SF30_-_Amendment_0006_-_Weaver_Fire_Alarm_Project.pdf

PDF 1 MB Posted

Attached to
Design-Build (DB) / Replacement of Fire Alarm System for the Housing and Urban Development located in Washington. , DC
Solicitation number
GS-11P-15-MK-C-0039
Issued by

About this file

SF30 - Amendment 0006

View the file

Other files

File Type Posted
Davis_Bacon_Wages_-_DC150002_-_10092015_-_DC2.docx DOCX document
SF30_-_Amendment_0007_-_Weaver_Design_Build_Services.pdf PDF
Site_Visit_-_Attendees_List_-__December_05_2015_.pdf PDF
HUD_2014_PM_.xlsx XLSX spreadsheet
Fire_alarm_program_point_list_-_HUD_Device_List_dated_1-26-2012.pdf PDF
Amendment_0006_-_Weaver_Project_-_Response_to_the_RFIs.pdf PDF
SF30_-_Amendment_0005_-_Extend_Due_Date_to_December_01_2015.pdf PDF
SF30_-_Amendment_0004_-_Extend_Due_Date_to_Nov_12_2015.pdf PDF
SF30_-_Amendment_0003.pdf PDF
SF30_-_Amenement_0002.pdf PDF
Weaver_Project_-_DB-Q As_r1.docx DOCX document
Weaver_Fire_Alarm_-_Site_Visit_Attendees_List_-_09292015.pdf PDF
DB201A_September_30_-_Solicitation-_Weaver_Fire_Alarmv-_Amendment_1.docx DOCX document
DB-September_30_-Agreement_-_Weaver_Fire_Alarm_-_Amendment_1.docx DOCX document
001-Amendment.pdf PDF
003-Firm_Performance_Questionnaire.docx DOCX document
DB-September_09_-Agreement_-_Weaver_Fire_Alarm_(3).docx DOCX document
006-HUD-SF24.pdf PDF
Weaver_-_Fire_Alarm_Project_SF1442.pdf PDF
HUD-Reps_and_Certs.docx DOCX document
001-GSA527-Contractors_Qualifications_and_Financial_Informaiton.pdf PDF
002-_Davis_Bacon_wage_rates_-_DC150002_-_09112015_-_DC20140002.docx DOCX document
004-Certificate_of_Procurement_Integrity.pdf PDF
DB201A_September_15-_Solicitation-_Weaver_Fire_Alarmv3_(1).docx DOCX document
005-Disclosure_of_Lobbying_Activities.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

Continuation Page

PAGE 2 OF 3 GS-11P-15-MK-C-0039/0006

Continued from Block 14...

Please see the following updates to Amendment 0006

1. Changes to the Evaluation Factor 01 - Experience on Similar Projects to read as follows:

FACTOR 1 - Experience on Similar Projects - To read as follows:

This factor evaluates the extent of the Offeror's past experience as a firm in providing similar design-build construction services to determine the firm's experience in completing the tasks detailed in the performance work statement.

The Offeror must demonstrate successful experience as a Design-Build Contractor (DBC) responsible for the construction of three (3) similar projects involving the design and installation of an entirely new fire alarm system while maintaining an existing fire alarm system substantially completed within the last ten (10) years with a total project construction cost at award of the contract not less than $4 million. Partnerships are allowed to expand the bidders expertise.

A "similar project" is defined as a project that is comparable in nature, type and complexity as defined by the following characteristics.

* Project was performed in an occupied and functioning office building of at least 400,000 GSF;

* Project involved at least 3 of the following disciplines: architectural, electrical, fire alarm, elevator, and environmental;

* Project included requirements for noise control if work was performed in an occupied facility during operational hours. Proposal must clearly demonstrate off hours work or noise control.

2. Enclosed is the response to the RFI's.

3. Attachments include:

A. HUD Device List dated 01/26/2012 B. Preventive Maintenance Schedule

4. Site Visit Information:

Date: Saturday, December 05, 2015 Time: 10:00 AM Location: Robert C. Weaver Federal Building, Room 451 7th Street, Former Cafeteria Space Washington, DC

Attendees shall bring a valid photo I.D to enter the building passing through Security Site Visit will follow immediately after. See paragraph I.G for additional instructions.

Continuation Page

PAGE 3 OF 3 GS-11P-15-MK-C-0039/0006

(1) Pre-registration is required for all attendees to the pre-proposal conference and Site Visit. Attendance shall be limited to not more than three (3) representatives from each Design Build Team. Subcontractors are encouraged to team with a Prime prior to the conference. Individual subcontractors may register and attend the event, however only one individual will be allowed per company. Participants must have a valid, Government issued picture identification, driver's license preferred, to gain access for the pre-proposal conference and Site Visit.

(2) To register for the conference and site visit please submit the following information via e-mail no later than December 02, 2015 no later than 4:00 PM.

Each Offeror shall submit, in writing via email, to the Contract Specialist (tanuja.majety@gsa.gov), a list of attendees (maximum of 3).

Information submitted shall include the following:

* Attendee Name (First, Middle, Last)

* Solicitation Number and the Project Name

* Attendee Email

* Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)

* Company Address

* Company Phone Number

In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 12:00 Noon EST on the following date and at the following address:

Proposal Due Date: Extended to December 15, 2015.

Ms. Tanuja Majety (TJ) 301 7th Street SW, Room 2021 Washington, DC 20407

We are no longer accepting any additional RFIs to the above referenced project. If

Descript: This amendment 0006 is being distributed electronically via www.fbo.gov only. Solicitation GS-11P-15-MK-C-0039 is hereby amended making the following changes:

Project - Design Build Contract for United States Department of Housing and Urban Development - Weaver Fire Alarm Project ...See Continuation Page

Descript1:
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 3
DocNo: 0006
EffDate: NOV 19, 2015
ReqNo:
ProjNo:
IssuedByCode: WPHBA
IssuedBy: GSA/PBS/NCR Office Of Acquisition

Capital Construction Branch (WPHBA)

7TH AND D STREETS SW

WASHINGTON DC 20407

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolChg: Yes
AwdChg: Off
SolNo: GS-11P-15-MK-C-0039
SolDate: SEP 25, 2015
AwdNo:
AwdDate:
NoCopies: 1
Amended: Yes
OffrExt: Yes
OffrNoEx: Off
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
Header:
15B. CONTRACTOR/OFFEROR:
Footer1:
signature:

File details come from the government source that posted it. Updated .