GS09P08KSD0044-QASP.DOC
DOC document 427 KB Posted
- Attached to
- Operation and Maintenance Services
- Solicitation number
- GS-09P-08-KSD-0044
About this file
O M Services QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GS09P08KSD0044-Amend 2 Q A.doc | DOC document | |
| GS09P08KSD0044-Amendment 2.pdf | ||
| GS09P08KSD0044-Amendment 1.pdf | ||
| GS09P08KSD0044.doc | DOC document | |
| GS09P08KSD0044.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPERATIONS AND MAINTENANCE
Phillip Burton Federal Building
April 3, 2008
PRELIMINARY QUALITY ASSURANCE SURVEILLANCE PLAN
GS-09P-08-KSD-0044, O&M, PHILLIP BURTON FB & USCH
This plan mirrors the specification. Text in red is QASP test. This document is non-contractual, and outlnes GSA's quality assurance standards and procedures. GSA may modify these standards and procedures at its sole discretion. Not all provisions have QASP guidance at this time: such guidance may be added; otherwise GSA personnel should use a reasonableness standard as to whether the contractor's performance is satisfactory.
GSA's overall assessment whether performance of the contract is satisfactory should be based on a reasonable assessment whether specific requirements are being met satisfactorily. A small number of one-time failures to perform individual requirements in a satisfactory manner may still leave the contract overall rated as satisfactory or better; GSA personnel should balance all aspects of performance to assess overall performance.
QASP: General Program:
The Quality Assurance Program consists of the following elements:
1. Routine inspections performed by GSA Field Office personnel. This program needs to be refined per field office in accordance with staffing and skills available.
2. Periodic inspections performed by an outside third-party inspector (a contractor subject to conflict of interest review), at frequencies of roughly twice to six times annually. Inspection frequency will vary depending on size, complexity, location, and history of problems of the facility.
3. MARS O&M program reviews, bi-annually.
4. Acquisition and review of equipment and work order data in the CMMS.
5. Review of technical data using GEMnet performance monitors, generally established in the HVAC Operations Manual or other engineering documents.
6. Use of diagnostics applications, such as PACRAT and VPACC, and review of work orders created by such applications.
The preferred method of compelling performance is rejection of the Contractor’s monthly invoice until all work is completed satisfactorily. This provides substantial motivation to complete work. Termination for Default should be pursued where performance failure is systemic, and in particular where it appears the Contractor is probably unable or unwilling to correct performance. Performance deductions may be taken in lieu of invoice rejection, but these are somewhat disfavored (other than the specific deductions specified along with incentives) because (1) GSA’s usual objective is to have work accomplished; (2) there is significant administrative burden associated with performance deductions.
Table of Contents
5B.
THE SCHEDULE
B.1.
DESCRIPTION OF SERVICES
B.2.
OPTION periods B.3.
service contract act assumptions B.4.
ORDERING LIMITATIONS
B.5.
Automatic Price Adjustment for Minor Inventory Changes B.5.1.
Inventory Changes B.5.2.
Cumulative Adjustment B.6.
price adjustment for equipment upgrades B.7.
responsibility for assessing the facility B.8.
PRICE SCHEDULE
C.
PERFORMANCE WORK STATEMENT
C.1.
GENERAL SCOPE OF WORK
C.2.
REFERENCES
C.3.
definitions C.3.1.
Acceptance C.3.2.
Approval C.3.3.
Architectural and Structural C.3.4.
Basic Services C.3.5.
Building Automation System (BAS) C.3.6.
Building Operating Plan C.3.7.
Computerized Maintenance Management System (CMMS) C.3.8.
Consumable C.3.9.
Contractor C.3.10.
Controls/Control System C.3.11.
Electrical C.3.12.
Elevator C.3.13.
Emergency Callback C.3.14.
Fire Protection Systems C.3.15.
Furnishings C.3.16.
Heating, Ventilation and Air-Conditioning (HVAC) C.3.17.
HVAC Operations Manual C.3.18.
Landscape Irrigation Systems C.3.19.
Mechanical C.3.20.
Monthly Progress Report C.3.21.
Normal Working Hours C.3.22.
