GS-11P-15-DC-D-0056_Pre-Proposal_Conference_slides_(for_information_only).pdf

PDF 514 KB Posted

Attached to
Capital Solar Challenge for Rooftop Photovoltaic PPA
Solicitation number
GS-11P-15-DC-D-0056
Issued by

About this file

Slide presentation from pre-proposal conference (for info only not part of contract)

View the file

Other files

File Type Posted
GS-11P-15-DC-D-0056_Amendment_08.pdf PDF
Exhibit_3_DC-SEU_Incentive_Information_including_Agreement_(revised).pdf PDF
GS-11P-15-DC-D-0056_Sign-in_Sheets.pdf PDF
Exhibit_12_-_Solar_Challenge_RFP_Base_ _Option_Years_Rate_Calculator_(Revised).xlsx XLSX spreadsheet
GS-11P-15-DC-D-0056_RFI_Responses.pdf PDF
GS-11P-15-DC-D-0056_SCA_Wage_Determination.pdf PDF
GS-11P-15-DC-D-0056_Amendment_07.pdf PDF
GS-11P-15-DC-D-0056_Part_II_Section_I_(revised).pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_C_(revised).pdf PDF
GS-11P-15-DC-D-0056_Part_III_Section_J_and_Part_IV_Section_K_thru_M_(revised).pdf PDF
GS-11P-15-DC-D-0056_SF_1449_(revised).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_D_thru_H_(page_numbers_only).pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_A_and_B_(revised).pdf PDF
GS-11P-15-DC-D-0056_Amendment_06.pdf PDF
GS-11P-15-DC-D-0056_Amendment_05.pdf PDF
Document_Security_Agreement_(corrected).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_A_revised.pdf PDF
GS-11P-15-DC-D-0056_SF_1449_revised.pdf PDF
GS-11P-15-DC-D-0056_DOL_General_Wage_Decision.pdf PDF
GS-11P-15-DC-D-0056_Amendment_04.pdf PDF
Exhibit_9_-_Washington _DC_TMY_Weather_File_radwx_077053885_9809.tm2 —
GS-11P-15-DC-D-0056_SF_1449.pdf PDF
GS-11P-15-DC-D-0056_Amendment_01.pdf PDF
Exhibit_8_-_Section_02085-GSA_Asbestos_Abatement_Procedures-Mar_2014.pdf PDF
Document_Security_Agreement.pdf PDF
GS-11P-15-DC-D-0056_Part_IV_Sections_L_and_M_(correct_one).pdf PDF
PBS_3490.1_Document_Security.pdf PDF
Exhibit_12_-_Solar_Challenge_RFP_Base_and_Option_Years_Rate_Calculator.xlsx XLSX spreadsheet
GS-11P-15-DC-D-0056_Part_II_Section_I.pdf PDF
Exhibit_7_-_Sunspec_Alliance_Information_Models.pdf PDF
Exhibit_5_-_GSA_Fire_Safety_Guidelines_for_PV_(Oct_2009).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_D_thru_H.pdf PDF
Exhibit_3_-_DC_SEU_Incentive_Information_including_Agreement_and_Request_Forms.pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_A_and_B.pdf PDF
GS-11P-15-DC-D-0056_Part_I_Section_C.pdf PDF
Exhibit_1_-_PV_System_List.pdf PDF
GS-11P-15-DC-D-0056_Part_III_Section_J_and_Part_IV_Section_K.pdf PDF
Exhibit_6_-__Section_01546_GSA_Safety_ _Health_Specifications.pdf PDF
Exhibit_10_-_Prior_Experience.pdf PDF
GS-11P-15-DC-D-0056_Part_IV_Sections_L_and_M.pdf PDF
Exhibit_11_-_Past_Performance_Questionnaire.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Capital Solar Challenge Power Purchase Agreement (PPA)

Pre-Proposal Conference and Site Visits

RFP-GS-11P-15-DC-D-0056

September 28 – October 1, 2015

US General Services Administration Public Buildings Service National Capital Region

Agenda

• Welcome / Sign-in

• Introduction of GSA Participants

• RFP Overview

Procurement – Bonita Kenan, Contracting Officer

Technical – Ronald Allard, Program Manager

• Site Tours – Ron Allard

• Questions

RFP Overview

• Rooftop PV systems on 18 buildings in the District of Columbia under a 10 year base plus 10 year option PPA contract

• Successful offeror will be responsible for design, construction, ownership, operation and maintenance

• Monthly billing for power delivered is required.

• Design and construction phases begin upon issuance of notice to proceed

• Construction and acceptance submission of PV systems required before Nov 30, 2016 to qualify for a 30% ITC

• PPA term begins on PV system operational date

• Competitive solicitation conducted under -

- FAR Part 12 (Commercial Items)

- FAR Part 15 (Negotiated)

- FAR Subpart 16.5 (Indefinite-Delivery Contract)

- FAR Part 41 (Acquisition of Utility Services)

• Unrestricted procurement (open to both large and small business concerns)

• Acceptable subcontracting plan and annual subcontract reporting required after award (applies to large business concerns only)

• Teaming arrangements/joint ventures/special purposes entities or limited liability concerns encouraged to participate

• Single firm-fixed price IDIQ contract will be awarded

• Task orders will be issued to purchase electricity

• Monthly billing for power delivered

• Lowest priced technically acceptable (LPTA) source selection procedures are being used

• Government will select the offeror who meets the technical acceptability standards in Section L and offers the lowest price

• Government intends to award without discussions but reserves right to conduct discussions, if needed

• Evaluation factors for award include:

- Prior Experience

- Satisfaction of Customer with Past Performance

- Qualifications of Key Personnel

- Price

• Must submit price for all contract line items to be considered for award

**READ SECTION L CAREFULLY AND THOROUGHLY

BEFORE SUBMITTING YOUR PROPOSAL**

- Contains detailed instructions and required proposal submission format

• PPA price per kWH for base and option periods

– 1.5% escalation rate applies to each year

– Rate assumes system removal at end of performance period

– Base and option year rate calculator included at Exhibit 12

• Price per building for one-time relocation of PV system for roof repairs/replacement

• Price per building for non-renewal of option if 10 year option not exercised

• Liability insurance and performance bonds (for system removal) are required

• Security clearance required for all contractor and subcontract employees prior to notice to proceed HSPD-12 and agency-imposed clearances requirements apply

• Roles, responsibilities, and specific authority of CO and COR are referenced in Section G

Proposal Activity Schedule

Event Anticipated Dates

Pre-Proposal Conference September 28, 2015

Site Visits September 29th, 30th & October 1st

RFI Submission Deadline October 9, 2015

Proposal Due Date October 21, 2015

Evaluations October/November 2015

Contract award Mid to late November, 2015

Kick-Off meeting One week after award

PV construction complete By November 30, 2016 to ensure 30% ITC

Amendment will be issued following conference and site visits to include

– Correction to Design Review/Approval Table at C.10.1, milestone #1

– Update clauses and provisions in Section I and K

– Respond to all written inquiries received by Oct 9th deadline

– Copy of slide presentation from this week’s pre-proposal activities

GSA Points of Contact

• Ron Allard

– GSA Program Manager

• Bonita Kenan

– GSA Contracting Officer

– (202) 401-0659

– bonita.kenan@gsa.gov

Important: All inquiries should be directed to the Contracting Officer only at bonita.kenan@gsa.gov who will consult with the Program Manager prior to issuance of an amendment to respond.

mailto:bonita.kenan@gsa.gov mailto:bonita.kenan@gsa.gov

Questions

• Successful offeror takes advantage of the 30% federal investment tax credit, accelerated depreciation and any other tax incentives

• DC Sustainable Energy Utility (DCSEU) incentive

– 20 cents per kW installed capacity

– $600,000 maximum

• The successful offeror is responsible for scheduling design, construction and document submissions to meet all incentive requirements and deadlines

Technical Overview

• Successful offeror retains SRECs and sells them into the Washington DC SREC market

– It is expected that SREC sale proceeds will significantly reduce the PPA price.

