About this file

Davis Bacon Wage Decision

View the file

Other files

File Type Posted
Amend04 SF30.doc DOC document
Amendment 03 Documents.doc DOC document
Amendment 02 Documents.docx DOCX document
GC Reference n ATTACHMENT 11.docx DOCX document
Attendee's Tunnels.pdf PDF
Amend01 SF30.doc DOC document
NDA.doc DOC document
GC Agreement.doc DOC document
SF1442 07192010.doc DOC document
Form SF LLLA.pdf PDF
Solicitation.doc DOC document
SF 24.pdf PDF
GSA 527 exp 7.31.12.pdf PDF
Form SF LLL.pdf PDF
Pricing Sheet to 1442 ATTACHMENT A.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DECISION: DC20100001 06/11/2010 DC1

Date: June 11, 2010 General Decision Number: DC20100001 06/11/2010

Superseded General Decision Number: DC20080001

State: District of Columbia

Construction Types: Heavy (Heavy and Sewer and Water Line) and Highway

County: District of Columbia Statewide.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines);

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 04/23/2010 3 05/07/2010 4 06/11/2010

ASBE0024-001 10/01/2009

Rates Fringes

Asbestos Worker/Heat and Frost Insulator Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 30.43 14.43

ASBE0024-002 10/01/2009

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 18.85 7.10

ASBE0024-005 10/01/2009

Rates Fringes

Fire Stop Technician.............$ 24.10 6.94

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

BOIL0193-001 10/01/2009

Rates Fringes

Boilermakers:....................$ 37.66 16.36

BRDC0001-001 05/04/2009

Rates Fringes

Bricklayer......................$ 26.31 7.11

BRMD0001-004 04/28/2009

Rates Fringes

BRICKLAYER

Refractory (Firebrick)......$ 33.65 7.11

* CARP0132-001 05/01/2010

Rates Fringes

Carpenter/Lather.................$ 26.38 7.00 Piledriver.......................$ 24.48 7.80

CARP1831-001 04/01/2009

Rates Fringes

Carpenters:

Millwrights.................$ 29.39 6.55

CARP2311-002 05/01/2009

Rates Fringes

DIVER TENDER.....................$ 24.48 7.80

DIVER............................$ 36.13 7.80

* ELEC0026-001 06/01/2010

Rates Fringes

Electricians.....................$ 39.02 12.82+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.

ELEC0026-008 07/01/2003

Rates Fringes

Motor Repairmen Removal and reinstallation of electrical motors........$ 23.69 7.73+3%+a

a. PAID HOLIDAYS:

New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July,Labor Day, Veterans Day,Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.

ELEC0070-001 05/04/2009

Rates Fringes

Line Construction:

Cable Splicers..............$ 30.06 18.75%+4.75 Equipment Mechanic..........$ 21.82 19.75%+4.81 Equipment Operators.........$ 30.06 18.75%+4.75 Groundman/Truck Driver......$ 15.34 19.75%+4.81 Line Truck with Auger.......$ 20.09 19.75%+4.81 Linemen.....................$ 30.06 18.75%+4.75

ENGI0077-001 05/01/2010

Rates Fringes

Power equipment operators:

(HEAVY AND HIGHWAY

CONSTRUCTION)

GROUP 1.....................$ 32.09 7.87+a+b GROUP 2.....................$ 31.09 7.87+a+b GROUP 3.....................$ 30.63 7.87+a GROUP 4.....................$ 29.92 7.87+a GROUP 5.....................$ 27.89 7.87+a GROUP 6.....................$ 23.35 7.87+a GROUP 7.....................$ 32.46 7.87+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Tower Cranes and Cranes 100 ton and over.

GROUP 2: 35 ton cranes & above, tower & climbing cranes, derricks, concrete boom pump, drill rigs (equivalent to L & Double L), mole.

