This file contains architectural and engineering drawings for a renovation project of West Virginia State Building #25, located in Parkersburg, West Virginia, under the jurisdiction of the West Virginia General Services Division. The project encompasses a comprehensive renovation of the approximately 45,000 square foot building, including removal of existing exterior insulating finish system (EIFS) and windows on the Avery and Fifth Street facades, replacement with fiber cement panels and new windows, renovation of the vacant sixth floor for occupancy with electrical, mechanical, sprinkler, drywall, and interior finish work, removal and replacement of concrete ramps and planters on the St. Cloud Alley side, and a phased approach requiring the sixth floor renovation and penthouse mechanical systems to be operational prior to exterior facade removal. The project is designed in accordance with the 2015 International Building Code, NFPA 101 Life Safety Code, and applicable state fire codes, with the building classified as occupancy type Business (NFPA 101 Chapter 38) and building type 2-A under the IBC.
The drawing set includes detailed specifications for facade systems using Nichiha fiber cement panels in masonry, brick, and ribbed patterns; window replacement utilizing original opening dimensions with new insulated units and precast cast stone sills; mechanical systems including variable refrigerant flow heat pumps, energy recovery ventilation, hydronic heating with new boiler installation, and comprehensive ductwork design; electrical systems with new panel provisions, lighting upgrades including LED fixtures with emergency backup capabilities, data and communication infrastructure; fire protection with sprinkler system modifications; and life safety provisions including egress paths, emergency exits, and emergency lighting. The contract documents indicate that shop drawings are required prior to fabrication, and the contractor bears responsibility for maintaining building security and weather protection during construction, coordinating with occupied building spaces, proper disposal of demolition debris, and compliance with OSHA safety regulations and all applicable building codes.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
@ AT
A.B. ANCHOR BOLT
ABC AGGREGATE BASE COURSE
ABV ABOVE
A/C AIR CONDITIONING
AC ARMORED CABLE
ACS ACCESS
ACST ACOUSTIC, ACOUSTICAL
A.C.T. ACOUSTIC CEILING TILE
ACP ASPHALTIC CONCRETE PAVING
AD ACCESS DOOR
ADD. ADDITIONAL
ADJ ADJACENT
AED AUTOMATIC EXTERNAL DEFIBRILLATOR
AFF ABOVE FINISH FLOOR
AGGR AGGREGATE
AHR ANCHOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
ANCH. ANCHOR
ANG BM ANGLE BEAM
ANOD ANODIZED
AP ACCESS PANEL
APP ATACTIC PROPYLENE
APPR APPROVED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AUTO. AUTOMATIC
AVG AVERAGE
AWN WDW AWNING WINDOW
B PL BASE PLATE
BAF BAFFLE
BB BASEBOARD
BD BOARD
BD FT BOARD FEET
BDG BRIDGING
BDNG BEDDING
BET BETWEEN
BFF BELOW FINISH FLOOR
BITUM BITUMINOUS
B OR BL BUILDING LINE, BASE LINE
BKBD BACKBOARD
BKG BACKING
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BLW FL BELOW FLOOR
BM BEAM, BENCH MARK
BOT BOTTOM
BR BARE ROOT
BRG BEARING
BRK BRICK
BRLP BURLAP
BRZ BRONZE
BSMT BASEMENT
BSP BLACK STEEL PIPE
C TO C CENTER TO CENTER
C CONC CAST CONCRETE
CAB CABINET
CANTIL CANTILEVER
CANV CANVAS
CB CEMENT BASE
C.E. CONTINUOUS END
CEM CEMENT
CEM FIN CEMENT FINISH
CEM PLAS CEMENT PLASTER
CF CEMENT FLOOR
CG CORNER GUARD
CHKR CHECKER, CHECKERED
CH BD CHALKBOARD
CHR PLCHROME PLATED
CI CAST IRON
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
CJ CONTROL JOINT
~C CENTER LINE
CLDG CLADDING
CLG CEILING
CLO CLOSET
CLR CLEAR
CLWG CLEAR WIRED GLASS
CMP CORRUGATED METAL PIPE
CMPSN COMPOSITION
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
COMP COMPRESSED
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACT, CONTRACTOR
CORR CORRUGATED, CORRIDOR
CP CEMENT PIPE
CPT CARPET
CRS COLD-ROLLED STEEL
CS CAST STONE
CSC CURED SEALED CONCRETE
CSN. JT. CONSTRUCTION JOINT
CSP CEMENT SEWER PIPE
CSTL CAST STEEL
CT CERAMIC TILE
CT STN CUT STONE
CTB CERAMIC TILE BASE
CTR CENTER
CU. FT. CUBIC FOOT
CU YD CUBIC YARD
CULV CULVERT
DAT DATUM
DBL DOUBLE
D.E. DISCONTINUOUS END
DEC DECIDUOUS
DEM DEMOUNTABLE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DI DROP INLET, DUCTILE IRON
DIA DIAMETER
DIR DIRECTION
DISP DISPENSER
DL DEAD LOAD
DMH DROP MANHOLE
DN DOWN
D.O.S. DIAMETER OF SHAFT
DOUG FIR DOUGLAS FIR
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWV DRAIN, WASTE, VENT
EA EACH
EC EDGE OF CURB
E.E. EACH END
E.F. EACH FACE
EFC EXPOSED FINISHED CONCRETE
EIFS EXTERIOR INSULATION & FINISHING SYSTEM
EL ELEVATION
ELEC. ELECTRIC
ELEV ELEVATOR
E.T.B. ELEVATION TOP OF BEAM
E.T.F. ELEVATION TOP OF FOOTING
E.T.S. ELEVATION TOP OF SHAFT
E.T.W. ELEVATION TOP OF WALL
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPF EPOXY FLOOR FINISH
EPX EPOXY POURED FLOOR
EQ EQUAL
EQUIP EQUIPMENT
EV EVERGREEN
EWC ELECTRIC WATER COOLER
EXC EXCAVATE, EXCAVATION
EXH EXHAUST
EXP EXPOSED
EXP JT EXPANSION JOINT
EXPS EXPOSED PAINTED STRUCTURE
EXIST EXISTING
EXT EXTERIOR
F TO F FACE TO FACE
FAS FASCIA
FC BRK FACE BRICK
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FGL FIBERGLASS
FHYD FIRE HYDRANT
FIN FINISH
FL FLOOR
FL FIN CONC FLOAT FINISH CONCRETE
FLEX FLEXIBLE
FLSH FLASHING
FMBD FORM BOARD
FRST GL FROSTED GLASS
FRT FIRE RESISTANT TREATED
FT FOOT
FTG FOOTING
FUR FURRED (ING)
FURN FURNISH
G GIRDER
GA GAGE, GAUGE
GALV GALVANIZE, GALVANIZED
GC GENERAL CONTRACTOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFECI GOVERNMENT FURNISHED EQUIPMENT,
CONTRACTOR INSTALLED
GFM GOVERNMENT FURNISHED MATERIAL
GFRC GLASS-FIBER REINFORCED CONCRETE
GFRG GLASS-FIBER REINFORCED GYPSUM
GFRP GLASS-FIBER REINFORCED PLASTER
GL GLASS
GL BLK GLASS BLK
GLZ GLAZING
GOVT GOVERNMENT
GR GRADE
GRAN GRANITE
GRND GROUND
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GUT GUTTER
GVL GRAVEL
GYP GYPSUM
GYP PLAS GYPSUM PLASTER
GYP WB GYPSUM WALLBOARD
HC HOLLOW CORE
HC HOLLOW CORE MASONRY UNIT
HD HEAD
HDBD HARDBOARD
HDR HEADER
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HYD HYDRANT
IB I BEAM
I.D. INSIDE DIAMETER
I.F. INSIDE FACE
I.F.H. INSIDE FACE HORIZONTAL
I.F.V. INSIDE FACE VERTICAL
INFL INFLUENT
INSUL INSULATION
INTR INTERIOR
INV INVERT, INVERSE
IP IRON PIPE, IRON PIN
ISO. JT. ISOLATION JOINT
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
LA LAMINATE
LAM GL LAMINATED GLASS
LAT LATTICE
LAV LAVATORY
LBR LUMBER
LD BEARING LOAD BEARING
LKR LOCKER
LIVE LOAD LIVE LOAD
LL GB LEAD LINED GYPSUM BOARD
LONG. LONGITUDINAL
LPS LIQUID PENETRATING SEALER
LWC LIGHTWEIGHT CONCRETE
MAHOG MAHOGANY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MK MARK
MO MASONRY OPENING
MON MONUMENT
MR RECEPTOR MOP
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MULL MULLION
MWP MEMBRANE WATERPROOFING
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NKL NICKEL
NLB NON LOAD BEARING
NO.,NOS NUMBER, NUMBERS
NTS NOT TO SCALE
O TO O OUT TO OUT
OA OVERALL
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
