER.
5. KEEP DITCHES AND EXPOSED SOILS IN AN EVEN ROUGH GRADED CONDITION IN
ORDER TO BE ABLE TO APPLY EROSION CONTROL MULCHES, HYDROMULCHES AND
BLANKETS.
6. FOR DISTURBED AREAS WITHIN 50 FEET OF A STREAM REMAINING DORMANT FOR
OVER 14 DAYS, APPLY TEMPORARY EROSION CONTROLS WITHIN 2 DAYS.
7. FOR DISTURBED AREAS OVER 50 FEET AWAY FROM A STREAM REMAINING DORMANT
FOR OVER 14 DAYS, APPLY TEMPORARY EROSION CONTROLS WITHIN 7 DAYS.
PROJECT
SITE
1-MILE
RADIUS
AROUND
PROJECT
UNNAMED
WATER FEATURE UNNAMED
WATER FEATURE
CONTACT INFORMATION
ORGANIZATION CONTACT NAME PHONE
DAYTON NATIONAL CEMETERY DOUGLAS LEDBETTER 937-268-2221
ANDERSON ENGINEERING (SWPPP DESIGN) JARED RICHNER* 763-412-4000
[CONTRACTOR] [CONTRACTOR NAME] [#]
ACREAGE SUMMARY
AREA ACRES
COMBINED PROJECT AREA 4.11
DISTURBED 1.95
IMP. PRE-CONSTRUCTION 0.01
IMP. POST-CONSTRUCTION 0.18
NEW IMP. 0.17
PERVIOUS AT COMPLETION 2.35
AGENCY TYPE OF PERMIT PERMIT # AND DATES
OHIO EPA NPDES CONSTRUCTION
PERMIT CONTRACTOR TO ACQUIRE
CITY OF DAYTON GRADING PERMIT CONTRACTOR TO ACQUIRE
CITY OF DAYTON CONSTRUCTION ACCESS
PERMIT CONTRACTOR TO ACQUIRE
AREA TIME FRAME NOTES
LAST 200 LINEAL FEET OF DRAINAGE
DITCH OR SWALE
WITHIN 24 HOURS OF CONNECTION TO
SURFACE WATER OR PROPERTY EDGE 1, 2, 3
REMAINING PORTIONS OF DRAINAGE
DITCH OR SWALE 7 DAYS 1, 3
PIPE AND CULVERT OUTLETS 24 HOURS
STOCKPILES 7 DAYS 1
AMENDMENT # DATE DESCRIPTION
STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 s w pp p.
dw jri ch ne r s av ed
:3 /9
/2
:1 lo t:3
/9 /2
6:
P M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
BID DOCUMENTS
Approved: Project Director
SWPPP 1
GC701
1-MILE RADIUS
AROUND PROJECT
UNNAMED
WATER FEATURE
UNNAMED
WATER FEATURES
PROJECT
SITES
5 46
GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY
1. CONTRACTOR SHALL AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO
THE SWPPP AND ASSOCIATED PLAN SHEETS WITHIN 7 DAYS UPON IMPLEMENTATION.
STORE THE SWPPP AND ALL AMENDMENTS ON SITE AT ALL TIMES.
2. PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE
FOR CONCRETE MANAGEMENT, CONCRETE SLURRY APPLICATION AREAS, WORK IN
AND NEAR AREAS OF ENVIRONMENTAL SENSITIVITY, AREAS IDENTIFIED IN THE PLANS
AS "SITE MANAGEMENT PLAN AREA", ANY WORK THAT WILL REQUIRE DEWATERING,
AND AS REQUESTED BY THE ENGINEER. SUBMIT ALL SITE MANAGEMENT PLANS TO
THE ENGINEER IN WRITING. ALLOW ALL MINIMUM OF 7 DAYS FOR THE ENGINEER TO
REVIEW AND ACCEPT SITE MANAGEMENT PLAN SUBMITTALS. WORK WILL NOT BE
ALLOWED TO COMMENCE IF A SITE MANAGEMENT PLAN IS REQUIRED UNTIL
ACCEPTANCE HAS BEEN GRANTED BY THE ENGINEER. THERE WILL BE NO EXTRA TIME
ADDED TO THE CONTRACT DUE TO THE UNTIMELY SUBMITTAL.
3. IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD PONDS AND INSTALL
EROSION CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE
MAXIMUM EXTENT PRACTICABLE.
4. BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY.
5. DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS
NOT TO BE DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. IF IT
BECOMES NECESSARY TO DISTURBED AREAS OUTSIDE OF THE CONSTRUCTION LIMITS
OBTAIN WRITTEN PERMISSION FROM THE PROJECT ENGINEER PRIOR TO PROCEEDING.
PRESERVE ALL NATURAL BUFFERS SHOWN ON THE PLANS.
6. ROUTE STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER
FEASIBLE. PROVIDE EROSION CONTROL AND VELOCITY DISSIPATION DEVICES AS
NEEDED TO KEEP CHANNELS FROM ERODING AND TO PREVENT NUISANCE
CONDITIONS AT THE OUTLET.
7. DIRECT DISCHARGES FROM BMPS TO VEGETATED AREA WHENEVER FEASIBLE.
PROVIDE VELOCITY DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION.
8. THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS
NECESSARY TO MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE
SEDIMENT ON SITE. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO
COMMENCEMENT OF ANY REMOVAL WORK AND/OR GROUND DISTURBING ACTIVITIES
COMMENCE.
9. SEDIMENT CONTROL DEVICES TO BE IMPLEMENTED FOR ALL AREAS REMAINING
DISTURBED FOR OVER 14 DAYS.
10. SEDIMENT CONTROLS TO BE IMPLEMENTED PRIOR TO GRADING AND WITHIN 7 DAYS
OF GRUBBING.
11. ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND
UP GRADIENT OF ANY BUFFER ZONES BEFORE AND UP GRADIENT LAND DISTURBING
ACTIVITIES BEGIN. MAINTAIN SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS
COMPLETE AND THE SITE IS STABILIZED.
12. LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND,
LOW-VELOCITY SHEET FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR
TO DISCHARGING TO SURFACE WATERS. PLACE J-HOOKS AT A MAXIMUM OF 100 FOOT
INTERVALS.
13. PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM 5
FEET FROM THE TOE OF SLOPE WHERE FEASIBLE. DO NOT PLACE STOCKPILES IN
NATURAL BUFFER AREAS, SURFACE WATERS OR STORMWATER CONVEYANCES.
14. FLOATING SILT CURTAIN IS ALLOWED AS PERIMETER CONTROL FOR IN WATER WORK
ONLY. INSTALL THE FLOATING SILT CURTAIN AS CLOSE TO SHORE AS POSSIBLE. PLACE
PERIMETER CONTROL BMP ON LAND IMMEDIATELY AFTER THE IN WATER WORK IS
COMPLETED.
15. DITCH CHECKS WILL BE PLACED AS INDICATED ON THE PLANS DURING ALL PHASES OF
CONSTRUCTION.
16. SEDIMENT BARRIERS TO MEET MAXIMUM DRAINAGE LIMITS AS DESCRIBED IN THE
OHIO RAINWATER LAND DEVELOPMENT MANUAL.
17. PLACE CONSTRUCTION EXITS, AS NECESSARY, TO PREVENT TRACKING OF SEDIMENT
ONTO PAVED SURFACES BOTH ON AND OFF THE PROJECT SITE. PROVIDE
CONSTRUCTION EXITS OF SUFFICIENT SIZE TO PREVENT TRACK OUT. MAINTAIN
CONSTRUCTION EXITS WHEN EVIDENCE OF TRACKING IS DISCOVERED. REGULAR
STREET SWEEPING IS NOT AN ACCEPTABLE ALTERNATIVE TO PROPER CONSTRUCTION
EXIT INSTALLATION AND MAINTENANCE. CONSTRUCTION EXITS ARE INCIDENTAL.