GROUP 3: Backhoes, cableways, cranes, cherry pickers, elevating graders, hoists, paving mixers, power shovels,tunnel shovels. batch plants, shields, tunnel mining machines, gradalls, front end loaders, 3 1/2 cu.

yds. and above, power driven wheel scoops and scrapers (50

cu. yds. struck capacity or above), rail tamper, draglines, boomcat, mucking machines, graders in tunnels, pile driving engines.

GROUP 4: Front end loaders below 3 1/2 cu. yds, boom trucks, hydraulic backhoes 1/2 yds. capacity or below rubber or track mounted, tug boats, power driven wheel scoops & scrapers, blade graders, motor graders, bulldozers, trenching machines, concrete mixer, speed swing pettibone, ballast regulator, concrete pump, mechanic, welder, mechanic welder, shotcrete machines, Hoeram, locomotive (standard, narrow gauge), tuggers.

GROUP 5: High lifts above 10 feet, boilers (skelton), asphalt spreaders, bullfloat finishing machines, concrete finishing machines, concrete spreaders, fine graders, air compressors, welding machines, pumps, generators, well points, deep wells, hydraulic pumps, elevators, freeze uniits, tunnel motorman or dinky operator, roller, conveyors, well drilling machines, grout pump, fireman.

GROUP 6: Fork lifts, ditch witch, bobcat 1/3 cu. yd. and below, space heaters, sweepers, assistant engineers, oilers.

GROUP 7: Master mechanic.

a. PAID HOLIDAYS: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

b. PREMIUM PAY:

Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.

* ENGI0077-002 06/01/2010

Rates Fringes

Power equipment operators:

(PAVING AND INCIDENTAL

GRADING)

GROUP 1.....................$ 25.29 6.30

GROUP 2.....................$ 22.40 6.30

GROUP 3.....................$ 19.24 6.30

GROUP 4.....................$ 17.40 6.30

GROUP 5.....................$ 25.88 6.10

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Gradall operator, Crane.

GROUP 2: Boom Truck, Milling Machine, Excavator, Rubber Tire Backhoe, Asphalt Paver, Asphalt Plant Engineer, Motor Grader, Track Loader, Rubber Tire Loader, Track Dozer, Concrete Paver.

GROUP 3: Broom Truck, Asphalt Roller.

GROUP 4: Air Compressor, Grade Rollers.

GROUP 5: Mechanic.

ENGI0077-003 07/01/2009

Rates Fringes

Power equipment operators:

(SEWER, GAS AND WATER LINE

CONSTRUCTION)

GROUP 1.....................$ 22.48 6.12+a GROUP 2.....................$ 22.08 6.12+a GROUP 3.....................$ 21.57 6.12+a GROUP 4.....................$ 21.25 6.12+a GROUP 5.....................$ 20.43 6.12+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Excavators, Cranes, Gradalls.

GROUP 2: Backhoes, Front-end Loaders, Fork alift/Lull, Bulldozers, Motor Graders. Qualified Mechanics, Hydraulic Tamper and Hoe Pack, Paving Mixers, Pile Driving Engines, Batch Plant, Concrete Pumps, Low-Boy Driver, Lube Truck.

GROUP 3: Trenching Machine, Well Drilling Machines, Concrete Mixers, Motor Graders, Truck Driver.

GROUP 4. Roller, Air Compressors, Pumps, Welding Machines, Well Points, Firemen.

GROUP 5: Oiler a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Washington's Birthday, Decoration Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day and Martin Luther King's Birthday.

