(Recovery) GSA/NCR Design-Build Construction Project Funding by the Recovery Act (Markey and Weaver Building's)
Solicitation number
GS-11P-10-YAC-0054
Issued by

About this file

Technical List of Changes (Amendment 2)

View the file

Other files

File Type Posted
List of Changes - Amendment-4 —
REPS-CERTS —
sf25a —
Agreement GS-11P-10-YA-C-0054 —
sf25 —
Solicitation GS-11P-10-YA-C-0054 —
List_of_Changes_-_Amendment-3_(GS-11P-10-YA-C-0054).doc DOC document
SF1442 —
List of Changes - Amendment-2 —
Questions - Answers - Group 10.xls XLS spreadsheet
Solicitation_GS11P10YAC0054 —
Agreement_GS11P10YAC0054 —
Grp 10_Markey_HUD_SOW 3-15-10.pdf PDF
Goals for Minorities —
Questions-Answers - General.xls XLS spreadsheet
Sign In Sheet 3.pdf PDF
3-8-10 Pre-Proposal Meeting Presentation FINAL.ppt PPT presentation
Sign In Sheet 1.pdf PDF
List of Changes —
Sign In Sheet 2.pdf PDF
Sign In Sheet 4.pdf PDF
ARRA.8(a) DB Competitive Solicitation GS11P10YAC0054.doc DOC document
WD-DC.doc DOC document
Group 10 - Markey Roof _Weaver Roof_ DB SOW rev 2-20-10.pdf PDF
ARRA.8(a) DB Competitive Agreement GS11P10YAC0054.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No.2 - Supplement to the Contract Documents

Date of Issue March 15, 2010

Howard T. Markey National Courts Building Sol No. GS-11P-10-YA-C-0054

NOTICE: This Amendment is issued by the Architect to all known individuals, firms or corporations who have obtained or received Bid Documents and Contract Documents on the project listed above. Bidders are required to acknowledge their receipt of this Amendment in the appropriate space on the Bid Form. The following Amendment information shall become an integral part of the Contract Documents. This information shall modify, adjust, clarify, and/or add requirements to the Contract Documents.

Contents of Amendment:

Modifications to the RFP Specifications Modifications to the Drawings

Modifications to the RFP Specifications: Volume I

Item Number

Section Number

Description

AD2-01 Cover Sheet

Add Project number PCN-SDCO3012 Add Solicitation number GS-11-P-10-YA-C-0054

AD2-02 Section 2 No. 8.1

Delete 8.1 and substitute GSA issued "Fire Protection Engineering Policy, Locating Asphalt Kettles on Roofs" dated 8/20/03 attached.

Modifications to the RFP Specifications: Volume II

AD2-03 TOC Delete Specification Section 01260 "Options" from the TOC.

AD2-04 Vol. II

Exhibit

Add Exhibit 5 Guidelines for Photovoltaic System Installations" issued by Office of Energy and Environment dated October 9, 2009.

AD2-05 Vol II Exhibit 6

Add new Exhibit 6 titled "Fire Protection Engineering Policy, Locating Asphalt Kettles on Roofs".

Modifications to the RFP Drawings:

AD2-06 Vol II Exhibit 1

Replace drawing of roof with new Exhibit 1 illustrating two connecting corridors with the attached "D. Existing Roof'.

AMENDMENT HOWARD T. MARKEY NATIONAL Page 2

NO.2 COURTS BUILDING

Sol. # GS-11P-10-YA-C-0054

Amendment No.2 - Supplement to the Contract Documents

Date of Issue March 15, 2010

Robert Weaver (HUD) Building Sol No. GS-11P-10-YA-C-0054

NOTICE: This Amendment is issued by the Architect to all known individuals, firms or corporations who have obtained or received Bid Documents and Contract Documents on the project listed above. Bidders are required to acknowledge their receipt of this Amendment in the appropriate space on the Bid Form. The following Amendment information shall become an integral part of the Contract Documents. This information shall modify, adjust, clarify, and/or add requirements to the Contract Documents.

Contents of Amendment:

Modifications to the RFP Specifications Modifications to the Drawings

Modifications to the RFP Specifications: Volume I

Item Number

Section Number

Description

AD2-01 Cover Sheet

Add Project number PCN-SDCO3020 Add Solicitation number GS-11-P-10-YA-C-0054

AD2-02 Section 2 No. 8.1

Delete 8.1 and substitute GSA issued "Fire Protection Engineering Policy, Locating Asphalt Kettles on Roofs" dated 8/20/03 attached.

AD2-03 Section 3 No. 5.2

"Coordination of Construction Work" Add the following to the last sentence of paragraph 5.2 "HUD has contracted with Honeywell to install a GreenRoof, canopy mounted PV panels over the Observation Desk and PV panels on a portion of the South main roof. Design Builder must coordinate with that work." See graphic titled -HUD Headquarters Roof Mounted Equipment by Honeywell" at the end of Volume I and as Exhibit 5 in Volume II.

Modifications to the RFP Specifications: Volume II

AD2-04 Section 01100, para. 1.3

Add the following 1.3 B "Coordination of Construction Work" Add the following to the last sentence of paragraph 5.2 "HUD has contracted with Honeywell to install a Green Roof, canopy mounted PV panels over the Observation Desk and PV panels on a portion of the South main roof.

Design Builder must coordinate with that work." See graphic titled "HUD Headquarters Roof Mounted Equipment by Honeywell" at the end of Volume I and as Exhibit 5 in Volume II.

AD2-05 Section 01260

Delete Specification "Options"

AD2-06 Exhibit

Add Exhibit 5 "Guidelines for Photovoltaic System Installations" issued by Office of Energy and Environment dated October 9. 2009.

AD2-07 Exhibit

Add Exhibit 6 "HUD Headquarters Roof Mounted Equipment by Honeywell"

AD2-08 Exhibit

Add Exhibit 7 'Fire Protection Engineering Policy, Locating Asphalt Kettles on Roofs" dated 8/20/03 attached.

AMENDMENT NO.2 ROBERT WEAVER (HUD) Page 2

BUILDING

Sol. # GS-11P-10-YA-C-0054

Markey National Courts Complete Amendment 2.pdf
Robert Weaver (HUD) Bldg. Complete Amendment 1.pdf