18. DISCHARGE TURBID OR SEDIMENT LADEN WATER TO TEMPORARY SEDIMENT BASINS
WHENEVER FEASIBLE. IN THE EVENT THAT IT IS NOT FEASIBLE TO DISCHARGE THE
SEDIMENT LADEN WATER TO A TEMPORARY SEDIMENT BASIN, THE WATER MUST BE
TREATED SO THAT IT DOES NOT CAUSE A NUISANCE CONDITION IN THE RECEIVING
WATERS OR TO DOWNSTREAM LANDOWNERS. CLEAN OUT ALL PERMANENT
STORMWATER BASINS REGARDLESS OF WHETHER USED AS TEMPORARY SEDIMENT
BASINS OR TEMPORARY SEDIMENT TRAPS TO THE DESIGN CAPACITY AFTER ALL UP
GRADIENT LAND DISTURBING ACTIVITY IS COMPLETED.
19. PROVIDE SCOUR PROTECTION AT ANY OUTFALL OF DEWATERING ACTIVITIES.
20. PROVIDE STABILIZATION IN ANY TRENCHES CUT FOR DEWATERING OR SITE DRAINING
PURPOSES.
POLLUTION PREVENTION
SEE SPECIFICATION SECTIONS:
01 57 19 - TEMPORARY ENVIRONMENTAL CONTROL
01 74 19 - CONSTRUCTION WASTE MANAGEMENT
RECORD RETENTION
THE SWPPP, ALL CHANGES TO IT AND INSPECTION AND MAINTENANCE RECORDS MUST BE
KEPT ON-SITE DURING CONSTRUCTION. THE OWNER MUST RETAIN A COPY OF THE SWPPP
ALONG WITH THE FOLLOWING RECORDS FOR THREE (3) YEARS AFTER SUBMITTAL OF THE
NOTICE OF TERMINATION (NOT).
1. ANY OTHER PERMITS REQUIRED FOR THE PROJECT.
2. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING
CONSTRUCTION
3. ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENT THAT HAVE BEEN
IMPLEMENTED INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER
BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND
4. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT
STORMWATER MANAGEMENT SYSTEMS.
SWPPP SCHEDULE OF INSTALLATION & MAINTENANCE
DESCRIPTION OF PERMANENT STORMWATER TREATMENT SYSTEMS
SECTION 46 IGC:
THERE WILL BE NO SIGNIFICANT CHANGE IN IMPERVIOUS SURFACES, THEREFORE
STORMWATER WILL CONTINUE TO BE TREATED BY THE EXISTING STORM SEWER IN THE
SURROUNDING AREA.
COLUMBARIUM:
STORMWATER IN THIS AREA WILL BE ROUTED VIA DRAINTILE TO NEW STORM SEWER,
WHICH WILL THEN CONNECT TO EXISTING STORM SEWER IN THE SURROUNDING AREA.
ESTIMATED BMPS QUANTITIES
ITEM INSTALLATION INSPECTION &
MAINTENANCE REMOVAL
SILT FENCE PRIOR TO COMMENCEMENT OF
EARTHWORK OPERATIONS.
INSPECT & MAINT. AFTER EACH
RUN-OFF EVENT. REMOVE
SEDIMENTS AS REQUIRED.
AFTER TRIBUTARY DRAINAGE
AREA IS RESTORED.
ROCK CONST.
ENTRANCE
PRIOR TO COMMENCEMENT OF
EARTHWORK OPERATIONS.
INSPECT REGULARLY. MAINTAIN
AS NEEDED. PRIOR TO PAVING.
INLET PROTECTION
EXISTING INLETS SHOWN ON
PLANS AND UPON INLET
CONSTRUCTION.
WHEN 1/3 CAPACITY OF BMP IS
REACHED.
AFTER TRIBUTARY AREAS
ARE FULLY RESTORED.