IRON0005-001 06/01/2009

Rates Fringes

Ironworkers:

Structural, Ornamental and Chain Link Fence............$ 28.83 13.295

IRON0201-001 05/01/2009

Rates Fringes

Ironworkers:

Reinforcing.................$ 25.20 14.33

LABO0657-003 06/01/2009

Rates Fringes

Laborers: (HEAVY AND HIGHWAY

AND SEWER & WATER LINES

CONSTRUCTION)

GROUP 1.....................$ 21.11 5.25

GROUP 2.....................$ 21.43 5.25

GROUP 3.....................$ 21.60 5.25

GROUP 4.....................$ 21.77 5.25

GROUP 5.....................$ 22.22 5.25

GROUP 6.....................$ 22.78 5.25

GROUP 7.....................$ 23.33 5.25

GROUP 8.....................$ 24.06 5.25

LABORERS CLASSIFICATIONS:

GROUP 1: Carloaders, choker setter, concrete crewman, crushed feeder, demolition laborers, including salvaging all material, loading, cleaning up, wrecking, dumpmen, flagmen, fence erector and installer (other than chain link), including installation and erection of fence, guard rails, medial rails, reference posts, guide posts and right-of-way markers, form strippers, general laborers, railroad track laborers, riprap man, scale man, stake jumper, structure mover, includes foundation, separation, preparation, cribbing, shoring, jacking and unloading of structures, water nozzleman, timber bucker and faller, truck loader, water boys, tool room men.

GROUP 2: Combined air and water nozzleman, cement handler, dope pot fireman (nonmechanical), form cleaning machine, mechanical railroad equipment (includes spiker, puller, tile cleaner, tamper, pipe wrapper, power driven wheelbarrows, operators of hand derricks, towmasters, scootcretes, buggymobiles and similar equipment), tamper or rammer operator, trestle scaffold builders over one tier high, power tool operator (gas, electric or pneumatic), sandblast or gunnite tailhose man, scaffold erector, (steel or wood), vibrator operator (up to 4 feet), asphalt cutter, mortar men, shorer and lagger, creosote material handler, corrosive enamel or equl, paver breaker and jackhammer operators.

GROUP 3: Multi-section pipe layer, non-metallic clay and concrete pipe layer (including caulker, collarman, jointer, rigger and jacker, thermal welder and corrugated metal culvert pipe layer.

GROUP 4: Asphalt block pneumatic cutter, asphalt roller, walker, chainsaw operator with attachment, concrete saw (walking), high scalers, jackhammer operator (using over 6 feet of steel), vibrator operator (4 feet and over), well point installer, air trac operator.

GROUP 5: Asphalt screeder, big drills, cut of the hole drills (1 1/2 " piston or larger), down the hole drills (3 1/2" piston or larger) gunnite or sandblaster nozzleman, asphalt raker, asphalt tamper, form setter, demolition torch operator, shotcrete nozzlemen and potman.

GROUP 6: Powderman, master form setters.

GROUP 7: Brick paver (asphalt block paver, asphalt block sawman, asphalt block grinder, hastings block or similar type)

GROUP 8: Licensed powdermen.

LABO0657-004 06/01/2009

Rates Fringes

Laborers: (HAZARDOUS WASTE

REMOVAL, EXCEPT ON MECHANICAL

SYSTEMS:

Preparation for, removing and encapsulation of hazardous materials from non-mechanical systems) Skilled Asbestos Abatement Laborers....................$ 17.45 5.25 Skilled Toxic and Hazardous Waste Removal Laborers....................$ 20.46 5.25

LABO0657-005 06/01/2009

Rates Fringes

Laborers: (TUNNEL, RAISE &

SHAFT (FREE AIR)

FOR HEAVY AND SEWER & WATER

LINES CONSTRUCTION)

GROUP 1.....................$ 21.84 5.25

GROUP 2.....................$ 22.50 5.25

GROUP 3.....................$ 24.18 5.25

GROUP 4.....................$ 24.89 5.25

LABORERS CLASSIFICATIONS:

GROUP 1: Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man.

GROUP 2: Chuck Tender, Powdermen in Prime House, Form Setters and Movers, Nippers, Cableman, Houseman, Groutman, Bell or Signalman, Top or Bottom Vibrator Operator.

