Group 2 - 12 Mar 10
| Group/Solicitation No. | Question | Answer |
| Group 2 -0048 | Is there a specific form required for the Bid Guarantee? Standard Form 24 was not provided | Bid Guarantee form SF24 has been issued by ammendment. |
| Group 2 -0048 | In reference to Section I.B of the Solicitation, is a signature required on The Agreement? | Yes |
| Group 2 -0048 | In reference to Section II.A.5 of the Solicitation, Other Documents as required, are there other documents required not available on the website? | Additional drawings/documents may be available for GSA facilities and may be viewed at the Technical Resource Center (Library) in room 2021 of GSA's Regional Office Building at 301 7th Street, SW, Washington, DC. Photocopies or prints of SBU documents may be made and taken away provided proper protocol for secure custody is followed. For most efficient service, appointments are advised. Contact the Contract Specialist if you would like to make an appointment and mention which building you are interested in. CADD files of building floor plans will be provided to the successful offeror following issuance of Notice To Proceed. |
| Group 2 -0048 | Do the Document Security forms for SBU information need to be submitted? | Yes |
| Group 2 -0048 | Is there a bid form being provided? | Bid Forms have been modified where required and have been included by Addendum |
| Group 2 -0048 | Is the GSA providing a bid schedule? | See the Solicitation |
| Group 2 -0048 | Are there Liquidated Damages? If so, what are they? | Group 2 - Liquidated Damages are $885 per day. |
| Group 2 -0048 | Are there completed CAD drawings of existing conditions available? | CADD Files of Floor Plans will be provided to the succesful offeror. |
| Group 2 -0048 | If there are no CAD drawings, is a full building survey required? | CADD Files of Floor Plans will be provided to the succesful offeror. |
| Group 2 -0048 | Is there a comprehensive hazardous material report available for review prior to bid? | NO |
| Group 2 -0048 | Please clarify all LEED requirements. | See the Solicitation Amendment Number 1 |
| Group 2 -0048 | Please clarify if the contractor will be responsible for temporary utility charges. | There will be no utility charges for work conducted within the facility using accepted tools and methods. |
| Group 2 -0048 | Will GSA be hiring a 3rd party commissioning agent? | GSA intends to employ an independent commissioning agent. |
| Group 2 -0048 | Please clarify Escort requirements and confirm if the government will be providing the Escorts if required at no cost to Contractor. | Escorts are required.Escorts will be provided by the Government at no cost to the contractor. |
| Group 2 -0048 | Please provide page 366 of Amendment I- Task II. | Refer to the solicitation. |
| Group 2 -0048 | Is there a requirement for Photovoltaic for Amendment 1? | Refer to the solicitation, the intent of the amendment is to emphasise that there is a Photovoltaic requirement. |
| Group 2 -0048 | In reference to Scope of Work page 4 of 18, item 6.8 Task 7, in order to meet the GSA Blast Requirements do you anticipate removal of all existing windows and installation of structural subframes, and reinstallation of the original windows with interior p | Removal of existing windows is not anticipated. New windows shall be installed on the interior side in a "Blast-Storm" configuration so as to optimize thermal efficiency while protecting occupants in accordance with applicable GSA requirements. |
| Group 2 -0048 | Given that the majority of the SBU release forms were posted 3/5/10 (3 business days), could you please consider extended the RFI cutoff date? | The ARRA Program Team has been charged to expedite the delivery of these projects. The Proposal Deadlines will remain as stated in the Solicitations. |
| Group 2 -0048 | Please provide as-built information. | Additional drawings/documents may be available for GSA facilities and may be viewed at the Technical Resource Center (Library) in room 2021 of GSA's Regional Office Building at 301 7th Street, SW, Washington, DC. Photocopies or prints of SBU documents may be made and taken away provided proper protocol for secure custody is followed. For most efficient service, appointments are advised. Contact the Contract Specialist if you would like to make an appointment and mention which building you are interested in. CADD files of building floor plans will be provided to the successful offeror following issuance of Notice To Proceed. |
| Group 2 -0048 | The SOW includes an energy analysis, giving AHU sizes. Please confirm the actual AHU sizes will be as determined by the design build team's load analysis and 100% design. | Yes |
| Group 2 -0048 | The Site Investigation escort costs are required to be paid for by the contractor. How much does an escort cost per hour? | Escorts are required. Escorts will be provided by the Government at no cost to the contractor. |
| Group 2 -0048 | Site Investigation is all escorted work. Does construction work also require 100% escorts? | Yes |
| Group 2 -0048 | Is the ceiling space sufficient to fit new equipment above existing space? | The design must fit the existing space. |
| Group 2 -0048 | What is the floor-to-floor height of the building? The ceiling height and the depth of the structure? | See drawings provided in this Amendment |
| Group 2 -0048 | Section 1140 Paragraphs 1.3 and 1.4 "Gov't Occupancy" and "Working Hours" are somewhat contradictory. Does the GSA anticipate that areas of the building will be shut down and the construction will be phased? Does the GSA anticipate that all work will be accomplished after working hours. | Building is occupied, work will be accomplished after working hours. |
| Group 2 -0048 | In reference to Scope of Work page 4 of 18, item 6.8 Task 7, in order to meet the GSA Blast Requirements do you anticipate removal of all existing windows and installation of structural subframes, and reinstallation of the original windows with interior | Removal of existing windows is not anticipated. New windows shall be installed on the interior side in a "Blast-Storm" configuration so as to optimize thermal efficiency while protecting occupants in accordance with applicable GSA requirements. |
| Group 2 -0048, Group 4 -0049, Group 5 -0046, Group 7 -0044, Group 9 -0053 | Request for Construction Documents/Document Security Notices were provided for all of the above referenced projects to obtain documents via CD, however as of yesterday they were not available. When will these CDs be available for pickup? | Group 1 - CD was available 8 March. Group 3 - CD is available 12 March at Noon, Group 5 - CD is available 12 March at Noon, No CDs are being provided for Groups 2, 4, 8, 9, and 10. See Solicitaions and Addemdums for additional information. |