OGL OBSCURE GLASS
OPG OPENING
OPP OPPOSITE
OPQ OPAQUE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
OWGL OBSCURE WIRED GLASS
PAGB PAINTED ABUSE RESISTANT GYPSUM BOARD
PAR PARAPET
PBD PARTICLE BOARD
PC PORTLAND CEMENT
PCF POUNDS PER CUBIC FOOT
PCP PRECAST CONCRETE PANEL
PCS PAINTED CONCRETE SURFACE
PCT PORCELAIN CERAMIC TILE
PED PEDESTAL
PEG PEG BOARD
PH PHASE
PI POINT OF INTERSECTION
PIB POLYISOBUTYLENE
PIGB PAINTED IMPACT RESISTANT GYPSUM BOARD
PLBG PLUMBING
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLATF PLATFORM
~P PLATE
± PLUS/MINUS
PLYWD PLYWOOD
PMBC PLANT MIX BITUMINOUS CONCRETE
PMGB PAINTED MOISTURE RESISTANT GYPSUM BOARD
PNL PANEL
PNT PAINT
POL POLISH, POINT OF LINE
POLY POLYETHYLENE
PORC PORCELAIN
POTW POTABLE WATER
PP POLYPROPYLENE
PPGL POLISHED PLATE GLASS
PS POLYSTYRENE
PS CONC PRESTRESSED CONCRETE
PTN PARTITION
P. T. PRESSURE TREATED
PUR PURLINS
PVA POLYVINYL ACETATE
PVC POLYVINYL CHLORIDE
PVF POLYVINYL FLUORIDE
PVMT PAVEMENT
QT QUARRY TILE
Ø ROUND (DIAMETER)
R RISER
R/W RIGHT OF WAY
RAD. RADIUS
RB RUBBER BASE
RBR. RUBBER
RD ROOF DRAIN, ROAD
REBAR REINFORCING STEEL BAR
RECVG. RECEIVING
REC. RECESS
REF. REFERENCE
REFL. REFLECTED
REINF. REINFORCED, REINFORCEMENT
REQD. REQUIRED
RESIL. RESILIENT
REV. REVISION
RF. ROOF
RFS RUBBER FLOORING SYSTEM
RFG. ROOFING
RFH ROOF HATCH
RL ROOF LEADER
RM. ROOM
RO ROUGH OPENING
RR ROLL ROOFING
RRB RESILIENT RUBBER BASE
RST REINFORCING STEEL
RUB RUBBER FLOORING
RVB RESILIENT VINYL BASE
RW REDWOOD
SAF SYNTHETIC ATHLETIC FLOORING
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE
SCT STRUCTURAL CLAY TILE
SD STORM DRAIN
SEC SECRETARY
SECT SECTION
SFP SPRAYED FIRE PROTECTION
SFTWD SOFTWOOD
SG SILTY GRAVEL
SH SHINGLES
SHT SHEET
SHTHG SHEATHING
SHT MTL SHEET METAL (FLASHING)
SHV SHELVING
SIM SIMILAR
SM SHEET METAL
SMP SOLID MASONRY PIER
SMB SMART BOARD
SP SPACE, SPACES
SPEC SPECIFICATION
SPF SPRUCE-PINE-FIR
SPR SPRINKLER
SQ SQUARE
SQ BR SQUARE BAR
SS SANITARY SEWER
SSD SURFACE DRAIN
SSM SOLID SURFACE MATERIAL
SSP STAINLESS STEEL PIPE
SST STAINLESS STEEL
ST STREET
STA STATION
STD STANDARD
STL STEEL
ST GL STAINED GLASS
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STS STEEL TROWELED SURFACE
STRUCT STL STRUCTURAL STEEL
STRUCT STRUCTURE
STSTL STAINLESS STEEL
SUBSTA SUBSTATION
SUP SUPPLY
SURF SURFACE
SUSP SUSPENDED
SV SHEET VINYL
SW SIDEWALK
SYNTH SYNTHETIC
T TREAD
T & B TOP AND BOTTOM
T & G TONGUE AND GROOVE
TC TERRA COTTA
TD TRENCH DUCT
TEL TELEPHONE
TEJ TRANSVERSE EXPANSION JOINT
TEMP TEMPERATURE
T/F TOP OF FOOTING
THK THICK
THRES THRESHOLD
TKBD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TMPD HDBD TEMPERED HARDBOARD
TN TRUE NORTH
T O C TOP OF CONCRETE
T.O.S. TOP OF SLAB
TRTD TREATED
TS TUBE STEEL
T/S TOP OF STEEL
T/W TOP OF WALL
TYP TYPICAL
U.L. UNDERWRITERS LABORATORY
U.O.N. UNLESS OTHERWISE NOTED
UNPV RD UNPAVED ROAD
UR URINAL
U.S. URINAL SCREEN
UTIL UTILITY
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VT VINYL TILE
VW VINYL WOOD
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WATER MAIN
W/ WITH
W/O WITHOUT
WA WAINSCOT
WB WOOD BASE
WBL WOOD BLOCKING
WBS WROUGHT BRASS
WDC WOOD CLAD
WC WATER CLOSET
WD WOOD
WDPT WOOD (PRESSURE TREATED)
WDW WINDOW
WF WIDE FLANGE
WFR WOOD FRAME
WGL WIRED GLASS
WI WROUGHT IRON
WM WIRE MESH
WMP WIRE MESH PARTITION SYSTEM
WP WORKING POINT, WEATHERPROOF
WPF WATERPROOFING
WPM WATERPROOF MEMBRANE
WS WEATHER STRIP
WR WIRE ROPE
WSL WEATHER SEAL
WST WASTE
WT WINDOW TYPE
WTR WATER
WVC WOOD VENEER WALL COVERING
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
YCO YARD CLEANOUT
YD YARD DRAIN
YHYD YARD HYDRANT
A101
SIM
A101
Name Elevation
CONCRETE
CLAY UNIT MASONRY
CONCRETE UNIT MASONRY
WOOD FRAMING
PLYWOOD
FINISHED WOOD
BATT INSULATION
RIGID INSULATION
GYPSUM BOARD
SOIL
CRUSHED STONE
CENTER LINE
HIDDEN LINE
VIEW TITLE
ELEVATION MARKER
SECTION MARKER
DETAIL CALLOUT
ROOM TAG
GRID LINE MARKER
ELEVATION DATUM
SPOT ELEVATION MARK
WALL TAG
WALL REINFORCING TAG
DOOR TAG
WINDOW TAG
SYMBOL DESCRIPTION
A101
SIM
C4
Room name
View Name
SCALE: 1/8" = 1'-0"
A101
Ref
1R ef
1 R ef
Ref
1. THIS PROJECT HAS BEEN DESIGNED IN ACCORDANCE
WITH THE 2015 INTERNATIONAL BUILDING CODE, THE LIFE
SAFETY CODE (NFPA 101-2015) AND THE STATE FIRE
CODE.
2. WRITTEN SPECIFICATIONS FOR THE PROJECT ARE
PROVIDED TO ESTABLISH AND MAINTAIN A LEVEL OF
MANUFACTURE AND QUALITY. ALL SUBSTITUTION
REQUESTS MUST BE MADE IN ACCORDANCE WITH THE
BID INSTRUCTIONS
3. CONSTRUCTION METHODS, PROCEDURES AND
SEQUENCES ARE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL TAKE ALL
NECESSARY MEANS TO MAINTAIN AND PROTECT THE
STRUCTURAL INTEGRITY OF ALL CONSTRUCTION AT ALL
STAGES. THE DESIGN FIRM(S) SHALL NOT BE
RESPONSIBLE FOR THE NEGLIGENCE OF THE
CONTRACTOR(S), SUB-CONTRACTOR(S) OR ANY OTHER
PERSON(S) INVOLVED IN THE WORK, OR IN THE FAILURE
OF SAID PERSON(S) TO CARRY OUT THE WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. WRITTEN SPECIFICATIONS SHALL SUPERSEDE
DRAWINGS.
5. DIMENSIONS SHALL SUPERSEDE DRAWINGS. DO NOT
SCALE DRAWINGS. WHERE A MISSING OR CONFLICTING
DIMENSION OCCURS, THE ARCHITECT SHALL BE
CONTACTED IMMEDIATELY TO OBTAIN THE NECESSARY
CLARIFICATION.
6. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY
AND ALL DISCREPANCIES BETWEEN THE DRAWINGS AND
ACTUAL FIELD CONDITIONS IMMEDIATELY UPON
DISCOVERY.
7. COMMENCEMENT OF THE WORK SHALL SIGNIFY THE
CONTRACTOR IS FAMILIAR WITH AND AGREES TO THE
SCOPE OF WORK AS OUTLINED IN THE CONTRACT
DOCUMENTS.
8. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES
AND REGULATIONS IMPOSED BY OSHA AND THE OWNER
AT ALL TIMES. IF THERE IS A CONFLICT BETWEEN THE
TWO, THE STRICTER REGULATION SHALL APPLY.
9. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEANS
TO MAINTAIN AND PROTECT ADJACENT PROPERTY FROM
DAMAGE DURING THE PROCESS OF THE WORK.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
DISPOSAL OF ALL MATERIALS RESULTING FROM THE
WORK OF THIS PROJECT. THE PROJECT SITE SHALL AT
ALL TIMES BE MAINTAINED IN AN ORDERLY MANNER SO
AS TO MINIMIZE ACCUMULATION OF WASTE AND/OR
SURPLUS MATERIALS. PROPER DISPOSAL RECEIPTS
SHALL BE OBTAINED AND RETAINED FOR OWNER'S
REVIEW. AT THE COMPLETION OF THE WORK THE
CONTRACTOR SHALL REMOVE ALL DEBRIS, SURPLUS
MATERIAL AND CONSTRUCTION EQUIPMENT FROM THE
PREMISES.
11. SHOP DRAWINGS ARE REQUIRED AS LISTED IN THE
PROJECT MANUAL.
GENERAL NOTES
PROJECT NOTES
OCCUPANCY
NFPA 101 - BUSINESS - CHAPTER 38
IBC 2012 - GROUP B
BUILDING TYPE
NFPA 101 - TYPE 2-111
IBC 2012 - TYPE 2-A
GROSS SQ. FOOTAGE
GROUND FLOOR APPROX. 45,000 SF BUILDING AREA
NO. OF EXITS - 5
SPRINKLERS - YES
BUILDING CODE ANALYSIS
1. REMOVAL OF EXISTING EXTERIOR INSULATING FINISH
SYSTEM AND EXTERIOR WINDOWS ON AVERY AND FIFTH
STREET FACADES.
2. REPLACE FACADE MATERIAL WITH FIBER CEMENT PANELS.
3. INSTALL NEW ORIGINAL SIZED OPENING WINDOWS.
4. REMOVE AND REPLACE CONCRETE RAMP AND CONCRETE
PLANTERS ON ST.CLOUD ALLEY SIDE OF BUILDING.
5. RENOVATE VACANT 6TH FLOOR FOR OCCUPANCY. TRADES
INCLUDE: ELECTRICAL, MECHANICAL, SPRINKLERS,
WINDOWS, DRYWALL & INTERIOR FINISHES.
6. PHASING PLAN: 6TH FLOOR RENOVATION & PENTHOUSE
MECHANICAL MUST BE OPERATIONAL PRIOR TO REMOVAL OF
EIFS AND EXISTING WINDOWS. 6TH FLOOR TO FUNCTION AS
"SWING" SPACE FOR DISPLACED WORKERS IN OCCUPIED
AREAS OF BUILDING DURING RENOVATION OF FACADE.
7. ANY REFERENCE TO 6TH FLOOR, LEVEL 6, ETC. IS A NAMING
CONVENTION ONLY. BUILDING IS ESSENTIALLY A 2-STOREY
BUILDING WITH LEVEL 6 APPROX. 15'-0" ABOVE FINISHED
GRADE. THE VARIOUS LEVELS ARE CREATED FROM MULTIPLE
INTERIOR FLOOR HEIGHTS. HENCE: LEVEL 3 IS @ GRADE W/
LEVEL 2 SLIGHTLY 1/2 LEVEL BELOW. LEVEL 4 IS @ GRADE W/
LEVEL 5 1/2 LEVEL ABOVE. LEVEL 6 IS FULL LEVEL ABOVE
LEVEL 4.
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 2:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
G001
SYMBOLS & CODE
ANALYSIS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
No. ITEM DATE
UP
M
F
UP
UP
F M
M
F
D D
PATH OF TRAVEL TO ROOF 47'
34' - 1"
261 SF
PENTHOUSE
/4
19' - 10"
1-HR ACCESS PANEL
EXISTING EXIT
TO GROUND
1733 SF
LEVEL
PATH OF TRAVEL TO GROUND 120'- 3"
EMERGENCY
EXIT TO ROOF
FE-1 ABC-TYPE WALL MOUNTED FIRE EXTINGUISHER
FE-2 ELECTRONIC SAFE WALL MOUNTED FIRE EXTINGUISHER
FE-3 ABD-TYPE WALL MOUNTED FIRE EXTINGUISHER
FE-K K-TYPE WALL MOUNTED FIRE EXTINGUISHER
SMOKE PARTITION
1-HR BARRIER
PATH OF TRAVEL
Name
WIDTH OF EGRESS
EGRESS CAPACITY
ROOM NAME
ALLOWABLE OCCUPANTS
AREA
ALLOWABLE OCCUPANT DENSITY
• 1920 SQ FEET
• LEVEL 6 IS APPROX. 15'-0" ABOVE GRADE
• NOT TO EXCEED 20 OCCUPANTS
• TWO MEANS OF EGRESS
1. EXIT TO ROOF
2. EXIT TO GROUND
3. WINDOW EMERGENCY EXIT TO ROOF
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 2:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
G101
LIFE SAFETY PLANS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
PENTHOUSE LIFE SAFETY PLAN
SCALE: 1/8" = 1'-0"
LEVEL 6 LIFE SAFETY PLAN
LIFE SAFETY LEGENDLIFE SAFETY PLAN GENERAL
NOTES
No. ITEM DATE
P L A N
N
S
W
E
UPDN
UP
DN
3 4 5 6 7 8
J
H
G
F
E
D
C.9
D.3
LOBBY
REC.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
VESTIBULE
RECEPTION
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADA BUTTON
FOR DOOR
FLOOR TO
SILL 2'-4"
HOSE BIB
6' - 10" 6' - 3" 7' - 1 3/4" 7' - 2 1/2" 7' - 2 1/2" 5' - 11" 7' - 2 1/2"
7'
5" 7'
0"
7'
1/
2"
16' - 2" 15' - 2" 16' - 11 1/2" 16' - 11 1/2" 16' - 11 1/2" 16' - 11 3/4" 15' - 6" 17' - 2"
7'
1/
2" 6'
/4
7'
3"
1"
1"
/4
WOMEN
BREAKROOM
WORK
RAIN LEADER - EXACT LOCATION
TO BE VERIFIED IN FIELD.
ADJACENT
STRUCTURE
EXISTING LOADING DOCK
C
B
A
K
1.5
G.1
H.1 H.2
NIC
MEN
158' - 11 1/2"
/4
CROSS-HATCH
AREA NOT IN CONTRACT
RECEPTION
OFFICE
OFFICE
RECEPTION
OFFICE
OFFICE
FILE
10' - 0"
7' - 4" 22' - 4"
5' - 0"
EXISTING
CONCRETE
PLANTER
EXISTING
CONCRETE
STEPS
STEEL RAILINGS
EXISTING BRICK MASONRY
EXISTING
CONCRETE
PLANTER
8" STEEL LINTEL/BULKHEAD (3"
DEEP) OVERHEAD
FIRE ALARM
STATION
FIRE STROBE ABOVE
7' FROM CORNER
SIAMESE HOSE
CONNECTION
5TH STREET
A V
E R
Y S
T R
E E
T
EXISTING LOCATION OF DUPLEX RECEPTACLE -
RETAIN & RECONNECT
ROOF DRAIN
RD
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 2:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
G102
EXISTING 3RD FLOOR
PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
EXISTING LEVEL 3
EXISTING LEGEND
No. ITEM DATE
P L A N
N
S
DN
DN
DN
UP
3 4 5 6 7 8 9 102
J
H
G
F
E
D
C.9
D.3
OFFICE
CUBICLES
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
16' - 2" 15' - 2" 16' - 11 1/2" 16' - 11 1/2" 16' - 11 1/2" 16' - 11 3/4" 15' - 6" 17' - 2"
1"
1"
3' - 3" 2' - 11 3/4" 7' - 1 3/4" 7' - 2 1/2" 6' - 7 3/4" 7' - 2 1/2" 2' - 9 1/2" 3' - 5 1/4"
3'
1/
2" 7'
0"
7'
1/
2" 7'
1/ 2"
3'
4" 3'
1/ 2"
2'
/4
ABANDONED RAIN LEADER
CONTRACTOR TO VERIFY
THAT LEADER IS ABANDONED
RAIN LEADER
ADJACENT
STRUCTURE
ROOF
ROOF
133' - 8 1/4"
9'
/4
/4
A304
EXISTING CANOPY ROOF
RD
RD
A103
C
B
A
K
.5
G.1
H.1 H.2
OFFICE
WORK
509A
CROSS-HATCH
AREA NOT IN CONTRACT
EXISTING LOCATION OF DUPLEX RECEPTACLE -
RETAIN & RECONNECT
ROOF DRAIN
RD
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 2:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
G103
EXISTING 5TH FLOOR
PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
EXISTING LEVEL 5
EXISTING LEGEND
No. ITEM DATE
P L A N
N
S
F M
M M
F
D D
UP
3 4 5 6 7
E
D
C.9
D.3
7' - 0"
1920 SF
6TH FLOOR
C
B
A
EXISTING EXIT TO
GROUND @ LEVEL 4
STAIRS FROM LEVEL 5
TO LEVEL 4 (GROUND)
10' - 7 1/2"17' - 2"
0"
71' - 11 1/4"
NIC NIC
3 4 5 6
C.9
D.3
C
52' - 0"
ENCAPSULATED ABANDONED
TRANSITE EQUIPMENT
EXISTING PLYWOOD
ACCESS PANEL
J
EXISTING ROOF DRAIN
EXISTING ROOF DRAIN
ADJOINING STRUCTURE
A304
STANDING WATER
EXISTING STONE CAP
K
1.5
G.1
H.1 H.2
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 2:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
G104
EXISTING 6TH FLOOR,
PENTHOUSE & LOWER
ROOF PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
EXISTING LEVEL 6
No. ITEM DATE
SCALE: 1/8" = 1'-0"
EXISTING PENTHOUSE
SCALE: 1/8" = 1'-0"
EXISTING LOWER ROOF
P L A N
N
S
UP
UP
1. OWNER IS RESPONSIBLE FOR REMOVAL OF LOOSE EQUIPMENT AND FURNISHINGS FROM
THE AREA OF RENOVATION, PRIOR TO DEMOLITION OF ANY WALLS AND WINDOWS.
TYPICAL THROUGHOUT PROJECT.
2. PRIOR TO ANY DEMOLITION, A PHASING PLAN MUST BE IN PLACE THAT ADDRESSES THE
ORDER OF DEMOLITION AND THE TIMING OF DEMOLITION. THIS PLAN IS TO BE
COMMUNICATED NOT ONLY TO THE OWNER, BUT THE OWNER'S REPRESENTATIVE ON
SITE THAT WILL COMMUNICATE SAID PLAN TO EMPLOYEES OF THE OCCUPIED SPACES.
BUILDING WILL CONTINUE TO BE OCCUPIED DURING THE DEMOLITION AND RENOVATION
OF THE BUILDING.
3. PRIOR TO DEMOLITION OF THE EXTERIOR FACADE AND WINDOW MATERIAL, A PLAN MUST
BE IN PLACE THAT ADDRESSES THE PROTECTION OF THE INTERIOR SPACES FROM
EXPOSURE TO THE ELEMENTS AND THE SECURITY OF THE PROPERTY. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE BUILDING SECURITY AND
PROTECTION FROM EXPOSURE TO THE ELEMENTS FOR THE DURATION OF THE PROJECT.
4. REMOVAL OF INTERIOR GYPSUM BOARD SHALL NECESSITATE THE RELOCATION OF SOME
ELECTRICAL AND DATA DEVICES FROM THE IMMEDIATE ZONE OF WORK. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOCATIONS OF DATA BOXES AND
ELECTRICAL OUTLETS, TEMPORARILY DISCONNECT, AND RELOCATE THOSE DEVICES AT
THE SAME LOCATION WITHIN THE NEW WORK, AND RECONNECT POWER AND DATA TO
PROPER PERFORMANCE LEVEL.
5. INTERIOR SPACE THAT IS NOT CONSIDERED PART OF THE PROJECT WORK AREA SHALL
BE PROTECTED BY A PHYSICAL BARRIER THAT SHIELDS OCCUPANTS IN ADJACENT
SPACES FROM AIRBORNE DUST AND DEBRIS.
6. EXCESSIVE NOISE MAKING ACTIVITIES SHALL BE SCHEDULED IN ADVANCE WITH THE
OWNER’S REPRESENTATIVE AND PERFORMED AT SUCH TIME OF DAY SO AS TO MINIMIZE
DISRUPTION TO THE ACTIVITY OF THE OCCUPANTS.