SEED & MULCH AFTER GRADING IS COMPLETED.
INSPECT & MAINTAIN AFTER HEAVY
RAINS. REPLACE WASH-OUT
AREAS IMMEDIATELY.
NO REMOVAL NECESSARY.
BMP ORIGINAL ESTIMATE MODIFICATION DATE
ENERGY DISSIPATER
TEMP. DIVERSION DIKES
CHECK DAMS
TEMP SEEDING
PERMANENT SEEDING
PERMANENT SODDING
MULCHES (SPECIFY TYPES)
CAT 3 EROSION CONTROL BLANKET
SOIL TACKIFIERS
SILT FENCING
EROSION CONTROL MATS
STORM DRAIN INLET PROTECTION
TEMPORARY OR PERMANENT
SEDIMENTATION BASINS
CONSTRUCTION ENTRANCE
DEWATERING (TREATMENT LOCATION,
SCHEMATIC, & SAMPLING PLAN REQUIRED
CONCRETE TRUCK WASHOUT
STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 1 OF 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 s w pp p.
dw jri ch ne r s av ed
:3 /9
/2
:1 lo t:3
/9 /2
6:
P M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
BID DOCUMENTS
Approved: Project Director
GC702
SWPPP 2
NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO
WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR
WOOD POSTS WITH STAPLES.
DIRECTION OF
RUNOFF FLOW
2' MIN
ENGINEERING FABRIC
FABRIC ANCHORAGE TRENCH
BACKFILL WITH TAMPED
NATURAL SOILMETAL OR WOOD
POST OR STAKE
WIRE MESH
REINFORCEMENT
(OPTIONAL)
TYPICAL INSTALLATION
NATURAL SOIL
6" MIN.
6" MIN.
50' MINIMUM
AS REQUIRED
6" MINIMUM
1"-2" WASHED ROCK
1" (25 mm) REBAR
FOR BAG REMOVAL
FROM INLET
EXPANSION RESTRAINT
[1/4" (6 mm) NYLON ROPE, 2" (51 mm) FLAT
WASHERS]
2 EACH DUMP
STRAPS
DUMP STRAP
SILT SACK
SCALE:1
SILT FENCE DETAIL
N.T.S. SCALE:2
ROCK CONSTRUCTION ENTRANCE
N.T.S.
SCALE:3
INLET SEDIMENT PROTECTION
N.T.S.
6 46
GARAGE
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 e xi st in g co nd iti on s su rv ey o ve ra ll.
dw jri ch ne r s av ed :3
/9 /2
:2 lo t:3 /9
/2
6:
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
VF101
JREH
EXISTING CONDITIONS PLAN
OVERALL
N 0 150' 300'
MCMAHON AVE
WISCONSIN AVE
BROW
N A
VE
HAWAII PL
IN
D
IAN
A AVE
C O
LO
R
AD
O
AVE
TEXAS AVE
DAKOTA AVE
KA
N
SA
S
AV
E
S G
ET
TY
SB
U
R G
A
VEW THIRD ST
NEW MEXICO PL
PENNSYLVANIA AVE
OHIO AVE
W
ISC
O N
SIN
AVE
W THIRD ST
S G
ET
TY
SB
U
R G
A
VE
SCALE:1
EXISTING CONDITIONS PLAN OVERALL
1"=150'
VF102
VF103
GENERAL NOTES
1. EXISTING TOPOGRAPHIC AND UTILITY INFORMATION
PROVIDED BY A/E ON A SURVEY PREPARED BY
RANDALL MILLER & ASSOCIATES, INC. NO
POTHOLING OCCURRED. BE ADVISED THAT THE
LOCATION AND TYPE OF EXISTING UTILITIES SHOWN
ON THE PLANS ARE FOR GENERAL INFORMATION
ONLY. THE INFORMATION IS NOT WARRANTED TO BE
ACCURATE OR COMPLETE. THE CONTRACTOR, IN
COOPERATION WITH THE APPROPRIATE UTILITY
COMPANY OR MUNICIPALITY, IS RESPONSIBLE FOR
VERIFYING THE LOCATION, SIZE, AND DEPTH OF ALL
UNDERGROUND UTILITIES.