Operational Efficiency Upgrade C.3.23.
Operations C.3.24.
Predictive Maintenance C.3.25.
Preventive Maintenance C.3.26.
Repair C.3.27.
Security Systems C.3.28.
Sequence of Operations C.3.29.
Service Call C.3.30.
Task Order C.3.31.
Telecommunication Systems C.3.32.
Tour C.3.33.
Utility Hours C.4.
STATEMENT OF WORK
C.4.1.
Initial Deficiency List (IDL) C.4.1.1.
Investigation of Existing Conditions C.4.1.2.
Price Proposal C.4.1.3.
Correction of Existing Deficiencies C.4.1.4.
Items not Identified on the Initial Deficiency List C.4.2.
Use of CMMS C.4.3.
GEMnet Program C.4.4.
System Performance Standards C.4.5.
On-Site Staff C.4.6.
Buildings Operations C.4.6.1.
General C.4.6.2.
Tenant Environment C.4.6.3.
Posting Operating Instructions C.4.6.4.
Tours C.4.6.4.1.
General C.4.6.5.
Operating Logs and Tour Check Sheets C.4.6.5.1.
Tour Frequencies C.4.6.5.2.
Leak Testing C.4.6.6.
Energy and Utilities Management C.4.6.6.1.
Weekend/Holiday Overtime Utilities C.4.6.6.2.
Energy Conservation C.4.6.6.3.
Demand Response Programs C.4.6.7.
Safety and Environmental Management - Special Requirements C.4.6.7.1.
Refrigerant Control and Certification C.4.6.7.2.
Refrigerant Monitor Testing C.4.6.7.3.
AQMD Operating Permits C.4.6.7.4.
Underground Storage Tanks C.4.6.7.5.
Boiler and Pressure Vessel Operation and Inspection Standards C.4.6.7.6.
Fire Alarm Central Station Monitoring C.4.6.7.7.
Confined Spaces C.4.6.7.8.
Asbestos Management C.4.6.7.9.
Hazardous Materials C.4.6.7.10.
Fire Protection C.4.6.7.11.
Forklift and Man Lifts C.4.6.8.
Control Systems C.4.6.9.
BAS Alarm Response C.4.6.10.
Water Treatment C.4.6.10.1.
General C.4.6.10.2.
Tolerances C.4.6.10.3.
Initial Report and Development of Program.
C.4.6.10.4.
Corrosion Monitoring C.4.6.10.5.
Water Treatment Monitoring C.4.6.10.5.1.
Monthly Testing (Lab Analysis) C.4.6.11.
Oil Analysis and Oil Changes C.4.6.11.1.
Initial Oil Analysis C.4.6.11.2.
Periodic Oil Analysis C.4.6.11.3.
Oil Changes C.4.6.12.
Basement Trash Room Upkeep C.4.7.
Maintenance C.4.7.1.
General C.4.7.2.
Application of Diagnostic Software C.4.7.3.
Preventive Maintenance (PM) Standard C.4.7.4.
Submittal of Proposed Maintenance Program C.4.7.5.
Special Maintenance Requirements C.4.7.5.1.
Backflow Prevention Devices C.4.7.5.2.
Drain Traps C.4.7.5.3.
Landscape Irrigation Systems C.4.7.5.4.
Electrical Inspection, Testing and Maintenance C.4.7.5.5.
Thermographic Scanning of Electrical Equipment C.4.7.5.6.
Emergency Generator Maintenance C.4.7.5.7.
Labeling of Electrical Circuits C.4.7.5.8.
Lubricants, Preservatives, and Cleaning Materials C.4.7.5.9.
Pump Alignment C.4.7.5.10.
Recalibration of Gauges, Pneumatic Systems and Electronic Sensors C.4.7.5.11.
Terminal Boxes C.4.7.5.12.
Lamps and Ballasts C.4.7.5.13.
Window-Washing Equipment C.4.7.5.14.
Forklift and Manlift Equipment C.4.8.
Architectural and Structural Maintenance and Repairs C.4.8.1.
General C.4.8.2.
Locksmith Services C.4.8.3.
Maintenance Painting C.4.8.4.