7. DEMOLITION DEBRIS SHALL BE REMOVED DAILY FROM THE INTERIOR PORTION OF THE
WORK AREA, AND SHALL NOT BE ALLOWED TO “COLLECT”. A CONSTRUCTION DEBRIS
WASTE AND RECYCLING PLAN SHALL BE IN PLACE PRIOR TO START OF DEMOLITION.
8. NO ON-SITE BURNING SHALL BE ALLOWED.
9. PRIOR TO “CUTTING” INTO ANY WALL OR PORTION OF STRUCTURE, CONTRACTOR TO
ASCERTAIN PRESENCE OF LIVE WIRING AND/OR PLUMBING AND TAKE PRECAUTIONS
NECESSARY TO PROTECT WORKERS AND COMPLETED AREAS OF THE BUILDING FROM
ACCIDENTAL ELECTROCUTION OR FLOODING.
10. CONTRACTOR TO PROVIDE SAFETY TRAINING AND A WORKPLACE ENVIRONMENT
CONSISTENT WITH OSHA AND STATE LABOR RULES AND REGULATIONS.
REMOVE DAMAGED GYPSUM BOARD AND PLASTIC LAMINATE COUNTER SILL AT
EACH WINDOW LOCATION. (SEE DRAWINGS FOR NEW CONDITION)
REMOVE ALUMINUM STOREFRONT WINDOW SYSTEM. RETAIN EXISTING DOOR
AND AUTOMATIC DOOR-OPENING BUTTON IN PLACE.
RETAIN ALUMINUM STOREFRONT WINDOW AND DOUBLE DOOR SYSTEM IN
PLACE.
REMOVE METAL SOFFIT AND SUPPORT STRUCTURE IN ENTRY ALCOVE
RETAIN HOSE BIB LOCATION AND ACCESS. DO NOT DAMAGE DURING DEMOLITION
AND RENOVATION. ENSURE OPERATION AFTER RENOVATION IS COMPLETE.
RETAIN SIAMESE FIRE HOSE CONNECTION, AND ENSURE CONTINUOUS
OPERATION DURING AND AFTER DEMOLITION AND RENOVATION.
RETAIN FIRE ALARM STROBE, AND ENSURE CONTINUOUS OPERATION DURING
AND AFTER DEMOLITION AND RENOVATION.
REMOVE CARPET IN PERIMETER OFFICES.
CARPET IN "OPEN-OFFICE" AREAS IS TO BE REMOVED THE DEPTH OF ONE
CUBICLE, APPROXIMATELY 7'-0".
REMOVE AND REPLACE STEEL LINTEL ABOVE ORIGINAL OPENING TO MATCH
ORIGINAL SIZE AND SHAPE.
REMOVE EXISTING WINDOWS. MAINTAIN SECURE ACCESS TO BUILDING UNTIL
NEW WINDOWS ARE INSTALLED.
EXISTING LOCATION OF DUPLEX RECEPTACLE - REMOVE DURING DEMOLITION OF
WALL. RETAIN & RECONNECT IN SAME LOCATION DURING NEW CONSTRUCTION.
ALL RECEPTACLES MAY NOT BE SHOWN.
A
B
C
D
E
F
G
H
I
J
K
L
A021
3 4 5 6 7 8 9 10
JJ
H
G
F
E
D
C.9
D.3
WAITING
RECEPTION
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
VESTIBULE
OFFICE
OFFICE
317 OFFICE
OFFICE
OFFICE
OFFICE
BREAK ROOM/
VENDING
WOMEN'S
RESTROOM
A021
REMOVE EXISTING EIFS FINISH AND PREPARE ORIGINAL MASONRY FINISH
INTERIOR PARTITION TO
REMAIN - DO NOT
DISTURB DURING
RENOVATION
R
EM
O
VE
E
XI
ST
IN
G E
IF
S
FI
N
IS
H
A N
D P
R
EP
AR
E
O R
IG
IN
AL
M
AS
O
N R
Y
FI
N
IS
H
ECF
B
E A
LINE OF
DISTURBANCE
A
ADJACENT
STRUCTURE
9'
158' - 11 1/2"
N.I.C.
N.I.C.
RAIN LEADER
A021 3
A2023
C
B
A
KK
1.5
G.1
H.1 H.2
HHH
H
H
H
HHHHH
I
CROSS-HATCH
AREA NOT IN CONTRACT
CONCRETE LANDING TO
REMAIN
REMOVE CONCRETE
PLANTER
REMOVE EXISTING
CONCRETE STEPS
REMOVE EXISTING
CONCRETE SIDEWALK
REMOVE EXISTING
CONCRETE RAMP AND
RAILING
REMOVE HANDRAIL & HANDRAIL
BRACKETS AT EXTERIOR WALL
REPAIR EXISTING WALL
AFTER DEMO OF RAILING
REMOVE CONCRETE
PLANTER
A
A
A
A
A
AAAAA
9'
/2
/4
13' - 2"11' - 0"12' - 0"12' - 0"12' - 0"10' - 0"12' - 6" G
REMOVE EXISTING EIFS FINISH
EXISTING STRUCTURE TO BE
WRAPPED WITH NEW COLUMN
SURROUND
5TH STREET
A V
E R
Y S
T R
E E
T
K
K
K
K
K
K
21' - 3 1/4"
7' - 4 1/4" 6' - 11" 7' - 0"
L L L
L
L
L
1. EXISTING LAY IN-GRID CEILINGS AND LIGHTING MAY BE USED AS PART OF RENOVATION.
ANY DAMAGE CAUSED TO EXISTING MATERIAL IS TO BE REPAIRED AND/OR REPLACED BY
CONTRACTOR.
2. ALL STEEL LINTELS SHALL HAVE RUST REMOVED, BE SCRAPED CLEAN, AND REFINISHED
w/ RUST INHIBITING PAINT.
3. REPLACEMENT OF STEEL LINTELS IS TO BE PERFORMED FROM THE EXTERIOR OF THE
BUILDING. PROPER SHORING OF EXISTING LINTELS IS TO OCCUR DURING REPLACEMENT
THAT SHALL PROTECT STRUCTURE AND OCCUPANTS FROM ANY UNFORESEEN EVENT OR
FAILURE.
4. REMOVE QUAD-LITE RIBBON WINDOWS FROM EXTERIOR OF BUILDING ON AVERY & 5TH
STREET. EXERCISE CAUTION IN REMOVING WINDOWS, AS INTERIOR WOOD SUPPORT MAY
BE COMPROMISED BY WATER DAMAGE. REMOVE ANY AND ALL WOOD FRAMING THAT
SUPPORTS EXISTING WINDOW BEHIND FACADE.
5. REMOVE EIFS FROM EXISTING BRICK AND LIMESTONE SUBSTRATE (TYPICAL). EMPLOY
DRY-ICE CLEANING FOR COMPLETE REMOVAL OF GLUE, CEMENT, AND MECHANICAL
FASTENERS. REMOVE ANY AND ALL SUPPORTING "BATTEN" STRIPS USED TO SUPPORT
EIFS.
6. DIMENSIONS STATED ON 5TH & AVERY STREET ARE INDICATING ASSUMED LOCATION &
WIDTH OF ORIGINAL OPENING IN FACADE.
1. ENTRANCE TO BUILDING ON ST. CLOUD ALLEY TO REMAIN OPERATIONAL DURING
DEMOLITION.
2. PRIOR TO ANY DEMOLITION, CONTRACTOR TO PROVIDE PROTECTED ACCESS FROM
PARKING LOT TO ENTRANCE ON ST. CLOUD ALLEY FOR VISITORS & OCCUPANTS OF
BUILDING.
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 0:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A011
3RD FLOOR DEMOLITION
PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
DEMOLITION PLAN GENERAL NOTES
DEMOLITION PLAN KEYED NOTES
SCALE: 1/8" = 1'-0"
3RD FLOOR DEMOLITION PLAN
No. ITEM DATE
DEMOLITION PLAN TYPICAL WORK NOTES
DEMOLITION SHEET NOTES - ST. CLOUD
P L A N
N
S
UP
UP
UP
3 4 5 6 7 8 9 102
J
H
G
F
E
D
C.9
D.3
R
EM
O
VE
E
XI
ST
IN
G E
IF
S
FI
N
IS
H
A N
D P
R
EP
AR
E
O R
IG
IN
AL
M
AS
O
N R
Y
FI
N
IS
H F
O R
N
EW
IN
SU
LA
TE
D M
ET
AL
P
AN
EL
S
YS
TE
M
LINE OF
DISTURBANCE
LINE OF
DISTURBANCE
REMOVE EXISTING EIFS FINISH AND PREPARE ORIGINAL MASONRY FINISH FOR NEW INSULATED METAL PANEL SYSTEM
ADJACENT
STRUCTURE
ROOF
ROOF
9'
158' - 11 1/2"
A
A
OPEN OFFICE
WAITING
OFFICE
510 OFFICE
OFFICE
ABANDONED RAIN LEADER
CONTRACTOR TO VERIFY
THAT LEADER IS ABANDONED
RAIN LEADER
A201 3
A202
A021 3
A2023
C
B
A
K
.5
G.1
H.1 H.2
I
H
H
H
M
H I
CROSS-HATCH
AREA NOT IN CONTRACT
JA A A A A A A
J
A
A J
A
A
A J
A J
8' - 0" 8' - 0" 12' - 0" 12' - 0" 12' - 0" 8' - 0" 8' - 0"
8'
0"
L
L
L
L
L
LLL
1. OWNER IS RESPONSIBLE FOR REMOVAL OF LOOSE EQUIPMENT AND FURNISHINGS FROM
THE AREA OF RENOVATION, PRIOR TO DEMOLITION OF ANY WALLS AND WINDOWS.
TYPICAL THROUGHOUT PROJECT.
2. PRIOR TO ANY DEMOLITION, A PHASING PLAN MUST BE IN PLACE THAT ADDRESSES THE
ORDER OF DEMOLITION AND THE TIMING OF DEMOLITION. THIS PLAN IS TO BE
COMMUNICATED NOT ONLY TO THE OWNER, BUT THE OWNER'S REPRESENTATIVE ON
SITE THAT WILL COMMUNICATE SAID PLAN TO EMPLOYEES OF THE OCCUPIED SPACES.
