Statement_of_Work.pdf

PDF 170 KB Posted

Attached to
Heating fuel delivered to Port Angeles, WA
Solicitation number
GS-10P-15-LT-P-0011
Issued by

About this file

Statement of Work (SOW)

View the file

Other files

File Type Posted
Wage_Determination.pdf PDF
RFQ_2015_01_26.pdf PDF
1449_2015_01_29.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Services Administration (GSA) Heating Fuel Supply Project

Port Angeles, WA

Statement of Work 01/29/2015 – Heating Fuel Supply

STATEMENT OF WORK

1.0 GENERAL INFORMATION.

This statement of wok (SOW) defines the government’s specifications and the scope of work to be accomplished.

Project Name: Port Angeles Heating Fuel Supply

Project Address: Port Angeles Federal Bldg.

138 West First Street

Port Angeles, WA. 98362-2600

1.1 OBJECTIVES.

To supply and deliver diesel heating fuel as needed to the Port Angeles Federal Building.

1.2 PERIOD OF PERFORMANCE.

This award will be a “as needed” to deliver diesel (off road) heating fuel to the building for a base period of on/or about 15 February 2015 through 30 September 2015 plus four one-year option periods ending 30 September 2019; if exercised.

2.0 SCOPE OF WORK.

The Contractor is to provide all necessary, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for the delivery and filling of the 2,500 gallon underground storage tank. Work and materials shall comply with this SOW and the codes and regulations, editions of all applicable criteria, latest State and local regulations, guidelines and codes for the delivery, installation of the off road heating fuel into the underground storage tank.

The Contractor will:

1. As heating fuel is needed, the Contracting Officer’s Representative (COR) and/or the Contracting Officer (CO) will contact the Contractor and request a heating fuel delivery.

2. The Contractor will deliver the amount of fuel requested within 3 standard working days.

3. The Contractor will clean up any and all spilled fuel and overage in the Fill Sump.

4. The Contractor will recycle all materials not reused.

5. Work is to be performed during business hours, Monday through Friday, between the hours of 7:30 AM and 1:00 PM.

3.0 GENERAL INSTALLATION.

The Contractor will be responsible for providing all necessary parts, pieces, and tools

General Services Administration (GSA) Heating Fuel Supply Project

Port Angeles, WA

Statement of Work 01/29/2015 – Heating Fuel Supply necessary for filling the heating fuel tank. The Contractor will meet or exceed all applicable state, city, and federal building codes.

The finished work shall be suitable in every respect for a commercial business operation.

The Contractor is responsible for all permits and licenses (when applicable). The Contractor will provide all supervision required to complete the project.

4.0 WORK REQUIREMENTS.

To supply and deliver diesel heating fuel as needed to the Port Angeles Federal Building.

5.0 COORDINATION OF WORK.

All coordination of work and any potential utility disruptions shall be coordinated with the COR and the Building Custodial/Limited Maintenance Contractor prior to making the delivery.

6.0 PAINTING, PATCHING, AND CLEANUP.

The Fuel supply Contractor will clean up any and all spilled fuel and overage in the Fill Sump and in the delivery area.

107.0 FINAL ACCEPTANCE TESTING.

All documentation and required submissions must be complete and provided to the COR during the final walk through inspection.

8.0 SECURITY CLEARANCES.

Not required in the delivery of this contract.

(End of Statement of Work)

File details come from the government source that posted it. Updated .