Doors and Ramps C.4.8.5.
Interior Signage and Directories C.4.8.6.
Roof Inspections C.4.8.7.
Equipment Associated with Elevator Systems C.4.9.
Service Calls and Repairs C.4.9.1.
General C.4.9.2.
Service Call and Repair Records C.4.9.3.
Emergency Callback C.4.9.4.
Service Calls C.4.9.4.1.
General C.4.9.5.
Repairs C.4.9.5.1.
General C.4.9.5.2.
Minor Repairs C.4.9.5.3.
Reimbursable Repairs C.4.9.5.3.1.
Approval of Work C.4.9.5.3.2.
Invoicing C.4.9.5.3.3.
Ordering Repairs from Outside Source C.4.9.5.4.
Force Majeure C.4.9.5.5.
Warranties C.4.10.
Service Call Desk C.5.
UTILITY HOURS
C.6.
Additional Services [indefinite quantity provisions] C.6.1.
General C.6.2.
Price Proposal for Additional Services Work C.6.3.
Pricing C.6.3.1.
Parts and Materials C.6.3.2.
Labor C.6.3.3.
Subcontracts C.6.4.
Cost Documentation C.6.5.
Competitive Bids C.6.6.
Method of Ordering and Invoicing C.7.
GENERAL AND ADMINISTRATIVE REQUIREMENTS
C.7.1.1.
Purpose C.7.1.2.
Components of the Building Operating Plan C.7.1.3.
Existing Building Operating Plan C.7.1.4.
Format of the Building Operating Plan C.7.1.5.
Revisions/Updates to the Building Operating Plan C.7.2.
Equipment Inventory C.7.3.
Formal Quality Control Program C.7.4.
: Disruptions to Tenants or Building Service C.7.4.1.
Disabling Major Equipment C.7.4.2.
Impact on Fire Protection Systems C.7.4.3.
Disruptive or Hazardous Tools C.7.4.4.
Delivery and Storage C.7.5.
Quality of Work/Matching to Existing Finishes C.7.6.
Contractor Furnished Supplies, Materials and Equipment C.7.6.1.
General C.7.6.2.
Telephone C.7.6.3.
Furniture and Furnishings C.7.6.4.
Computer Equipment C.7.7.
Government Furnished Property C.7.7.1.
General C.7.7.2.
Office, Workshop, Storage Space, and Machine Rooms C.7.7.2.1.
General C.7.7.2.2.
DSL Service C.7.7.2.3.
Upkeep of Machine Rooms and Storage Areas C.7.7.2.3.1.
General C.7.7.2.3.2.
Painting C.7.8.
Compliance With Federal, State and Local Codes C.7.9.
Review of Design Documents C.7.10.
Document Preparation and Conference Center Services H.1.
SECURITY REQUIREMENTS AND PERSONAL IDENTITY VERIFICATION PROCEDURES (NON-CLASSIFIED CONTRACT) H.1.1.
General H.1.2.
Homeland Security Presidential Directive (HSPD)-12 H.1.3.
Personal Verification of Contractor Personnel H.1.4.
GSAM 552.237-71 Qualifications of Employees (May 1989) H.1.5.
Required Information Submissions H.1.6.
General Description of the Clearance Process H.1.6.1.
Name Check and Fingerprint Check H.1.7.
Tenant Agency Security Requirements H.2.
IDENTIFICATION CREDENTIAL
H.3.
ESCORT REQUIREMENTS
H.4.
STANDARDS OF CONDUCT
H.5
REMOVAL FROM CONTRACT WORK
H.6.
SENSITIVE BUT UNCLASSIFIED (SBU) BUILDING INFORMATION
Factor 1 - Experience Factor 2 - Management and Personnel Resources
B. NO QASP ELEMENTS FOR SECTION B
C. PERFORMANCE WORK STATEMENT
C.1. GENERAL SCOPE OF WORK
The Contractor shall provide Operations, Maintenance and Repair services for the
Phillip Burton Federal Building & U S Courthouse
450 Golden Gate Avenue
San Francisco, California 94102 to include the following (as defined herein):
1) Electrical systems;
2) Mechanical systems and equipment;
3) Fire Protection systems and equipment;
4) Control Systems controlling all systems which themselves are within the scope;
5) Architectural and Structural systems, fixtures, structures and equipment within the government owned site;
6) Service call desk operations, to include record keeping using the computerized maintenance management system;
7) Maintenance of Landscape Irrigation Systems;
8) Mechanical equipment for window-washing (wall glider, tracks, and associated equipment);
9) Maintenance and proper use of Forklift and Manlift.