BUILDING WILL CONTINUE TO BE OCCUPIED DURING THE DEMOLITION AND RENOVATION
OF THE BUILDING.
3. PRIOR TO DEMOLITION OF THE EXTERIOR FACADE AND WINDOW MATERIAL, A PLAN MUST
BE IN PLACE THAT ADDRESSES THE PROTECTION OF THE INTERIOR SPACES FROM
EXPOSURE TO THE ELEMENTS AND THE SECURITY OF THE PROPERTY. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE BUILDING SECURITY AND
PROTECTION FROM EXPOSURE TO THE ELEMENTS FOR THE DURATION OF THE PROJECT.
4. REMOVAL OF INTERIOR GYPSUM BOARD SHALL NECESSITATE THE RELOCATION OF SOME
ELECTRICAL AND DATA DEVICES FROM THE IMMEDIATE ZONE OF WORK. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOCATIONS OF DATA BOXES AND
ELECTRICAL OUTLETS, TEMPORARILY DISCONNECT, AND RELOCATE THOSE DEVICES AT
THE SAME LOCATION WITHIN THE NEW WORK, AND RECONNECT POWER AND DATA TO
PROPER PERFORMANCE LEVEL.
5. INTERIOR SPACE THAT IS NOT CONSIDERED PART OF THE PROJECT WORK AREA SHALL
BE PROTECTED BY A PHYSICAL BARRIER THAT SHIELDS OCCUPANTS IN ADJACENT
SPACES FROM AIRBORNE DUST AND DEBRIS.
6. EXCESSIVE NOISE MAKING ACTIVITIES SHALL BE SCHEDULED IN ADVANCE WITH THE
OWNER’S REPRESENTATIVE AND PERFORMED AT SUCH TIME OF DAY SO AS TO MINIMIZE
DISRUPTION TO THE ACTIVITY OF THE OCCUPANTS.
7. DEMOLITION DEBRIS SHALL BE REMOVED DAILY FROM THE INTERIOR PORTION OF THE
WORK AREA, AND SHALL NOT BE ALLOWED TO “COLLECT”. A CONSTRUCTION DEBRIS
WASTE AND RECYCLING PLAN SHALL BE IN PLACE PRIOR TO START OF DEMOLITION.
8. NO ON-SITE BURNING SHALL BE ALLOWED.
9. PRIOR TO “CUTTING” INTO ANY WALL OR PORTION OF STRUCTURE, CONTRACTOR TO
ASCERTAIN PRESENCE OF LIVE WIRING AND/OR PLUMBING AND TAKE PRECAUTIONS
NECESSARY TO PROTECT WORKERS AND COMPLETED AREAS OF THE BUILDING FROM
ACCIDENTAL ELECTROCUTION OR FLOODING.
10. CONTRACTOR TO PROVIDE SAFETY TRAINING AND A WORKPLACE ENVIRONMENT
CONSISTENT WITH OSHA AND STATE LABOR RULES AND REGULATIONS.
REMOVE DAMAGED GYPSUM BOARD AND PLASTIC LAMINATE COUNTER SILL AT
EACH WINDOW LOCATION. (SEE DRAWINGS FOR NEW CONDITION)
REMOVE ALUMINUM STOREFRONT WINDOW SYSTEM. RETAIN EXISTING DOOR
AND AUTOMATIC DOOR-OPENING BUTTON IN PLACE.
RETAIN ALUMINUM STOREFRONT WINDOW AND DOUBLE DOOR SYSTEM IN
PLACE.
REMOVE METAL SOFFIT AND SUPPORT STRUCTURE IN ENTRY ALCOVE
RETAIN HOSE BIB LOCATION AND ACCESS. DO NOT DAMAGE DURING DEMOLITION
AND RENOVATION. ENSURE OPERATION AFTER RENOVATION IS COMPLETE.
RETAIN SIAMESE FIRE HOSE CONNECTION, AND ENSURE CONTINUOUS
OPERATION DURING AND AFTER DEMOLITION AND RENOVATION.
RETAIN FIRE ALARM STROBE, AND ENSURE CONTINUOUS OPERATION DURING
AND AFTER DEMOLITION AND RENOVATION.
REMOVE CARPET IN PERIMETER OFFICES.
CARPET IN "OPEN-OFFICE" AREAS IS TO BE REMOVED THE DEPTH OF ONE
CUBICLE, APPROXIMATELY 7'-0".
REMOVE AND REPLACE STEEL LINTEL ABOVE ORIGINAL OPENING TO MATCH
ORIGINAL SIZE AND SHAPE.
REMOVE EXISTING WINDOWS. MAINTAIN SECURE ACCESS TO BUILDING UNTIL
NEW WINDOWS ARE INSTALLED.
EXISTING LOCATION OF DUPLEX RECEPTACLE - REMOVE DURING DEMOLITION OF
WALL. RETAIN & RECONNECT IN SAME LOCATION DURING NEW CONSTRUCTION.
ALL RECEPTACLES MAY NOT BE SHOWN.
A
B
C
D
E
F
G
H
I
J
K
L
1. EXISTING LAY IN-GRID CEILINGS AND LIGHTING MAY BE USED AS PART OF RENOVATION.
ANY DAMAGE CAUSED TO EXISTING MATERIAL IS TO BE REPAIRED AND/OR REPLACED BY
CONTRACTOR.
2. ALL STEEL LINTELS SHALL HAVE RUST REMOVED, BE SCRAPED CLEAN, AND REFINISHED
w/ RUST INHIBITING PAINT.
3. REPLACEMENT OF STEEL LINTELS IS TO BE PERFORMED FROM THE EXTERIOR OF THE
BUILDING. PROPER SHORING OF EXISTING LINTELS IS TO OCCUR DURING REPLACEMENT
THAT SHALL PROTECT STRUCTURE AND OCCUPANTS FROM ANY UNFORESEEN EVENT OR
FAILURE.
4. REMOVE QUAD-LITE RIBBON WINDOWS FROM EXTERIOR OF BUILDING ON AVERY & 5TH
STREET. EXERCISE CAUTION IN REMOVING WINDOWS, AS INTERIOR WOOD SUPPORT MAY
BE COMPROMISED BY WATER DAMAGE. REMOVE ANY AND ALL WOOD FRAMING THAT
SUPPORTS EXISTING WINDOW BEHIND FACADE.
5. REMOVE EIFS FROM EXISTING BRICK AND LIMESTONE SUBSTRATE (TYPICAL). EMPLOY
DRY-ICE CLEANING FOR COMPLETE REMOVAL OF GLUE, CEMENT, AND MECHANICAL
FASTENERS. REMOVE ANY AND ALL SUPPORTING "BATTEN" STRIPS USED TO SUPPORT
EIFS.
6. DIMENSIONS STATED ON 5TH & AVERY STREET ARE INDICATING ASSUMED LOCATION &
WIDTH OF ORIGINAL OPENING IN FACADE.
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 0:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A012
5TH FLOOR DEMOLITION
PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
5TH FLOOR DEMOLITION PLAN
DEMOLITION PLAN GENERAL NOTES
DEMOLITION PLAN KEYED NOTES
No. ITEM DATE
DEMOLITION PLAN TYPICAL WORK NOTES
P L A N
N
S
UP UP
3 4 5 6 7
E
D
C.9
D.3
A2023
C
B
A
EXISTING EXIT TO
GROUND @ LEVEL 2
STAIRS FROM LEVEL 5
TO LEVEL 4 (GROUND)
REMOVE EXISTING WALLS
& DOOR FROM AROUND
STAIRS. LEAVE STAIRS IN
PLACE.
REMOVE EXISTING
HANDRAIL FROM STAIR.
REMOVE INFILLED
MASONRY FROM WITHIN
ORIGINAL WINDOW
OPENINGS.
REMOVE INFILLED
MASONRY FROM WITHIN
ORIGINAL WINDOW
OPENINGS.
3 4 5 6
E
C.9
D.3
A202
C
52' - 0"
REMOVE DOOR &
FRAME ONLY AFTER
REPLACEMENT DOOR
& FRAME ARE ON-SITE.
DEMO HANDRAIL AND ALL
ATTACHMENTS TO FLOOR
REMOVE EXISTING
2'x3' PLYWOOD WOOD
PANEL IN WALL.
PREPARE OPENING FOR
NEW STEEL ACCESS PANEL ENCAPSULATED ABANDONED
TRANSITE EQUIPMENT. USE
APPROPRIATE CAUTION WHILE
PREPARING ACCESS PANEL.
1. REMOVE STANDING WATER FROM EXISTING EPDM ROOF
2. CLEAN OUT DRAINS
3. REPAIR EXISTING SUBSTRATE AS NECESSARY.
J
A304
K
.5
G.1
H.2
REMOVE EXISTING EPDM
& ALL UNDERLYING
ROOF INSULATION
REMOVE EXISTING
REGLETS &
TERMINATION
BARS
1. OWNER IS RESPONSIBLE FOR REMOVAL OF LOOSE EQUIPMENT AND FURNISHINGS FROM
THE AREA OF RENOVATION, PRIOR TO DEMOLITION OF ANY WALLS AND WINDOWS.
TYPICAL THROUGHOUT PROJECT.
2. PRIOR TO ANY DEMOLITION, A PHASING PLAN MUST BE IN PLACE THAT ADDRESSES THE
ORDER OF DEMOLITION AND THE TIMING OF DEMOLITION. THIS PLAN IS TO BE
COMMUNICATED NOT ONLY TO THE OWNER, BUT THE OWNER'S REPRESENTATIVE ON
SITE THAT WILL COMMUNICATE SAID PLAN TO EMPLOYEES OF THE OCCUPIED SPACES.
BUILDING WILL CONTINUE TO BE OCCUPIED DURING THE DEMOLITION AND RENOVATION
OF THE BUILDING.
