Weaver_Project_-_DB-Q As_r1.docx

DOCX document 24 KB Posted

Attached to
Design-Build (DB) / Replacement of Fire Alarm System for the Housing and Urban Development located in Washington. , DC
Solicitation number
GS-11P-15-MK-C-0039
Issued by

About this file

Weaver Project - DB-RFI's - Amendment 0002

View the file

Other files

File Type Posted
Davis_Bacon_Wages_-_DC150002_-_10092015_-_DC2.docx DOCX document
SF30_-_Amendment_0007_-_Weaver_Design_Build_Services.pdf PDF
Site_Visit_-_Attendees_List_-__December_05_2015_.pdf PDF
HUD_2014_PM_.xlsx XLSX spreadsheet
Fire_alarm_program_point_list_-_HUD_Device_List_dated_1-26-2012.pdf PDF
Amendment_0006_-_Weaver_Project_-_Response_to_the_RFIs.pdf PDF
SF30_-_Amendment_0006_-_Weaver_Fire_Alarm_Project.pdf PDF
SF30_-_Amendment_0005_-_Extend_Due_Date_to_December_01_2015.pdf PDF
SF30_-_Amendment_0004_-_Extend_Due_Date_to_Nov_12_2015.pdf PDF
SF30_-_Amendment_0003.pdf PDF
SF30_-_Amenement_0002.pdf PDF
Weaver_Fire_Alarm_-_Site_Visit_Attendees_List_-_09292015.pdf PDF
DB201A_September_30_-_Solicitation-_Weaver_Fire_Alarmv-_Amendment_1.docx DOCX document
DB-September_30_-Agreement_-_Weaver_Fire_Alarm_-_Amendment_1.docx DOCX document
001-Amendment.pdf PDF
003-Firm_Performance_Questionnaire.docx DOCX document
DB-September_09_-Agreement_-_Weaver_Fire_Alarm_(3).docx DOCX document
006-HUD-SF24.pdf PDF
Weaver_-_Fire_Alarm_Project_SF1442.pdf PDF
HUD-Reps_and_Certs.docx DOCX document
001-GSA527-Contractors_Qualifications_and_Financial_Informaiton.pdf PDF
002-_Davis_Bacon_wage_rates_-_DC150002_-_09112015_-_DC20140002.docx DOCX document
004-Certificate_of_Procurement_Integrity.pdf PDF
DB201A_September_15-_Solicitation-_Weaver_Fire_Alarmv3_(1).docx DOCX document
005-Disclosure_of_Lobbying_Activities.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2 - RFI’s for the Replacement of Fire Alarm Systems for the Housing and Urban Development Solicitation Number - GS11P15MKC0039

Amendment 2 – Responses to the RFI’s

1. Contractor: Will the GSA be issuing scaled floor plans that represent the Weaver Building’s complete current physical configuration?

GSA: Basic Building Footprint Floor Plan shall be provided for the purposes of physical configuration and scale.

Fire Risk Management, Inc. provided us with the "bridging documents."

2.Contractor: Is this project “Design Build”?
GSA: Yes this is a Design Build Project.

3. Contractor: If this project is “Design Build” who is the “design professional responsible for the job” referred to in 28 31 76-1 1.1 B second sentence?

GSA: The Design-Builder will be the Designer of Record and will be the “design professional responsible for the job.”

4. Factor 1 evaluates the offeror's experience in providing similar design-buildconstruction services. Please confirm that the offeror must have been the primecontractor, and not a subcontractor, on the projects that are submitted todemonstrate successful experience.
GSA: Offeror was to have been Prime.
5.Past Performance Questionnaires (PPQs), consisting of 5 pages each, are required foreach of the three projects submitted under Factor 1 Experience in Similar Projects.Please omit the PPQs from the 50 page limit.
GSA: Past Performance Questionnaires (PPQ) NOT included in the 50 page count.
6.The RFP requires that 12 point fonts be used for the proposal submission. Will GSA allowthe offeror to use a smaller font size in tables?
GSA: Smaller font acceptable in tables and graphs; stick to 12pt in narration.
7.Will existing floor plans be issued for this project?
GSA: See Question #1
8.Please confirm that the bid package documents are a total of (20) attachments. We alsowant to confirm that the complete drawing package consists of only (4) fire alarmdrawings and no floor plans?
GSA: See Question #1
9.There were still no as-built plans. Would you please advise us where we can find them?
GSA: We do not have reliable F.A. system as-builts available for distribution, onlythe building footprint (which was provided). The project winner will be required toresearch and conduct building surveys to determine the existing fire alarm systemconfiguration.