10) Electrical Testing, Inspection and Maintenance.
Additional Services may be ordered at the discretion of GSA for work relating to the OM&R or upgrade of the covered facilities, but not covered in the Basic Services of the contract, as described herein.
Additional equipment or facilities within the control of the same GSA Field Office may be added to the contract scope through negotiation at any time during the term of the contract.
Excluded from the scope are:
1) Elevator/vertical transportation systems
2) Security Systems;
3) Telecommunication Systems;
4) Equipment owned and operated by tenant agencies;
5) Furnishings (not installed as fixtures);
6) Paper dispensing equipment in restrooms;
7) Equipment owned by servicing public utilities;
8) Upgrade of software or software licenses (to include BAS and CMMS).
C.2. REFERENCES
The following publications are incorporated by reference, as setting quality, performance and design standards for work required herein. Unless a specific date is provided, references are for the version in published at the time of issue of the solicitation, to include any addenda or errata published by the publishing organization.
1) Public Buildings Maintenance Guides and Time Standards GSA-PM, January 1995;
2) Facilities Standards for the Public Buildings Service (PBS P100);
3) U.S. Courts Design Guide;
4) SMACNA HVAC Systems Testing, Adjusting & Balancing;
5) ASHRAE Guideline 1HVAC Commissioning Process;
6) ASHRAE Guideline 4 Preparation of Operating and Maintenance Documentation for Building Systems;
7) ANSI/ASHRAE Standard 15 Safety Code for Mechanical Refrigeration;
8) ANSI/ASHRAE Standard 34 Number Designation and Safety Classification of Refrigerants;
9) ANSI/ASHRAE Standard 55, Thermal Environmental Conditions for Human Occupancy (with addenda and interpretations through 12/31/96);
10) ANSI/ASHRAE Standard 62, Ventilation for Acceptable Indoor Air Quality;
11) ANSI/ASHRAE Standard 100, Energy Conservation in Existing Buildings-Commercial;
12) ANSI/ASHRAE Standard 111, Practices for Measurement, Testing, Adjusting, and Balancing of Building Heating, Ventilation, Air-Conditioning, and Refrigeration Systems;
13) ASME Boiler and Pressure Vessel Code ;
14) ASME CSD-1 Control and Safety Devices of Automatically Fired Boilers;
15) National Board Inspection Code
16) CSI MasterFormat (1995 edition)
17) NETA Maintenance Testing Specification for Electrical Power Distribution Equipment and Systems;
18) NFPA 70B Recommended Practice for Electrical Equipment Maintenance;
19) DOE/EE-0157 International Performance Measurement and Verification Protocol ;
20) R.S. Means Facilities Maintenance and Repair Cost Data;
21) R.S.Means Facilities Construction Cost Data.
22) National Electrical Code;
23) International Building Code;
24) International Fire Code;
25) International Plumbing Code;
26) International Mechanical Code;
27) National Fire Protection Association (NFPA) Standards and Codes.
C.3. definitions
Key terms are defined as follows:
C.3.1. Acceptance
"Acceptance" means an authorized representative of GSA has inspected and agreed that the work meets all requirements of this contract, to include documentation requirements.
C.3.2. Approval
"Approval" means GSA has reviewed submittals, deliverables, or administrative documents (e.g., insurance certificates, installation schedules, planned utility interruptions, etc.) and has determined the documents conform to contract or contract requirements. Government Approval shall not relieve the Contractor from responsibility for complying with contract requirements.
C.3.3. Architectural and Structural
All building systems customarily included in CSI Divisions 2,3,4,5,6,7,8,9,10,13, to include building core and shell, building improvements and finishes, and exterior site improvements (e.g., paving, walkways, exterior lighting, etc.), but excluding equipment owned and operated by tenant agencies or concessions contractors unless indicated otherwise.