GROUP 3: Miners, Re-Bar Underground, Concrete or Gunnite Nozzlemen, Powdermen, Timbermen and Re-Timbermen, Wood Steel Including Liner plate or Other Support, Material Motorman, Caulkers, Diamond Drill Operators, Riggers, Cement Finishers- Underground, Welders and Burners, Shield Driver, Air Trac Operator, Shotcrete Nozzlemen and Potman.

GROUP 4: Mucking Machine Operator (Air).

LABO0657-006 06/01/2009

Rates Fringes

Laborers: (TUNNEL, RAISE AND

SHAFT (COMPRESSED AIR) FOR

HEAVY CONSTRUCTION ONLY

Gauge Pressure Work Period (Pounds) (Hours) 1-14 7...........$ 27.66 5.25 14-18 6............$ 32.55 5.25

FOOTNOTE: On any requirement for air pressure in excess of 18 PSI, work periods and rates should be negotiated at a pre-bid conference.

LABO0657-007 06/01/2007

Rates Fringes

Laborers: (PAVING AND

INCIDENTAL GRADING)

Asphalt Raker & Concrete Saw Operator................$ 17.14 4.30 Asphalt Shoveler............$ 16.59 4.30 Asphalt Tammer & Concrete Shoveler....................$ 16.84 4.30 Jack Hammer.................$ 17.03 4.30 Laborer.....................$ 16.48 4.30 Sand Setter & Form Setter...$ 17.76 4.30

LABO0657-008 06/01/2009

Rates Fringes

LABORERS (BRICK MASONRY WORK)

Mason Tenders...............$ 15.06 5.25 Scaffold Builders, Mortarmen...................$ 15.90 5.25

MARB0002-003 05/01/2009

Rates Fringes

Marble & Stone Mason Includes Pointing, Caulking and Cleaning of All Types of Masonry, Brick, Stone and Cement Structures..................$ 32.63 12.99

MARB0003-001 05/01/2009

Rates Fringes

Mosaic & Terrazzo Worker, Tile Layer Marble Mason and Tile Layer.$ 25.29 9.09 Terrazzo Worker.............$ 26.04 9.09

MARB0003-004 05/01/2009

Rates Fringes

Marble, Tile & Terrazzo Finisher.........................$ 20.48 8.19

PAIN0051-001 06/01/2009

Rates Fringes

Painters:

All Industrial Work.........$ 26.68 7.86 Bridges, Heavy Highway, Lead Abatement and Flame/Thermal Spray.........$ 30.32 7.86 Commercial and Mold Remediation, Painters, Wallcovers and Drywall Finishers...................$ 24.64 7.86 Metal Polishing and Refinishing.................$ 25.64 7.86

PLAS0891-001 05/01/2008

Rates Fringes

Cement Masons:

HEAVY CONSTRUCTION ONLY.....$ 27.15 6.47

PLAS0891-002 06/01/2007

Rates Fringes

Cement Masons: (PAVING &

INCIDENTAL GRADING)

Cement Masons...............$ 17.35 4.35 Concrete Saw Operators......$ 17.35 4.35 Form Setters................$ 17.35 4.35

PLUM0005-001 08/01/2009

Rates Fringes

Plumbers.........................$ 37.67 14.69+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-005 08/01/2009

Rates Fringes

Steamfitter, Refrigeration & Air Conditioning Mechanic........$ 36.87 15.47+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

SHEE0100-001 01/01/2010

Rates Fringes

Sheet Metal Worker...............$ 34.04 12.76

* TEAM0639-001 06/01/2010

Rates Fringes

Truck drivers: (HEAVY &

HIGHWAY CONSTRUCTION)

Tractor trailer, Low Boy....$ 20.50 2.00+a Truck Drivers...............$ 18.50 2.00+a

a. VACATION: Employees will receive one (1) week's paid vacation after one (1) year of service.

TEAM0639-005 06/01/2009

Rates Fringes

Truck drivers: (PAVING &

INCIDENTAL GRADING)

All paving projects where the grading is incidental to the paving...............$ 18.00 4.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION