AMEND_02 SF30.pdf
PDF 253 KB Posted
- Solicitation number
- GS-11-P-16-MM-C-7001
About this file
Amend o2 SF30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CUP2_DB_Phase_2_Shortlist.pdf | ||
| AMEND_03_SF30.pdf | ||
| Amend 02 Sign in Sheets 041516 PreConf.pdf | ||
| Amend 02 CUP2 RFI LOG CUP2.pdf | ||
| AMEND_01 SF30.pdf | ||
| GSA527-15.pdf | ||
| NEW--BLANK--NCIC GSA SCVR Oct 2014.xlsx | XLSX spreadsheet | |
| PBS_Past_Performance_Form_Rev_6_12_15.docx | DOCX document | |
| DB201A SOL CUP2.pdf | ||
| DB101_AGREE_CUP2.pdf | ||
| SF1442 CUP2 PH1.pdf | ||
| C301_GC_Reps_ _Certs CUP2.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
GS-11-P-16-MM-C-7001
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment 02
3. EFFECTIVE DATE
04/18/2016
REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
6. ISSUED BY CODE MK 7. ADMINISTERED BY (If other than Item 6) CODE
GSA, NCR, PBS,
Property Development Division (WPC) 301 7th Street, SW Room 2002 Washington, DC 20407
GSA, NCR, PBS,
Property Development Division (WPC) 301 7th Street, SW Room 2002 Washington, DC 20407
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9.A. AMENDMENT OF SOLICITATION NO.
(X)
GS11P16MMC7001
To All Prospective Offerors
9B. DATED (SEE ITEM 11)
03/25/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return ________ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
The solicitation is hereby amended as follows:
The following changes, clarifications, additions and supplements are hereby incorporated into this
SOLICITATION in their entirety as submitted. Continued on Page 2 of this Amendment Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Bonnie Echoles, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
Bonnie Echoles
BY ________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
04/18/2016
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
CONTINUATION OF SF 30: AMENDMENT OF
SOLICITATION/MODIFICATION OF CONTRACT
GS11P16MMC7001
Amendment No. 2
GS-11-P-16-MM-C-7001, RFQ-PHASE I: Design/Build for CENTRAL UTILITY PLANT (CUP) II for the Consolidation of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus, SE, Wash., DC.
THIS IS PHASE 1 – RFQ FOR THIS REQUIREMENT. AS SUCH, THE ONLY
SUBMISSIONS SHALL BE TECHNICAL SUBMISSIONS. PRICING WILL BE
REQUESTED UNDER PHASE 2 – RFP. .
ITEM A: PROPOSAL RECEIPT DATE REMAINS as follows:
April 22, 2016 by 12:00 PM, EST. Place of receipt of proposals remains unchanged.
ITEM B: DELETE para. III.B.(1) under Contractor Responsibilities in its entirety as issued in the RFQ (Document: DB101 / JAN 2016 (The Agreement)), and INSERT the attached revised para. III.B.(1) in lieu thereof.
III.B. Contractor Responsibilities
(1) For the purposes of FAR 52.236-1, Performance of Work by the Contractor, the Contractor shall perform at least twelve percent (12%) of the Work.
ITEM C: II.A. TECHNICAL PROPOSAL CONTENT (SOLICITATION Volume)
(TAB 1) Technical Proposal (Factor 1) Technical Approach (Factor 2) Specialized experience and technical competence (Factor 3) Past Performance of team
(TAB 2) Representations and Certifications (C301) [Document NOT included in page count]
(TAB 3) Other Documents as Required [Documents NOT included in page count]
PBS Past Performance Questionnaire, if not forwarded to attention of Contracting Officer
SF 1442, Solicitation, Offer and Award
GSA Form 527
Copy of the Joint Venture Agreement, if applicable
Proof of Registration in the System for Award Management
Proof of Bonding Capacity to $50,000,000.
ITEM D: Information: Site Visit/Pre-proposal Conference held Friday, 04/15/16
Attached for your information are the Sign-in Sheets.
The presentation given by ZGF Architects at the Site Visit/Pre-proposal Conference were documents originally uploaded at FBO.
CONTINUATION OF SF 30: AMENDMENT OF
SOLICITATION/MODIFICATION OF CONTRACT
GS11P16MMC7001
Amendment No. 2
ITEM E: NOTES SPECIFIC FOR Safeguarding and Dissemination of Sensitive But
Unclassified (SBU) Building Information
IT IS STRONGLY SUGGESTED THAT YOU READ THIS SECTION VERY
CAREFULLY.
Per RFQ Solicitation Volume:
III.I. Safeguarding Documents Designated as Sensitive But Unclassified Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
Per Section III of RFQ Agreement Volume N. 7. Safeguarding and Dissemination of Sensitive But Unclassified (SBU) Building
Information.
(b) Authorized recipients.
(i) Building information designated SBU must be protected with access strictly controlled and limited to thoseindividuals having a legitimate business need to know such information. Those with a need to know may include Federal, State and local government entities, and non-government entities engaged in the conduct of business on behalf of or with GSA. Non-government entities may include architects, engineers, consultants, contractors, subcontractors, suppliers, utilities, and others submitting an offer or bid to GSA, or performing work under a GSA contract or subcontract.Recipient contractors must be registered as “active” in the System for Award Management (SAM) database atwww.sam.gov and have a legitimate business need to know such information. If a subcontractor is not registered in the SAM and has a need to possess SBU building information, the subcontractor shall provide to the contractor its DUNS number or its tax ID number and a copy of its business license. The contractor shall keep this information related to the subcontractor for the duration of the contract and subcontract. …
ITEM F: CUP 2 – RFI LOG (04/18/2016) is hereby incorporated.
ITEM G: Offerors must acknowledge receipt of this amendment on offer form, giving number and date.
END OF AMENDMENT NO. TWO (2)
Attachment: Site Visit/Pre-proposal Conference Sign in Sheets
CUP 2 – RFI LOG (04/18/2016)
http://www.sam.gov/