C.3.4. Basic Services
The Basic Services of the contract consist of the recurring contract requirements for which the Contractor is paid through monthly payments, i.e., the requirements established by the contract statement of work and related general and administrative requirements. Indefinite Quantity requirements (Additional Services and Reimbursable Repairs) are requirements outside of Basic Services, for which payment is made on a case-by-case basis.
C.3.5. Building Automation System (BAS)
The system controlling and monitoring building HVAC, and possibly other systems, to include all device, field and global controllers; instrumentation; networking infrastructure; computers and peripherals; software; programming; database files; and licenses, C.3.6. Building Operating Plan
A mandatory plan that the Contractor prepares for Government approval that describes the Contractor's program for operating and maintaining the building, to include both normal circumstances and contingencies.
C.3.7. Computerized Maintenance Management System (CMMS)
A CMMS is a database and application software package which automates the OM&R recordkeeping requirements. As used in this specification, CMMS refers to GSA provided CMMS.
C.3.8. Consumable
Consumable parts or components are parts or components which customarily require regular replacement in a maintenance program, prior to equipment failure. Examples are oil, grease, belts, filters, ballasts, and lamps.
C.3.9. Contractor
"Contractor" as used herein refers to the firm awarded this contract.
C.3.10. Controls/Control System
A Control System is any low voltage control, communication and monitoring system, including but not limited to device, field and global controllers; instrumentation; networking infrastructure; computers and peripherals; software; programming; database files; and licenses. Examples are the BAS, and lighting control systems. Fire protection systems and security systems are excluded from this definition for purposes of this Contract, and are defined separately.
C.3.11. Electrical
All building and site systems of the types generally included in Division 16 in R.S. Means Facilities Construction Cost Data, with the exception of Control Systems, Telecommunication Systems, Security Systems, and equipment owned by a servicing public utility.
C.3.12. Elevator
All building systems of the types generally included in Division 14 in R.S. Means Facilities Construction Cost Data, but not including supporting Electrical and HVAC equipment.
C.3.13. Emergency Callback
A Service Call or other request for service placed outside of Normal Working Hours, and of such a nature that response cannot wait for the resumption of Normal Working Hours.
C.3.14. Fire Protection Systems
Systems and equipment installed in the building for the purposes of detecting fires or heat or smoke, alarming occupants of possible fire, activating certain emergency responses in other systems and equipment (e.g., Elevator recall, stairwell pressurization), and suppressing fires. These systems include Electrical, Mechanical and Controls components.
C.3.15. Furnishings
All equipment of the types generally included in Division 11 and 12 in R.S. Means Facilities Construction Cost Data.
C.3.16. Heating, Ventilation and Air-Conditioning (HVAC)
HVAC includes all systems with the function of providing ventilation or temperature control to building spaces. HVAC equipment is a subset of Mechanical, Electrical and Controls equipment and systems, and intersects the definitions of each of these.
C.3.17. HVAC Operations Manual
The HVAC Operations Manual is a manual prepared by GSA (or a consultant to GSA) providing a description of the functioning of a building’s HVAC systems and establishing performance standards for these systems.
C.3.18. Landscape Irrigation Systems
Landscape Irrigation Systems include all piping, tubing, hoses, sprinkler heads, valves, sensors and controllers used to water vegetation.
C.3.19. Mechanical
All building and site systems of the types generally included in Division 15 in R.S. Means Facilities Construction Cost Data, with the exception of equipment owned by a servicing public utility.
C.3.20. Monthly Progress Report
The Monthly Progress Report is a report due monthly itemizing all current incomplete work (e.g., incomplete preventive maintenance, incomplete repairs), summarizing work completed during the month, and itemizing issues under investigation.
C.3.21. Normal Working Hours
Normal Working Hours are8:00 a.m. -4:30 p.m., excluding weekends and federal holidays.
C.3.22. Operational Efficiency Upgrade
A systems upgrade project carried out by the Contractor, with Government approval, for purposes of improving the operational efficiency of the facility.
