AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF
1 of
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment No. 5
3. EFFECTIVE DATE
12/14/2012
REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE General Services Administration, NCR Office of Project Delivery, Contracts Division (WPC) 301 7 th & D Streets, SW, Room 2021
Washington, DC 20407 Denise Avery-Craft
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9. A. AMENDMENT OF SOLICITATION NO.
GS-11P-12-MK-C-0055
To all Offerors X
9B. DATED (SEE ITEM 11)
10/19/2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return __3__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
1. See Page 2 of the SF30 that details the changes to this solicitation.
2. The deadline for Questions on this RFP is Thursday, January 3rd, 2013 at 2:00 PM.
3. The due date for receipt of proposals has been extended. Proposals are now due no later than 3:00 PM local time, on Monday, January 14 th
, 2013 in the Bid Room 1928 at GSA/NCR/ROB, 301 7 th Street, SW, Washington, DC
20407.
4. End of Amendment No. 5
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Denise Avery-Craft, Supervisory Contract Specialist 202-205-5742 Denise.Avery-Craft@gsa.gov
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
12/14/2012
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
X
The following changes have been made to this solicitation:
1. A new CD that contains revised drawings and specs concerning the new LEED requirements has been issued (Amendment #05—dated 12/07/2012). The CD will automatically be sent to current holders of the original CD.
2. The CD also contains the OPR BOD LEED SCORECARD (dated 12/07/2012) (16 pages).
3. The CD also contains the Narrative of Changes for Amendment No. 5 (dated 12/07/2012) (6 pages).
4. Additional criteria for an evaluation subfactor has been added for Sustainability (LEEDS Certification) requirements to the project. See the Revised C201 of the RFP. Attachment 8 – Past Performance LEED Questionnaire has been added.
5. The pricing sheets in C101 of the RFP have been revised to reflect the following:
a) Pricing for a 12 month period of performance
b) Pricing for an “accelerated” 9 month period of performance
c) An option for a Glass Curved wall for both the 12 month and 9 month period of performance