3. PRIOR TO DEMOLITION OF THE EXTERIOR FACADE AND WINDOW MATERIAL, A PLAN MUST
BE IN PLACE THAT ADDRESSES THE PROTECTION OF THE INTERIOR SPACES FROM
EXPOSURE TO THE ELEMENTS AND THE SECURITY OF THE PROPERTY. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE BUILDING SECURITY AND
PROTECTION FROM EXPOSURE TO THE ELEMENTS FOR THE DURATION OF THE PROJECT.
4. REMOVAL OF INTERIOR GYPSUM BOARD SHALL NECESSITATE THE RELOCATION OF SOME
ELECTRICAL AND DATA DEVICES FROM THE IMMEDIATE ZONE OF WORK. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOCATIONS OF DATA BOXES AND
ELECTRICAL OUTLETS, TEMPORARILY DISCONNECT, AND RELOCATE THOSE DEVICES AT
THE SAME LOCATION WITHIN THE NEW WORK, AND RECONNECT POWER AND DATA TO
PROPER PERFORMANCE LEVEL.
5. INTERIOR SPACE THAT IS NOT CONSIDERED PART OF THE PROJECT WORK AREA SHALL
BE PROTECTED BY A PHYSICAL BARRIER THAT SHIELDS OCCUPANTS IN ADJACENT
SPACES FROM AIRBORNE DUST AND DEBRIS.
6. EXCESSIVE NOISE MAKING ACTIVITIES SHALL BE SCHEDULED IN ADVANCE WITH THE
OWNER’S REPRESENTATIVE AND PERFORMED AT SUCH TIME OF DAY SO AS TO MINIMIZE
DISRUPTION TO THE ACTIVITY OF THE OCCUPANTS.
7. DEMOLITION DEBRIS SHALL BE REMOVED DAILY FROM THE INTERIOR PORTION OF THE
WORK AREA, AND SHALL NOT BE ALLOWED TO “COLLECT”. A CONSTRUCTION DEBRIS
WASTE AND RECYCLING PLAN SHALL BE IN PLACE PRIOR TO START OF DEMOLITION.
8. NO ON-SITE BURNING SHALL BE ALLOWED.
9. PRIOR TO “CUTTING” INTO ANY WALL OR PORTION OF STRUCTURE, CONTRACTOR TO
ASCERTAIN PRESENCE OF LIVE WIRING AND/OR PLUMBING AND TAKE PRECAUTIONS
NECESSARY TO PROTECT WORKERS AND COMPLETED AREAS OF THE BUILDING FROM
ACCIDENTAL ELECTROCUTION OR FLOODING.
10. CONTRACTOR TO PROVIDE SAFETY TRAINING AND A WORKPLACE ENVIRONMENT
CONSISTENT WITH OSHA AND STATE LABOR RULES AND REGULATIONS.
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 0:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A013
6TH FLOOR, PENTHOUSE,
& LOW ROOF
DEMOLITION PLANS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
6TH FLOOR DEMOLITION PLAN
No. ITEM DATE
SCALE: 1/8" = 1'-0"
PENTHOUSE DEMOLITION PLAN
ROOF DEMOLITION GENERAL NOTES
P L A N
N
S
W
E
SCALE: 1/8" = 1'-0"A013
LOWER ROOF DEMOLITION PLAN4
DEMOLITION PLAN GENERAL NOTES
LEVEL 2
630' - 10"
LEVEL 4
641' - 10"
LEVEL 3
636' - 4"
LEVEL 6
653' - 10"
ROOF
664' - 9"
REMOVE EIFS FROM ORIGINAL
MASONRY FACADE (TYPICAL)
REMOVE WINDOWS &
FRAMES FROM EIFS FACADE
(TYPICAL)
BRICK ELEVATOR SHAFT BEYOND
PENTHOUSE
664' - 11"
LEVEL 4
641' - 10"
LEVEL 3
636' - 4"
LEVEL 6
653' - 10"
ROOF
664' - 9"
ELEVATOR ROOM
679' - 3"
RETAIN EXISTING
ALUMINUM FRAME DOOR
AND WINDOW @ ALCOVE
RETAIN EXISTING STOREFRONT ENTRANCE
REMOVE EIFS FROM ORIGINAL
MASONRY FACADE (TYPICAL)
REMOVE WINDOWS &
FRAMES FROM EIFS FACADE
(TYPICAL)
A304
A501
PENTHOUSE
664' - 11"
REMOVE EXISTING EIFS FROM BELOW
STOREFRONT (TYP. @ RECESSED ENTRIES)
REMOVE EXISTING EIFS FROM BELOW
STOREFRONT (TYP. @ RECESSED ENTRIES)
1. OWNER IS RESPONSIBLE FOR REMOVAL OF LOOSE EQUIPMENT AND FURNISHINGS FROM
THE AREA OF RENOVATION, PRIOR TO DEMOLITION OF ANY WALLS AND WINDOWS.
TYPICAL THROUGHOUT PROJECT.
2. PRIOR TO ANY DEMOLITION, A PHASING PLAN MUST BE IN PLACE THAT ADDRESSES THE
ORDER OF DEMOLITION AND THE TIMING OF DEMOLITION. THIS PLAN IS TO BE
COMMUNICATED NOT ONLY TO THE OWNER, BUT THE OWNER'S REPRESENTATIVE ON
SITE THAT WILL COMMUNICATE SAID PLAN TO EMPLOYEES OF THE OCCUPIED SPACES.
BUILDING WILL CONTINUE TO BE OCCUPIED DURING THE DEMOLITION AND RENOVATION
OF THE BUILDING.
3. PRIOR TO DEMOLITION OF THE EXTERIOR FACADE AND WINDOW MATERIAL, A PLAN MUST
BE IN PLACE THAT ADDRESSES THE PROTECTION OF THE INTERIOR SPACES FROM
EXPOSURE TO THE ELEMENTS AND THE SECURITY OF THE PROPERTY. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE BUILDING SECURITY AND
PROTECTION FROM EXPOSURE TO THE ELEMENTS FOR THE DURATION OF THE PROJECT.
4. REMOVAL OF INTERIOR GYPSUM BOARD SHALL NECESSITATE THE RELOCATION OF SOME
ELECTRICAL AND DATA DEVICES FROM THE IMMEDIATE ZONE OF WORK. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOCATIONS OF DATA BOXES AND
ELECTRICAL OUTLETS, TEMPORARILY DISCONNECT, AND RELOCATE THOSE DEVICES AT
THE SAME LOCATION WITHIN THE NEW WORK, AND RECONNECT POWER AND DATA TO
PROPER PERFORMANCE LEVEL.
5. INTERIOR SPACE THAT IS NOT CONSIDERED PART OF THE PROJECT WORK AREA SHALL
BE PROTECTED BY A PHYSICAL BARRIER THAT SHIELDS OCCUPANTS IN ADJACENT
SPACES FROM AIRBORNE DUST AND DEBRIS.
6. EXCESSIVE NOISE MAKING ACTIVITIES SHALL BE SCHEDULED IN ADVANCE WITH THE
OWNER’S REPRESENTATIVE AND PERFORMED AT SUCH TIME OF DAY SO AS TO MINIMIZE
DISRUPTION TO THE ACTIVITY OF THE OCCUPANTS.
7. DEMOLITION DEBRIS SHALL BE REMOVED DAILY FROM THE INTERIOR PORTION OF THE
WORK AREA, AND SHALL NOT BE ALLOWED TO “COLLECT”. A CONSTRUCTION DEBRIS
WASTE AND RECYCLING PLAN SHALL BE IN PLACE PRIOR TO START OF DEMOLITION.
8. NO ON-SITE BURNING SHALL BE ALLOWED.
9. PRIOR TO “CUTTING” INTO ANY WALL OR PORTION OF STRUCTURE, CONTRACTOR TO
ASCERTAIN PRESENCE OF LIVE WIRING AND/OR PLUMBING AND TAKE PRECAUTIONS
NECESSARY TO PROTECT WORKERS AND COMPLETED AREAS OF THE BUILDING FROM
ACCIDENTAL ELECTROCUTION OR FLOODING.
10. CONTRACTOR TO PROVIDE SAFETY TRAINING AND A WORKPLACE ENVIRONMENT
CONSISTENT WITH OSHA AND STATE LABOR RULES AND REGULATIONS.
REMOVE WINDOWS & FRAMES
FROM FACADE
EXISTING BRICK TO REMAIN
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 0:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A021
DEMO ELEVATIONS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"A021
AVERY STREET DEMO ELEVATION1
SCALE: 1/8" = 1'-0"A021
FIFTH STREET DEMO ELEVATION2
DEMOLITION PLAN GENERAL NOTES
No. ITEM DATE
SCALE: 1/8" = 1'-0"A021
ST. CLOUD ALLEY DEMO ELEVATION3
UP
UP
UP
UP
UP
3 4 5 6 7 8 9 10
J
H
G
FF
E
D
C.9
D.3
A301
A2012
A201
WAITING
RECEPTION
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
VESTIBULE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAK ROOM/
VENDING
WOMEN'S
RESTROOM
ENTRANCE VESTIBULE
WINDOWS AND DOOR TO REMAIN
ENTRANCE VESTIBULE
WINDOWS AND DOORS
TO REMAIN
A502
OFFICE
CUBICLES
A301
A401 B
A401 A
A301
A305
ADJACENT
STRUCTURE
C
B
D
A501
A302
A302
A201 3
A202
A202
9'
2"
A501
A305
A302
A104
A501
A2023
C
B
A
K
1.5
G.1
H.1 H.2
LINE OF
DISTURBANCE
CANOPY
OVERHEAD
A502
Sim A502
Sim
A501
Sim
A501
Sim
107107107
A501
Sim
A501
Sim
EXIT DOOR
TO REMAIN. PAINT
EXTERIOR FACE &
JAMB
A501
Sim
W9
W9
W9
W10
W10
W10
S T
. C
LO
U D
A
LL
E Y
5TH STREET
CROSS-HATCH
AREA NOT IN CONTRACT
W1 W2 W3 W3 W3 W4
W2
W2
W2
W2
W2
W2
W6
W11 W11 W5
B
B
B
B
B
BBBBBBB
A
EF
EF
EF
EF
EF
EF
EFEFEFEFEFEFEF
A V
E R
Y S
T R
E E
T
H
J
J
RE-LOCATE EXISTING
RAIN LEADER AS NECESSARY
K K
NO INTERIOR
WORK
D
D
D
DDDDDDD
L
M
M
M
M
M
M
EXIT DOOR
TO REMAIN. PAINT
EXTERIOR FACE &
JAMB
1. CONTRACTOR IS TO VERIFY ALL CONDITIONS IN THE FIELD AND NOTIFY ARCHITECT AT
ONCE OF ANY DISCREPANCIES.