C.3.23. Operations
Operations is the continual process of using building equipment systems to accomplish their function. Operations includes analysis of requirements and systems capabilities, programming and operating Controls and Control Systems, responding to Service Calls, Touring and observing equipment performance and condition, adjusting equipment, identifying needed maintenance and Repairs to equipment, and maintaining lubrication and chemical treatments.
C.3.24. Predictive Maintenance
Predictive Maintenance is a program of maintenance activities in which scheduling of maintenance derives from monitoring the operating condition, or changes in the operating condition, of equipment being maintained.
C.3.25. Preventive Maintenance
Preventive Maintenance is a program of maintenance activities performed on a fixed schedule, or on equipment runtimes.
C.3.26. Repair
A Repair is an act of restoring inoperable, dysfunctional or deteriorated equipment, systems, or material to a fully functional, non-deteriorated state. Repairs usually involve some combination of labor and replacement parts, components or materials. A "Minor Repair" is a repair that is the Contractor's responsibility with no reimbursement from GSA. A "Reimbursable Repair" is a repair that is reimbursable to the Contractor, in whole or in part, in accordance with provisions herein.
C.3.27. Security Systems
Security Systems include:
(1) systems to detect intrusion into the building or areas of the building, including sensors and camera systems; and,
(2) access control systems, such as automatic card readers for building, room or parking lot access
(3) magnetometers and associated equipment for screening persons entering the building(s).
C.3.28. Sequence of Operations
The control logic to operate a system, normally put into effect through a control program.
C.3.29. Service Call
A Service Call is a response to a tenant or agency complaint, or a response to an observation that some equipment, system or material covered by the contract is inoperable, dysfunctional or deteriorated, or that performance standards of the contract are not being met. Service Call response involves analysis of the problem, and adjustment of operating or monitoring Controls or other immediate corrective action. A requirement to perform a Repair may result from the analysis stage of a Service Call. Service Calls may be generated automatically from interfaces to BAS or diagnostic software.
C.3.30. Task Order
A Task Order is an order for Additional Services or Reimbursable Repairs under this contract.
C.3.31. Telecommunication Systems
Telecommunication Systems include building telephone systems, and specialized agency communication systems, but excluding the communication subsystems of other systems defined separately herein.
C.3.32. Tour
A Tour is either scheduled visits to equipment rooms and installations by operating personnel for the purpose of assuring that equipment is running properly, that equipment rooms are in good order and without safety hazards, and to make any necessary adjustments to operating Controls or to lubricate equipment, or some combination of such physical visits with automated monitoring of equipment and systems.
C.3.33. Utility Hours
Utility Hours are hours of labor and associated Consumable materials which are performed at the request of the COR at no additional cost to GSA. They must be for work involving skills necessary for the day to day work under this Contract.
C.4. STATEMENT OF WORK
C.4.1. Initial Deficiency List (IDL)
QASP: performance is satisfactory if the new IDL is submitted on time, is clear, and only identifies appropriate items. Note that an incomplete IDL is less for GSA's benefit than to protect the Contractor; incompleteness increases the Contractor's liability.
C.4.1.1. Investigation of Existing Conditions
The Contractor is responsible for investigating the condition of equipment and systems during the Startup Phase. The Contractor shall advise the COR of inspections to be performed in the course of this investigation, and invite the COR to attend such inspections. The Contractor shall notify the COR of any lack of cooperation by the incumbent contractor in carrying out this function.
When the Contract nears completion or is otherwise pending termination, the Contractor is responsible for cooperating with the successor Contractor performing IDL investigation prior, to include providing access to all areas, providing access to records, answering questions and directing all employees to answer all questions honestly and completely.
C.4.1.2. Price Proposal
The Contractor shall submit prices proposals for Repairs of items on the IDL as part of the IDL report, and agree to maintain validity of said costs for a period of not less than sixty (60) calendar days. These prices shall normally be submitted with the existing deficiency report, although the CO or COR may grant an extension if pricing is particularly complex. Price proposals for Repair of existing deficiencies shall follow the pricing guidelines established for Additional Services. The Government reserves the right to order any or all existing deficiency corrections from an outside source.
