Exhibit_10_-_Prior_Experience.pdf

PDF 133 KB Posted

Attached to
Capital Solar Challenge for Rooftop Photovoltaic PPA
Solicitation number
GS-11P-15-DC-D-0056
Issued by

About this file

Prior experience form

View the file

Other files

File Type Posted
GS-11P-15-DC-D-0056_Amendment_08.pdf PDF
Exhibit_3_DC-SEU_Incentive_Information_including_Agreement_(revised).pdf PDF
GS-11P-15-DC-D-0056_Sign-in_Sheets.pdf PDF
Exhibit_12_-_Solar_Challenge_RFP_Base_ _Option_Years_Rate_Calculator_(Revised).xlsx XLSX spreadsheet
GS-11P-15-DC-D-0056_RFI_Responses.pdf PDF
GS-11P-15-DC-D-0056_SCA_Wage_Determination.pdf PDF
GS-11P-15-DC-D-0056_Amendment_07.pdf PDF
GS-11P-15-DC-D-0056_Part_II_Section_I_(revised).pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_C_(revised).pdf PDF
GS-11P-15-DC-D-0056_Part_III_Section_J_and_Part_IV_Section_K_thru_M_(revised).pdf PDF
GS-11P-15-DC-D-0056_Pre-Proposal_Conference_slides_(for_information_only).pdf PDF
GS-11P-15-DC-D-0056_SF_1449_(revised).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_D_thru_H_(page_numbers_only).pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_A_and_B_(revised).pdf PDF
GS-11P-15-DC-D-0056_Amendment_06.pdf PDF
GS-11P-15-DC-D-0056_Amendment_05.pdf PDF
Document_Security_Agreement_(corrected).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_A_revised.pdf PDF
GS-11P-15-DC-D-0056_SF_1449_revised.pdf PDF
GS-11P-15-DC-D-0056_DOL_General_Wage_Decision.pdf PDF
GS-11P-15-DC-D-0056_Amendment_04.pdf PDF
Exhibit_9_-_Washington _DC_TMY_Weather_File_radwx_077053885_9809.tm2 —
GS-11P-15-DC-D-0056_SF_1449.pdf PDF
GS-11P-15-DC-D-0056_Amendment_01.pdf PDF
Exhibit_8_-_Section_02085-GSA_Asbestos_Abatement_Procedures-Mar_2014.pdf PDF
Document_Security_Agreement.pdf PDF
GS-11P-15-DC-D-0056_Part_IV_Sections_L_and_M_(correct_one).pdf PDF
PBS_3490.1_Document_Security.pdf PDF
Exhibit_12_-_Solar_Challenge_RFP_Base_and_Option_Years_Rate_Calculator.xlsx XLSX spreadsheet
GS-11P-15-DC-D-0056_Part_II_Section_I.pdf PDF
Exhibit_7_-_Sunspec_Alliance_Information_Models.pdf PDF
Exhibit_5_-_GSA_Fire_Safety_Guidelines_for_PV_(Oct_2009).pdf PDF
GS-11P-15-DC-D-0056_Part_I_Sections_D_thru_H.pdf PDF
Exhibit_3_-_DC_SEU_Incentive_Information_including_Agreement_and_Request_Forms.pdf PDF
GS-11P-15-DC-D-0056_TOC_Part_I_Sections_A_and_B.pdf PDF
GS-11P-15-DC-D-0056_Part_I_Section_C.pdf PDF
Exhibit_1_-_PV_System_List.pdf PDF
GS-11P-15-DC-D-0056_Part_III_Section_J_and_Part_IV_Section_K.pdf PDF
Exhibit_6_-__Section_01546_GSA_Safety_ _Health_Specifications.pdf PDF
GS-11P-15-DC-D-0056_Part_IV_Sections_L_and_M.pdf PDF
Exhibit_11_-_Past_Performance_Questionnaire.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 10 – Prior Experience

1. Company name

2. Role of company in this prior experience project (prime contractor, joint venture partner, project management, engineering, procurement, construction, subcontractor, consultant or any other)

3. Project title

4. Project location (address, city, state)

5. Project contract number

6. Project size (kW or MW of rated capacity, direct current at Standard Test Conditions STC)

7. Solar project owner

8. Off-taker of solar power

9. Electric Distribution Company ( EDC) involved

10. Contract award date

11. Date of substantial completion

12. Reference information (contact name(s), title(s), role(s) in project, mailing address, phone number, email address)

13. Project description including the following items:

Who designed the PV system(s)?

Who installed the PV system(s)?

Describe monetization of the federal ITC and accelerated depreciation.

Describe the purchase of electricity by the off-taker (and for a contract term exceeding five years).

Describe how operation, maintenance and repair of installed PV system(s) is performed.

Describe establishment and/or facilitation of an interconnection agreement with the EDC.

At least one project must include description of how the historic preservation process was completed.

Was a performance bond posted for the full term of the contract?

Did the project involve multiple locations and multiple crews working simultaneously?

File details come from the government source that posted it. Updated .