2. THE HORIZONTAL CONTROL IS BASED UPON THE
OHIO STATE PLANE COORDINATE SYSTEM. RMA
ESTABLISHED EXTERIOR CONTROL AND THEN
SUPPLEMENTED IT WITH INTERIOR CONTROL WITH
ELECTRONIC ROBOTIC INSTRUMENTS.
3. THE VERTICAL CONTROL WAS ESTABLISHED FROM
THE FOUND NGS DATA SHEET SURVEY CONTROL IN
THE AREA SPECIFICALLY MONUMENTS E-140, PID
JZ0006, ELEVATION 784.36 NAVD 88. ELEVATION WAS
THEN TRANSFERRED TO THE SITE AND THE CONTROL
POINTS ADJUSTED TO THE ESTABLISHED NGS
ELEVATION. THE PRIOR SURVEYS WERE CHECKED
AND FOUND TO BE WITHIN TOLERANCES.
4. THE NATIONAL FLOOD HAZARD FIRM MAPPING
INDICATES THE AREA IS IN ZONE "X" (NO FLOODING
RISK) PER MAP # 39113C 0235E DATED 1-6-2005 (NOT
PRINTED) AND CITY OF DAYTON 390409.
5. THE SOUTH RIGHT OF WAY LINE FOR THIRD STREET
WAS LOCATED PER THE FOUND EVIDENCE IN THE
STREET AND THE OLD FENCING THAT WAS PLACED
ON THE PROPERTY LINE ACCORDING TO THE
GROUNDS SUPERINTENDENT.
6. THE WEST RIGHT OF WAY LINE FOR GETTYSBURG
AVENUE WAS ESTABLISHED FROM THE SECTION LINE
AND STREET MONUMENTS AND THE OLD FENCING
THAT WAS PLACED ON THE PROPERTY LINE
ACCORDING TO THE GROUNDS SUPERINTENDENT.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 e xi st in g co nd iti on s su rv ey o ve ra ll.
dw jri ch ne r s av ed :3
/9 /2
:2 lo t:3 /9
/2
6:
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
VF102
JREH
EXISTING CONDITIONS
ENLARGEMENT 1
SCALE:1
EXISTING CONDITIONS PLAN ENLARGEMENT 1
1"=20'
N 0 20' 40'
8 46
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Fi le
P at h:
y
:\1
\1 v a nc a da yt on n c\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \p ha se
\1 e xi st in g co nd iti on s su rv ey o ve ra ll.
dw jri ch ne r s av ed :3
/9 /2
:2 lo t:3 /9
/2
6:
P
M
Office of Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj #
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
810CM3029
44 WEST THIRD STREET, DAYTON OHIO 45428
BID DOCUMENTS
Date: Dwg. of --
IRRIGATION: COST ESTIMATING:GEOTECHNICAL :STRUCTURAL:
IMEG
2882 106TH STREET,
DES MOINES, IA 50322
515-334-9906
TODD BARRETT
EC DESIGN
400 5TH STREET,
WEST DES MOINES, IA 50265
515-225-6365
ERIK CHRISTIANSEN
TERRACON
611 LUNKEN PARK DR,
CINCINNATI, OH 45226
513-321-5816
JEFFREY DUNLAP
CPMI
1001 GRAND AVENUE, SUITE 201
WEST DES MOINES, IA 50265
515-244-1166
BRYAN BERTRAND MARCH 12, 2021
KEY MAP
BID DOCUMENTS
Approved: Project Director
VF103
JREH
EXISTING CONDITIONS
ENLARGEMENT 2
SCALE:1
EXISTING CONDITIONS PLAN ENLARGEMENT 2
1"=20'
N 0 20' 40'
OHIO AVE
9 46
File details come from the government source that posted it. Updated .