If the Contractor is unable to complete pricing IDL items on time, an extension should be requested from the COR. Such extension will not be unreasonably withheld if the Contractor is diligently attempting to obtain price verification from appropriate sources.
C.4.1.3. Correction of Existing Deficiencies
Regardless of the IDL, the Contractor shall be responsible for making adjustments or corrections that fall within the scope of routine (preventive) maintenance required by this contract at no further cost to GSA. This includes but is not limited to making adjustments to Controls, adjusting the BAS software , applying lubricants, cleaning fan housings, fans, coils, dampers, AHU sections, equipment rooms and replacing Consumable components. The CO or COR will review the report and shall determine if any existing deficiencies noted in the report are within the scope of routine (preventive) maintenance, and shall notify the Contractor of this determination. Such items will be deleted from the deficiency list; the Contractor shall correct such items at no additional cost to GSA within 90 calendar days of completion of the Startup Phase of the Contract. The Contractor has the right to dispute any such determinations in accordance with the Disputes clause of this Contract. The COR may correct remaining items on the deficiency list by any of these methods:
1. order the work to be performed by the Contractor under the Additional Services provisions of the contract;
2. defer Repairs, if the deficiency is not critical;
3. have Repairs made by a third party.
C.4.1.4. Items not Identified on the Initial Deficiency List
Pre-existing conditions not identified on the IDL will be considered the Contractor's responsibility under the Minor Repairs or Reimbursable Repairs provisions herein, as applicable.
C.4.2. Use of CMMS
QASP: All contract work must be recorded as work orders or appropriate types. Contract performance is unsatisfactory if intentional or reckless falsification of work orders or equipment information is detected. Other QASP criteria are found herein in more specific provisions.
The designated CMMS shall be used for administrative control of building Operations, Maintenance and Repair functions, to include equipment inventory; equipment history, maintenance and repair cost history; and Service Call and Repair tracking. The database itself will be maintained centrally by GSA; the Contractor is responsible for maintaining records within the CMMS pertaining to work within the scope of this contract.
All work performed under this contract must be recorded in the form of work orders, following GSA guidance. Time and costs must be recorded within all work orders. Work orders must be linked to equipment whenever appropriate (e.g., whenever the work is associated with a discrete item of equipment or system). Descriptive remarks must be entered describing conditions noted, repairs made, or otherwise describing resolution of the issue.
C.4.3. GEMnet Program
QASP: Any intentional or negligent failure to reasonably cooperate with data management or systems communications efforts demonstrates unsatisfactory performance.
The GSA Energy and Maintenance Network (GEMnet) is a system established by the GSA Pacific Rim Region, composed of a software and hardware backbone system and organization elements (contract and government staffed), to carry out a number of support functions, including:
1) Consistent central management of energy, maintenance, operations, and repairs data;
2) Quality Assurance of Contractor performance, including but not limited to M&V of systems performance;
3) Assistance to building managers and OM&R contractors in operating facilities efficiently, including but not limited to the application of diagnostic algorithms to systems data and monitoring of BAS alarms and other data;
4) Assistance in upgrading facilities;
5) Assistance in utilities management
6) Develop interfaces between the CMMS and data obtained from other systems, such as BAS and diagnostic software output.
The Contractor shall fully cooperate with GEMnet data management and communications efforts in support of each of these functions.
C.4.4. System Performance Standards
QASP: systems performance standards are established in the operations manuals. Simple deviation from systems performance is insufficient to determine unsatisfactory performance, as this can relate to circumstances or to underlying systems problems that would require construction-level work to correct. Satisfactory performance is achieved by promptly noting out of tolerance systems performance, entering work order(s) as appropriate, and taking rational and competent steps to make corrections. Corrections that would be out of scope for this Contract must be brought to GSA’s attention with competent diagnosis. The Contractor’s performance is unsatisfactory when significant periods of out of tolerance systems performance go unrecognized, when there is no significant activity to correct the problem, or when action to correct the problem does not demonstrate an understanding of the systems or the analytical skills to solve the problem.
