Weaver Project - DB-RFI's - Amendment 0002
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2 - RFI’s for the Replacement of Fire Alarm Systems for the Housing and Urban Development Solicitation Number - GS11P15MKC0039
Amendment 2 – Responses to the RFI’s
1. Contractor: Will the GSA be issuing scaled floor plans that represent the Weaver Building’s complete current physical configuration?
GSA: Basic Building Footprint Floor Plan shall be provided for the purposes of physical configuration and scale.
Fire Risk Management, Inc. provided us with the "bridging documents."
| 2. | Contractor: Is this project “Design Build”? | |
| GSA: Yes this is a Design Build Project. |
3. Contractor: If this project is “Design Build” who is the “design professional responsible for the job” referred to in 28 31 76-1 1.1 B second sentence?
GSA: The Design-Builder will be the Designer of Record and will be the “design professional responsible for the job.”
| 4. Factor 1 evaluates the offeror's experience in providing similar design-build | construction services. Please confirm that the offeror must have been the prime | contractor, and not a subcontractor, on the projects that are submitted to | demonstrate successful experience. | |
| GSA: Offeror was to have been Prime. |
| 5. | Past Performance Questionnaires (PPQs), consisting of 5 pages each, are required for | each of the three projects submitted under Factor 1 Experience in Similar Projects. | Please omit the PPQs from the 50 page limit. | |
| GSA: Past Performance Questionnaires (PPQ) NOT included in the 50 page count. |
| 6. | The RFP requires that 12 point fonts be used for the proposal submission. Will GSA allow | the offeror to use a smaller font size in tables? | |
| GSA: Smaller font acceptable in tables and graphs; stick to 12pt in narration. |
| 7. | Will existing floor plans be issued for this project? | |
| GSA: See Question #1 |
| 8. | Please confirm that the bid package documents are a total of (20) attachments. We also | want to confirm that the complete drawing package consists of only (4) fire alarm | drawings and no floor plans? | |
| GSA: See Question #1 |
| 9. | There were still no as-built plans. Would you please advise us where we can find them? | ||||
| GSA: We do not have reliable F.A. system as-builts available for distribution, only | the building footprint (which was provided). The project winner will be required to | research and conduct building surveys to determine the existing fire alarm system | configuration. |