About this file

Wage Determination-DC

View the file

Other files

File Type Posted
9-M-135 Mech Sch 6_21_2010.pdf PDF
62B AHU-20 31 Seq.pdf PDF
9-M-135 Mech. Sch..pdf PDF
9-M-134 Mech. Sch..pdf PDF
50 ExFans F-32 thru 44 F-56 Seq.pdf PDF
16 Cooling Tower Seq.pdf PDF
9-M-136 Mech. Sch..pdf PDF
32 VAV AHU Seq.pdf PDF
9-E-167 Electrical Schedules.pdf PDF
Attachment 1 EPA Asbestos Inventory.pdf PDF
42 AHU-24 25 Seq.pdf PDF
59 FCU Seq.pdf PDF
47 AHU-26 Kitchen Hood Seq.pdf PDF
78 AC-9 thru 11 17 18 Seq.pdf PDF
19 Cooling Plant Seq.pdf PDF
37 AHU-14 thru 21 31 Seq.pdf PDF
49 AC-15 16 Seq.pdf PDF
59A FCU Seq.pdf PDF
EPA Questions Answers GS11P-10-YA-C-0089.pdf PDF
18 Cooling Plant Seq.pdf PDF
79 Fans.pdf PDF
24 HX-3 4 HWP-1Seq.pdf PDF
69 AHU-1 thru 6 14 Seq.pdf PDF
45 AHU-27 thru 30 Seq.pdf PDF
9-E-166 Electrical Schedules.pdf PDF
77 AHU-21 thru 23 Seq.pdf PDF
73 AHU-15 thru 20 and 31.pdf PDF
48 AHU-11 thru 13 AHU-19 thru23 Seq.pdf PDF
80 ExFan F-45.pdf PDF
SF1442 —
List of Changes —
EPA Design Build SOW ReCx Report 06 01 10r3 —
List of Changes —
ARRA.8(a)_DB_Competitive_Solicitation_GS11P10YAC0089 —
ARRA.8(a)_DB_Competitive_Agreement_GS11P10YAC0089.doc DOC document
SF1442 —
REPS-CERTS —
EPA Design Build SOW ReCx Report 05 26 10r3.pdf PDF
Goals for Minorities —
sf24 —
FOB8 - Document Transmittal Form - 0089.doc DOC document
sf25 —
sf25b —
ARRA.8(a)_DB_Competitive_Solicitation_GS11P10YAC0089.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: DC100004 03/19/2010 DC4

Superseded General Decision Number: DC20080004

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010 1 03/19/2010

* ASBE0024-007 10/01/2009

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 30.43 14.43

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

* ASBE0024-008 10/01/2009

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER (REMOVAL

FROM MECHANICAL SYSTEMS,

WHICH WILL NOT BE REPLACED OR

SCRAPPED)........................$ 18.85 7.10

BRDC0001-002 05/04/2009

Rates Fringes

BRICKLAYER.......................$ 26.31 7.11

CARP0132-008 05/01/2009

Rates Fringes

CARPENTER, Including Drywall Hanging, Formsetting and Carpet/Soft Floor Laying.........$ 26.38 7.00

PILEDRIVERMAN....................$ 24.48 7.70

CARP1831-002 04/01/2009

Rates Fringes

MILLWRIGHT.......................$ 29.39 6.55

ELEC0026-016 06/01/2009

Rates Fringes

ELECTRICIAN, Including HVAC Temperature Control Installation.....................$ 37.60 12.28+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.

ELEC0026-017 09/01/2008

Rates Fringes

ELECTRICIAN: COMMUNICATION

TECHNICIAN.......................$ 24.25 3%+6.87

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

ELEV0010-001 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 37.30 20.035+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

IRON0005-005 06/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL AND

STRUCTURAL.......................$ 28.83 13.295

IRON0201-006 05/01/2009

Rates Fringes

IRONWORKER, REINFORCING..........$ 25.20 14.33

LABO0657-015 06/01/2009

Rates Fringes

LABORER: Skilled................$ 20.22 5.25

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinnig, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper, structural demolition.

MARB0002-004 05/01/2009

Rates Fringes

MARBLE/STONE MASON...............$ 32.63 12.99

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)

MARB0003-006 05/01/2009

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 26.04 9.09

MARB0003-007 05/01/2009

TERRAZZO FINISHER................$ 20.48 8.19

MARB0003-008 05/01/2009

Rates Fringes

TILE SETTER......................$ 25.29 9.09

MARB0003-009 05/01/2009

Rates Fringes

TILE FINISHER....................$ 20.48 8.19

PAIN0051-014 06/01/2008

Rates Fringes

GLAZIER

Contracts $2 million and under.......................$ 25.12 7.46 Contracts over $2 million...$ 27.84 7.46

PAIN0051-015 06/01/2009

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher............$ 24.64 7.86

PLAS0891-005 07/01/2009

Rates Fringes

PLASTERER........................$ 27.00 5.82

PLAS0891-006 05/01/2008

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.15 6.47

PLAS0891-007 07/01/2008

Rates Fringes

FIREPROOFER

Handler.....................$ 11.50 3.93 Mixer/Pump..................$ 14.00 3.93 Sprayer.....................$ 19.00 3.93

Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.

PLUM0005-008 08/01/2009

Rates Fringes

PLUMBER

Apartment Buildings over 4 stories (except hotels).....$ 22.66 9.36+a ALL Other Work..............$ 37.67 14.69+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-008 08/01/2009

Rates Fringes

PIPEFITTER, Including HVAC Pipe Installation................$ 36.87 15.47+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2009

Rates Fringes

ROOFER...........................$ 25.80 8.26

SFDC0669-002 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 30.45 16.35

SHEE0100-015 01/01/2010

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 34.04 12.76

SUDC2009-003 05/19/2009

LABORER: Common or General......$ 13.04 2.80

LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67

POINTER, CAULKER, CLEANER:

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION