Capital Solar Challenge Power Purchase Agreement (PPA)
Pre-Proposal Conference and Site Visits
RFP-GS-11P-15-DC-D-0056
September 28 – October 1, 2015
US General Services Administration Public Buildings Service National Capital Region
Agenda
• Welcome / Sign-in
• Introduction of GSA Participants
• RFP Overview
Procurement – Bonita Kenan, Contracting Officer
Technical – Ronald Allard, Program Manager
• Site Tours – Ron Allard
• Questions
RFP Overview
• Rooftop PV systems on 18 buildings in the District of Columbia under a 10 year base plus 10 year option PPA contract
• Successful offeror will be responsible for design, construction, ownership, operation and maintenance
• Monthly billing for power delivered is required.
• Design and construction phases begin upon issuance of notice to proceed
• Construction and acceptance submission of PV systems required before Nov 30, 2016 to qualify for a 30% ITC
• PPA term begins on PV system operational date
• Competitive solicitation conducted under -
- FAR Part 12 (Commercial Items)
- FAR Part 15 (Negotiated)
- FAR Subpart 16.5 (Indefinite-Delivery Contract)
- FAR Part 41 (Acquisition of Utility Services)
• Unrestricted procurement (open to both large and small business concerns)
• Acceptable subcontracting plan and annual subcontract reporting required after award (applies to large business concerns only)
• Teaming arrangements/joint ventures/special purposes entities or limited liability concerns encouraged to participate
• Single firm-fixed price IDIQ contract will be awarded
• Task orders will be issued to purchase electricity
• Monthly billing for power delivered
• Lowest priced technically acceptable (LPTA) source selection procedures are being used
• Government will select the offeror who meets the technical acceptability standards in Section L and offers the lowest price
• Government intends to award without discussions but reserves right to conduct discussions, if needed
• Evaluation factors for award include:
- Prior Experience
- Satisfaction of Customer with Past Performance
- Qualifications of Key Personnel
- Price
• Must submit price for all contract line items to be considered for award
**READ SECTION L CAREFULLY AND THOROUGHLY
BEFORE SUBMITTING YOUR PROPOSAL**
- Contains detailed instructions and required proposal submission format
• PPA price per kWH for base and option periods
– 1.5% escalation rate applies to each year
– Rate assumes system removal at end of performance period
– Base and option year rate calculator included at Exhibit 12
• Price per building for one-time relocation of PV system for roof repairs/replacement
• Price per building for non-renewal of option if 10 year option not exercised
• Liability insurance and performance bonds (for system removal) are required
• Security clearance required for all contractor and subcontract employees prior to notice to proceed HSPD-12 and agency-imposed clearances requirements apply
• Roles, responsibilities, and specific authority of CO and COR are referenced in Section G
Proposal Activity Schedule
Event Anticipated Dates
Pre-Proposal Conference September 28, 2015
Site Visits September 29th, 30th & October 1st
RFI Submission Deadline October 9, 2015
Proposal Due Date October 21, 2015
Evaluations October/November 2015
Contract award Mid to late November, 2015
Kick-Off meeting One week after award
PV construction complete By November 30, 2016 to ensure 30% ITC
Amendment will be issued following conference and site visits to include
– Correction to Design Review/Approval Table at C.10.1, milestone #1
– Update clauses and provisions in Section I and K
– Respond to all written inquiries received by Oct 9th deadline
– Copy of slide presentation from this week’s pre-proposal activities
GSA Points of Contact
• Ron Allard
– GSA Program Manager
• Bonita Kenan
– GSA Contracting Officer
– (202) 401-0659
– bonita.kenan@gsa.gov
Important: All inquiries should be directed to the Contracting Officer only at bonita.kenan@gsa.gov who will consult with the Program Manager prior to issuance of an amendment to respond.
mailto:bonita.kenan@gsa.gov mailto:bonita.kenan@gsa.gov
Questions
• Successful offeror takes advantage of the 30% federal investment tax credit, accelerated depreciation and any other tax incentives
• DC Sustainable Energy Utility (DCSEU) incentive
– 20 cents per kW installed capacity
– $600,000 maximum
• The successful offeror is responsible for scheduling design, construction and document submissions to meet all incentive requirements and deadlines
Technical Overview
• Successful offeror retains SRECs and sells them into the Washington DC SREC market
– It is expected that SREC sale proceeds will significantly reduce the PPA price.