• Government will have a 50/50 SREC revenue share in the second 10 year term of the contract (via bill credit)

• Trade Act Compliant product must include in proposal

• Responsible for utility interconnection requirements

– Meet utility design criteria

– Submit interconnection application / agreement to PEPCO / Government

– Do early – Government may have legal issues to resolve

• End of contract: remove system, restore site UNLESS there is a fair market value purchase by the Government

Agency/Building List

GSA

• Central Office – 1800 F Street

• Reagan Building

• Wilbur J. Cohen Building

HHS

• Hubert H. Humphrey Building Treasury

• Main Treasury Building

• Bureau of Engraving & Printing State

• Harry S. Truman Building

• Columbia Plaza

Smithsonian

• Museum of American

History

• Museum of Natural

History

• Museum of the American

Indian

NARA

• National Archives Navy

• Navy Yard Bldgs. 166, 169, 175, 196, 200 and 201

Site Tours

RFP-GS-11P-15-DC-D-0056

Capital Solar Challenge

September 29, 30 & October 1, 2015

• Tours start all days here at GSA Regional Office

Building (ROB) @ 7:45AM

– Room 1034, 301 7th St SW, Washington DC 20407

• Tour guides are authorized to “un-invite” anyone on the tour that does not follow all rules & directions

• Must bring government issued photo ID all three days

• Must be present for safety recap on day 1

• You are responsible for your lunch

• Three tour groups (see handouts)

• Different tour “guide” each day

• Tour van will not wait

• Do not have to return to GSA ROB following tours

• Stay with agency escorts

• Safety – walking will be required; stay away from roof edge and electrical panels

• No camera or cell phones allowed unless building site representative provides authorization

• No smoking

• Stay with group

• Do not disrupt personnel encountered during tour

• Entertain questions to:

– Correct omissions, ambiguities, or clarify requirements

– Raise possible problems (does not mean we will agree, but we will consider issues)

– Submit all questions in writing

• Nothing presented at any site visit creates a change.

• All changes made to the RFP will be done through a formal amendment posted to fbo.gov.

• Purpose of site visits is to allow opportunity to see locations and site conditions.

• No additional site visit opportunities will be accommodated.

• During site visits site specific questions only will be addressed

• All general questions needed to be emailed

• GSA will consider material that supplements solicitation – see Section L criteria

• Note deadlines in Section L

• READ SECTION L

QUESTIONS

Proceed to Safety Brief – Michael Wyatt

GSA Capitol Solar Challenge Safety Briefing

• Parking is not provided; visitors are encouraged to use public transportation to arrive at the GSA’s Regional Office Building, 301 7th Street, SW 20407, Room 1034 by 7:45 am on September 29th, 30th, and October 1st.

• GSA will drive participants to subject buildings in vans.

Location, Parking and Transportation

Dress Code

• Some unoccupied spaces in the buildings may be dusty - clothes will get dirty.

• Avoid loose clothing like dresses, ties and scarves which can get caught on equipment.

• No open toe shoes. Wear shoes suitable for walking on hazardous roof scenarios.

Cameras

• Photos may be taken only after receiving the expressed consent of the agency escort

• Cameras may be used during the Site Visit to capture still photographs only

• No video or other types of recording devices.

Walking Around

• Stay close to the escort so you can hear any instructions. Stay together- do not wander from the group.

• Be aware of tripping hazards

• Watch your head, be aware of low-hanging objects

Roof Safety

• Don’t go near edges (10 ft.) or take items where they could slide off the edge of the roof.

• Stay off steep or high roofs

• Stay off slate and tile roofs.

• Stay off roofs in wet or windy conditions.

• Keep shoes free of mud and dirt.

• Stay away from microwave antennas, which are usually marked as a hazard.

• Stay away from exhaust vents that may contain offensive or hazardous gasses

Electrical Safety

• Ensure floor and equipment is dry before entering space.

• Stay back from circuits and don’t touch electrical equipment, including with items you are carrying.

• Don’t put hands in electrical cabinets to point to items

Security Pass Through

• Be prepared to stow and retrieve personal effects efficiently

• Have government issued photo identification ready all three days

Closing Statement

We look forward to receipt of your offer and participation in this procurement

Thank you!

File details come from the government source that posted it. Updated .