2. REFER TO DEMOLITION GENERAL NOTES ON SHEET A011 AND A012 FOR ADDITIONAL
NOTES.
3. CONTINUE TO PROTECT ADJACENT SPACES, OFFICES, ETC. FROM DEBRIS AND DUST
CREATED DURING RENOVATION PROJECT. DO NOT REMOVE BARRIER/ BARRICADES
UNTIL WORK IS SUBSTANTIALLY COMPLETE. SEE LINE OF DISTURBANCE.
4. AT ALL LOCATIONS WHERE WINDOWS ARE REPLACED, PROVIDE AND INSTALL
REPLACEMENT 5/8" GYPSUM BOARD OVER METAL STUD FRAMING, SO AS TO REPAIR
WALL WHERE WATER DAMAGE AND REPLACEMENT SILL AND WINDOW HAS OCCURRED.
GYPSUM BOARD REPAIR/REPLACEMENT TO INCLUDE TAPE, SPACKLE, SAND, AND PAINT.
JAMB WALL, SOFFIT CEILING, ETC. SURROUNDING WINDOW LOCATION WILL BE
AFFECTED.
5. EXISTING LIGHTING TO BE RE-USED IN OFFICES.
6. FALL PROTECTION TO BE MANUFACTURED FROM ALUMINUM COMPONENTS. SEGMENT
AS REQUIRED TO MATCH CURVE OF RAMP.
7. SHOP DRAWINGS OF RAIL & FALL PROTECTION TO BE PROVIDED PRIOR TO FABRICATION.
8. TAPE, SPACKLE, SAND & FINISH ALL NEW GYPSUM BOARD TO FLUSH, SMOOTH
CONDITION WITH EXISTING GYPSUM BOARD. GENERAL CONTRACTOR SHALL FINISH
PAINT ENTIRE OFFICE WITH EXPOSED GYPSUM BOARD. DOORS & FRAMES ARE NOT
INCLUDED IN PAINTING & ARE TO BE "MASKED" OUT. THIS PERTAINS TO ALL OFFICES
ALONG PERIMETER OF 5TH & AVERY.
PROVIDE "SPANDREL" GLASS LITE AT LOCATIONS INDICATED. SEE ELEVATIONS ON
SHEET A201.
PROVIDE AND INSTALL NEW WINDOW SILL
RETAIN WALL IN WOMEN'S RESTROOM. LINE FACE OF WALL FACING THE STREET w/
BLACK 1" RIGID INSULATION. PERFORM FACADE REPLACEMENT & WINDOW FROM
EXTERIOR IF POSSIBLE. IF NOT POSSIBLE AND WALL IS TO BE REPLACED, IT IS THE
RESPONSIBILITY OF THE G.C. TO RETURN PARTITION, CEILING, AND FLOORING TO
ORIGINAL CONDITION.
PROVIDE AND INSTALL NEW CARPET TILE IN OFFICES AND TO LINE OF DISTURBANCE
IN OPEN OFFICE AREA.
PROVIDE AND INSTALL NEW RESILIENT CARPET BASE THAT MATCHES THE EXISTING
IN SIZE AND COLOR AT NEW GYPSUM BOARD LOCATION. (TYPICAL)
PROVIDE AND INSTALL COVER PLATES AND ELECTRICAL JUNCTION BOX AT
RELOCATED ELECTRICAL OUTLETS AND DATA LOCATIONS IN AFFECTED AREA, IN
ACCORDANCE WITH NEC.
PROVIDE AND INSTALL NEW STEEL LINTEL INTO ORIGINAL STRUCTURE, AFTER
REMOVAL OF RUSTED LINTEL.
HANDRAILS TO FOLLOW CURVE OF RAMP
INFILL VOID CREATED BY RESTORED WINDOW OPENING WITH GWB PARTITION.
FINISH, SPACKLE, AND PAINT TO MATCH EXISTING WALLS.
SIDE OF WALL FACING WINDOW TO BE FINISHED AND PAINTED
G.C. TO FINISH & PAINT ONLY INTERIOR FACE OF EXTERIOR WALL IN OFFICE CUBICLE
AREA. PAINT COLOR IS TO MATCH EXISTING OPEN OFFICE COLOR.
OFFICES WHERE W9 & W10 WINDOWS ARE TO BE REPLACED ALONG ST. CLOUD
ALLEY ARE TO ONLY HAVE GYPSUM BOARD THAT IS DISTURBED DURING WINDOW
REPLACEMENT TO BE FINISHED & PAINTED TO MATCH ADJACENT WALL FINISHES.
A
B
C
D
E
F
G
H
J
K
L
M
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 1:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A101
3RD FLOOR PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
LEVEL 3 FLOOR PLAN
GENERAL NOTES
KEYED NOTES
No. ITEM DATE
P L A N
N
S
UP
UP
UP
3 4 5 6 7 8 9 102
J
H
G
F
E
D
C.9
D.3
FIFTH STREET
AV
ER
Y
ST
R
EE
T
ST
. C
LO
U
D A
LL
EY
A301
A2012
A201
OPEN OFFICE
WAITING
OFFICE
OFFICE
OFFICE
CONFERENCE
WORK
509A
OFFICE
CUBICLES
A301
ADJACENT
STRUCTURE
ROOF
ROOF
G
G
ABANDONED RAIN LEADER
CONTRACTOR TO VERIFY
THAT LEADER IS ABANDONED
RAIN LEADER
A302
A201 3
A202
A202
A304
A501
Sim
A2023
C
B
A
K
.5
G.1
H.1 H.2
LINE OF
DISTURBANCE
LINE OF
DISTURBANCE
CROSS-HATCH
AREA NOT IN CONTRACT
G
G
G
W7 W7 W8 W8 W8 W8 W7 W7
W7
W7
W7
W7
W7
W7
W7
OFFICE
503 B
B
B
B
B
B
B
BBBBBBBB
EF
EF
EF
EF
EF
EF
EF
EFEFEFEFEFEFEFEF
A103
A502 6 1
A502
J
K
L
L L
D
D
D
D
DDDDDD
1. CONTRACTOR IS TO VERIFY ALL CONDITIONS IN THE FIELD AND NOTIFY ARCHITECT AT
ONCE OF ANY DISCREPANCIES.
2. REFER TO DEMOLITION GENERAL NOTES ON SHEET A011 AND A012 FOR ADDITIONAL
NOTES.
3. CONTINUE TO PROTECT ADJACENT SPACES, OFFICES, ETC. FROM DEBRIS AND DUST
CREATED DURING RENOVATION PROJECT. DO NOT REMOVE BARRIER/ BARRICADES
UNTIL WORK IS SUBSTANTIALLY COMPLETE. SEE LINE OF DISTURBANCE.
4. AT ALL LOCATIONS WHERE WINDOWS ARE REPLACED, PROVIDE AND INSTALL
REPLACEMENT 5/8" GYPSUM BOARD OVER METAL STUD FRAMING, SO AS TO REPAIR
WALL WHERE WATER DAMAGE AND REPLACEMENT SILL AND WINDOW HAS OCCURRED.
GYPSUM BOARD REPAIR/REPLACEMENT TO INCLUDE TAPE, SPACKLE, SAND, AND PAINT.
JAMB WALL, SOFFIT CEILING, ETC. SURROUNDING WINDOW LOCATION WILL BE
AFFECTED.
5. EXISTING LIGHTING TO BE RE-USED IN OFFICES.
6. FALL PROTECTION TO BE MANUFACTURED FROM ALUMINUM COMPONENTS. SEGMENT
AS REQUIRED TO MATCH CURVE OF RAMP.
7. SHOP DRAWINGS OF RAIL & FALL PROTECTION TO BE PROVIDED PRIOR TO FABRICATION.
8. TAPE, SPACKLE, SAND & FINISH ALL NEW GYPSUM BOARD TO FLUSH, SMOOTH
CONDITION WITH EXISTING GYPSUM BOARD. GENERAL CONTRACTOR SHALL FINISH
PAINT ENTIRE OFFICE WITH EXPOSED GYPSUM BOARD. DOORS & FRAMES ARE NOT
INCLUDED IN PAINTING & ARE TO BE "MASKED" OUT. THIS PERTAINS TO ALL OFFICES
ALONG PERIMETER OF 5TH & AVERY.
PROVIDE "SPANDREL" GLASS LITE AT LOCATIONS INDICATED. SEE ELEVATIONS ON
SHEET A201.
PROVIDE AND INSTALL NEW WINDOW SILL
RETAIN WALL IN WOMEN'S RESTROOM. LINE FACE OF WALL FACING THE STREET w/
BLACK 1" RIGID INSULATION. PERFORM FACADE REPLACEMENT & WINDOW FROM
EXTERIOR IF POSSIBLE. IF NOT POSSIBLE AND WALL IS TO BE REPLACED, IT IS THE
RESPONSIBILITY OF THE G.C. TO RETURN PARTITION, CEILING, AND FLOORING TO
ORIGINAL CONDITION.
PROVIDE AND INSTALL NEW CARPET TILE IN OFFICES AND TO LINE OF DISTURBANCE
IN OPEN OFFICE AREA.
PROVIDE AND INSTALL NEW RESILIENT CARPET BASE THAT MATCHES THE EXISTING
IN SIZE AND COLOR AT NEW GYPSUM BOARD LOCATION. (TYPICAL)
PROVIDE AND INSTALL COVER PLATES AND ELECTRICAL JUNCTION BOX AT
RELOCATED ELECTRICAL OUTLETS AND DATA LOCATIONS IN AFFECTED AREA, IN
ACCORDANCE WITH NEC.