• Government will have a 50/50 SREC revenue share in the second 10 year term of the contract (via bill credit)
• Trade Act Compliant product must include in proposal
• Responsible for utility interconnection requirements
– Meet utility design criteria
– Submit interconnection application / agreement to PEPCO / Government
– Do early – Government may have legal issues to resolve
• End of contract: remove system, restore site UNLESS there is a fair market value purchase by the Government
Agency/Building List
GSA
• Central Office – 1800 F Street
• Reagan Building
• Wilbur J. Cohen Building
HHS
• Hubert H. Humphrey Building Treasury
• Main Treasury Building
• Bureau of Engraving & Printing State
• Harry S. Truman Building
• Columbia Plaza
Smithsonian
• Museum of American
History
• Museum of Natural
History
• Museum of the American
Indian
NARA
• National Archives Navy
• Navy Yard Bldgs. 166, 169, 175, 196, 200 and 201
Site Tours
RFP-GS-11P-15-DC-D-0056
Capital Solar Challenge
September 29, 30 & October 1, 2015
• Tours start all days here at GSA Regional Office
Building (ROB) @ 7:45AM
– Room 1034, 301 7th St SW, Washington DC 20407
• Tour guides are authorized to “un-invite” anyone on the tour that does not follow all rules & directions
• Must bring government issued photo ID all three days
• Must be present for safety recap on day 1
• You are responsible for your lunch
• Three tour groups (see handouts)
• Different tour “guide” each day
• Tour van will not wait
• Do not have to return to GSA ROB following tours
• Stay with agency escorts
• Safety – walking will be required; stay away from roof edge and electrical panels
• No camera or cell phones allowed unless building site representative provides authorization
• No smoking
• Stay with group
• Do not disrupt personnel encountered during tour
• Entertain questions to:
– Correct omissions, ambiguities, or clarify requirements
– Raise possible problems (does not mean we will agree, but we will consider issues)
– Submit all questions in writing
• Nothing presented at any site visit creates a change.
• All changes made to the RFP will be done through a formal amendment posted to fbo.gov.
• Purpose of site visits is to allow opportunity to see locations and site conditions.
• No additional site visit opportunities will be accommodated.
• During site visits site specific questions only will be addressed
• All general questions needed to be emailed
• GSA will consider material that supplements solicitation – see Section L criteria
• Note deadlines in Section L
• READ SECTION L
QUESTIONS
Proceed to Safety Brief – Michael Wyatt
GSA Capitol Solar Challenge Safety Briefing
• Parking is not provided; visitors are encouraged to use public transportation to arrive at the GSA’s Regional Office Building, 301 7th Street, SW 20407, Room 1034 by 7:45 am on September 29th, 30th, and October 1st.
• GSA will drive participants to subject buildings in vans.
Location, Parking and Transportation
Dress Code
• Some unoccupied spaces in the buildings may be dusty - clothes will get dirty.
• Avoid loose clothing like dresses, ties and scarves which can get caught on equipment.
• No open toe shoes. Wear shoes suitable for walking on hazardous roof scenarios.
Cameras
• Photos may be taken only after receiving the expressed consent of the agency escort
• Cameras may be used during the Site Visit to capture still photographs only
• No video or other types of recording devices.
Walking Around
• Stay close to the escort so you can hear any instructions. Stay together- do not wander from the group.
• Be aware of tripping hazards
• Watch your head, be aware of low-hanging objects
Roof Safety
• Don’t go near edges (10 ft.) or take items where they could slide off the edge of the roof.
• Stay off steep or high roofs
• Stay off slate and tile roofs.
• Stay off roofs in wet or windy conditions.
• Keep shoes free of mud and dirt.
• Stay away from microwave antennas, which are usually marked as a hazard.
• Stay away from exhaust vents that may contain offensive or hazardous gasses
Electrical Safety
• Ensure floor and equipment is dry before entering space.
• Stay back from circuits and don’t touch electrical equipment, including with items you are carrying.
• Don’t put hands in electrical cabinets to point to items
Security Pass Through
• Be prepared to stow and retrieve personal effects efficiently
• Have government issued photo identification ready all three days
Closing Statement
We look forward to receipt of your offer and participation in this procurement