PROVIDE AND INSTALL NEW STEEL LINTEL INTO ORIGINAL STRUCTURE, AFTER
REMOVAL OF RUSTED LINTEL.
HANDRAILS TO FOLLOW CURVE OF RAMP
INFILL VOID CREATED BY RESTORED WINDOW OPENING WITH GWB PARTITION.
FINISH, SPACKLE, AND PAINT TO MATCH EXISTING WALLS.
SIDE OF WALL FACING WINDOW TO BE FINISHED AND PAINTED
G.C. TO FINISH & PAINT ONLY INTERIOR FACE OF EXTERIOR WALL IN OFFICE CUBICLE
AREA. PAINT COLOR IS TO MATCH EXISTING OPEN OFFICE COLOR.
OFFICES WHERE W9 & W10 WINDOWS ARE TO BE REPLACED ALONG ST. CLOUD
ALLEY ARE TO ONLY HAVE GYPSUM BOARD THAT IS DISTURBED DURING WINDOW
REPLACEMENT TO BE FINISHED & PAINTED TO MATCH ADJACENT WALL FINISHES.
A
B
C
D
E
F
G
H
J
K
L
M
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 1:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A102
5TH FLOOR PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
LEVEL 5 FLOOR PLAN
GENERAL NOTES
KEYED NOTES
No. ITEM DATE
P L A N
N
S
UP
3 4 5 6 7
E
C.9
D.3
A304
A305
A2023
C
B
A
EXISTING EXIT
TO GROUND
STAIRS FROM LEVEL 5
TO LEVEL 4 (GROUND)
1733 SF
LEVEL 6
A303
A501
2'
1/
4"
5'
1/
4"
1' - 3 1/4" 2' - 3 3/4"
601A
601B
14' - 11 1/2"
A303
S2x
S2 x
S2 x
S2xF1 t
F1t
F1 t
F1t
F1 t
F1t
F1 t
F1t
F1 t
F1t F1 t
F1t
F1t F3 a
F1d
F1 d
F1 d
F1c
F3 a
F3 a F3a
F3 a
F3a
F3 a F3a
G3d
G 3d
F3a
W13
W14
W15
W12
CASEMENT
EMERGENCY
ACCESS
WINDOW
A303
601C
N.I.C.
N.I.C.
RETURN
GUARDRAIL
TO WALL
3 4 5 6
C.9
D.3
A202
A2021
C
52' - 0"
4'
3"
5' - 0"
ENCAPSULATED ABANDONED
TRANSITE EQUIPMENT
MECHANICAL
P101
P101
P102
G 3w
G3w
A303
G 3h
G3h
L1
L2
L3
11' - 1"
PROVIDE NEW 1-HR
ACCESS PANEL FOR
EXISTING OPENING
RETURN RAILING TO WALL
1. PROVIDE TAPERED RIGID POLYISO INSULATION SLOPED TO
ROOF DRAIN FOR POSITIVE ROOF DRAINAGE
2. PROVIDE NEW SINGLE PLY, 60 MIL, REINFORCED EPDM
RUBBER ROOFING, FULLY ADHERED.
3. EXTEND EPDM MIN. 8" ABOVE ADJACENT WALL SURFACE &
MIN. 3" BEHIND NEW FACADE MATERIAL.
4. L1, L2, & L3 ARE NEW EXTERIOR LADDERS FOR MAINTENANCE
ACCESS. MECHANICALLY FASTEN THRU TO EXISTING
MASONRY STRUCTURE. PROVIDE "PULL-TEST" WITH
PROPOSED FASTENERS PRIOR TO INSTALLATION.
J
A301
A301
A304
A304
1/ 8"
1'
-0
1/8" / 1'-0"
1/ 8"
1'
-0
1/8" / 1'-0"
K
.5
G.1
H.1
1. MECHANICAL ROOM & LEVEL 6 EXPOSED GYPSUM BOARD TO
BE TAPED, SPACKLED, SANDED (LEVEL 4), PRIMED & PAINTED.
2. MECHANICAL ROOM & EXISTING PENTHOUSE EXPOSED
EXISTING MASONRY WALLS TO REMAIN AS IS.
3. NOTE GYMPSUM BOARD WALLS @ P101 ARE TO EXTEND TO
ROOF DECK ABOVE (APPROX. 15'-0" A.F.F.)
4. SOME SELECTIVE SLAB CUTS TO BE MADE FOR DUCTWORK &
PIPE PENETRATIONS IN EXISTING 8" CONCRETE SLAB OF
MECHANICAL PENTHOUSE. SEE MECHANICAL SHEETS FOR
LOCATIONS.
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 1:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A103
6TH FLOOR,PENTHOUSE,
AND LOWER ROOF
FLOOR PLANS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"A103
LEVEL 6 FLOOR PLAN1
No. ITEM DATE
SCALE: 1/8" = 1'-0"A103
PENTHOUSE FLOOR PLAN2
NEW ROOF NOTES
SCALE: 1/8" = 1'-0"A103
LOWER ROOF PLAN3
P L A N
N
S
W
GENERAL INTERIOR WORK NOTES
UP
UP
UP
UP
A305
A305
A305
A305
FLAGPOLE
R 13' - 0
A305
A305
A3055
LINE OF
CANOPY
ABOVE
16"x34" ALUMINUM MESH PANEL
16"x34"
ALUMINUM
MESH PANEL
16"x34" ALUMINUM MESH PANEL
ALUMINUM 1-1/2"HANDRAIL
0' - 0"
3' - 7"
UP 5R @ 5 1/2"
DN 3R @ 5 3/4"
D N
R
/8
A202
A305
C
B
A
A501
R 12' - 8
/4
3' - 9 1/4"
S T
. C
LO
U D
A
LL
E Y
FLAGPOLE
R 13' - 0
12 BUXUS SEMPEVIRENS
'VARDER VALLEY'
8 Rhododendron 'PJM Compact'
12 BUXUS SEMPEVIRENS
'VARDER VALLEY'
21 ABELIA GRANDIFOLIA
'PROSTRATA'
HARDWOOD MULCH -
"BANK" MULCH TO FORM SLOPE
FROM LANDING TO CONCRETE CURB
HARDWOOD MULCH
UP
4" CONCRETE CURB
NOTE: SEE C501 FOR PLANTING DETAILS
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 1:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A104
ST. CLOUD ALLEY
ENTRANCE PLANS
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/4" = 1'-0"A104
ENLARGED PLAN - NEW ST. CLOUD ENTRANCE1
SCALE: 1/4" = 1'-0"A104
LANDSCAPING PLAN - NEW ST. CLOUD ENTRANCE2
No. ITEM DATE
P L A N
N
S
A303
A501
A303
A303
7' - 10"
8' - 5"
7' - 10"
7' - 10"
7' - 10"
9' - 5"
1. EXISTING CEILING CONSISTS OF EXPOSED UNDERSIDE OF
CONCRETE SLAB AND BEAMS SUPPORTING PENTHOUSE
FLOOR ABOVE.
2. REMOVE LAITANCE, LOOSE PARTICLES, EFFLORESCENCE,
AND EXCRUSTATIONS FROM CONCRETE SUBSTRATE.
3. PATCH & FILL MAJOR HOLES ABOVE 2" Ø.
4. PRIME & PAINT ALL EXPOSED SURFACES OF OVERHEAD
STRUCTURE.
5. MECHANICAL/ELECTRICAL ELEMENTS ARE SHOWN HERE FOR
REFERENCE ONLY. REFER TO MECHANICAL/ELECTRICAL
SHEETS FOR COMPLETE DESIGN & SPECIFICATIONS.
6. SPOT ELEVATIONS ARE SHOWN OF LOWEST HANGING
OBSTRUCTIONS (CONCRETE BEAMS).
ALPHA ASSOCIATES, INC.
209 PRAIRIE AVENUE
MORGANTOWN, WV 26501
PHONE/FAX: 304-296-8216
TOLL FREE: 800-640-8216
www.thinkALPHAfirst.com
COPYRIGHT 2019 ALPHA ASSOCIATES, INC.
ALL RIGHTS RESERVED
REVISIONS
PROJ. NO.:
DATE:
SHEET NO.:
FO
R
4/
/2
:0 1:
A
M
C :\U se rs
\tl ew is \D oc um en ts
\R ev it\ Bu ild in g
_t od dl ew is
.rv t
A113
LEVEL 6 REFLECTED
CEILING PLAN
1806067.00 03/18/2019
W
ES
T V
IR
G
IN
IA
S
TA
TE
B
UI
LD
IN
G
W
ES
T V
IR
G
IN
IA
G
EN
ER
A L
SE
RV
IC
ES
D
IV
IS
IO
N
IS
SU
ED
F
O R
BI
DD
IN
G
C
O N
ST
RU
C
TIO
N
PA
RK
ER
SB
UR
G
, W
ES
T V
IR
G
IN
IA
SCALE: 1/8" = 1'-0"
6TH FLOOR REFLECTED CEILING PLAN
No. ITEM DATE
P L A N
N
S
W
6TH FLOOR RCP NOTES
LEVEL 3
636' - 4"
LEVEL 5
647' - 4"
ROOF
664' - 9"
A501
W7 W7
W7 W7 W7 W7 W7
W6W2W2W2W2 W2W2
CEMENT FIBER BRICK
PANEL SYSTEM
CEMENT FIBER MASONRY
PANEL SYSTEM
PRE-CAST WINDOW SILL. PROVIDE
CAST STONE SECTIONS (LENGTH)
TO ALIGN W/ VERTICAL MULLIONS
OF WINDOWS. FILL JOINTS W/
MORTAR & CAULK TO MATCH PER
MFG. INSTRUCTIONS.
FIBER CEMENT WINDOW
SURROUND (TYP. @ 2ND
LOCATIONS w/ BRICK
PANELS
A502
Sim
FIBER CEMENT SILL BY FIBER CEMENT
PANEL VENDOR. BREAK @ WINDOW
LOCATIONS WHERE PRE-CAST
WINDOW SILLS WILL BE USED INSTEAD
LEVEL 3
636' - 4"
LEVEL 5
647' - 4"
ROOF