An HVAC Operations Manual has been developed that contains performance standards for certain building equipment and systems. This will be furnished on request. The Contractor shall maintain equipment systems so as to maintain these performance standards during the term of the contract, to include option periods. The Government may utilize Measurement and Verification procedures as quality assurance measures to assure that the Contractor is maintaining such performance standards. The CO or COR may permit an authorized deviation from the performance standards if there are circumstances which would reasonably excuse the Contractor. Failure to achieve the performance standards may result in performance deductions under the Adjusting Payments clause.
The Government may modify the HVAC Operations Manual during the performance period of the Contract. The Contractor shall maintain equipment systems so as to maintain the modified performance standards at no additional cost so long as GSA reasonably demonstrates that the modified standards are obtainable with the building’s systems at the time of modification.
If an HVAC Operations Manual is developed, GSA may modify such HVAC Operations Manual during the performance period of the Contract.
C.4.5. On-Site Staff
QASP: the Contractor’s performance is unsatisfactory if there is more than one incident per month in which GSA is unable to reach a representative of the Contractor, on site, during Normal Working Hours and outside of scheduled lunch periods. Performance is not unsatisfactory if a representative on-site responds to a recorded message within 15 minutes. While GSA does not dictate staffing levels beyond this minimal requirement, staffing levels should be monitoried for inadequacy. If staffing appears inadequate, likely all requirements are not being met and so surveillance of contract performance should be increased. Likewise, if staff necessary to carry out basic contract requirements are being diverted to perform reimbursable work, increased surveillance may be called for.
The Contractor shall keep at least one qualified technician on site during Normal Working Hours, with the exception of lunch and other brief breaks. The on-site technician, or the on-site supervisor when multiple technicians are present, shall maintain some form communication access (pager, cellular telephone, etc.) to allow contact by GSA at all times during the hours indicated above, and shall have reasonable English communication skills. The on-site technician(s) must have sufficient skills to perform immediate response to a variety of service calls involving multiple trades.
This requirement pertains only to maintaining a minimal presence for communications and emergency response, and does not imply that one technician is adequate staffing. Additional staffing levels must be set by the Contractor in accordance with the requirements of the facility and the Contract. The Government will not direct staffing levels beyond the one technician, but an observation of apparently insufficient staffing may lead to increased quality assurance scrutiny of the Contractor’s operations.
C.4.6. Buildings Operations
C.4.6.1. General
The Contractor shall provide building Operations services of all systems covered by this contract, so as to maintain utilities services and environmental conditioning to tenants during Normal Working Hours, and at other times as described herein; so as to preserve the asset value of the facility and its systems; and so as to otherwise minimize operating costs to GSA without compromising these other objectives or other contract requirements.
Specific requirements identified herein are not a comprehensive list of tasks that may be necessary to meet the general requirement, and shall not be interpreted as exclusionary. Requirements below are not applicable if the pertinent equipment or systems is excluded from the scope of the contract.
C.4.6.2. Tenant Environment
QASP: GSA should trend zone temperatures to the extent permitted by the BAS. CO2 should be measured as feasible (generally this can only be done at AHU level, sensors are generally not in place at zone level). Temperatures should generally be +/- 2 degF of setpoint, but perimeter zones near windows inevitably vary more, so should be allowed +3 degF in afternoons. If persistent problems are noted, a work order should be entered. Correction of the problem within Contract standards demonstrates satisfactory performance. It should also be considered whether it is possible to maintain the standard - there are sometimes factors (e.g. poor HVAC design, poorly performing southern-exposure glazing) beyond the Contractor's control preventing performance to these standards. Failure to respond within Service Call standards more than twice in a given month constitutes unsatisfactory performance in temperature maintenance (under normal conditions – there may be unusual conditions where the Contractor cannot reasonably maintain standards for some period of time. Some deviation also must be permitted during demand response events).
If CO2 is measured at more than 200 ppm above ambient (consistently enough to preclude a sensor error), a work order should be entered. Correction of the problem within Repair standards demonstrates satisfactory performance.
Lighting level problems caused by failed lamps, missing lamps or failed ballasts must be corrected promptly through the work order system. Lighting level problems caused by design or tenant locations must be reported promptly to the COR following tenant complaint. More than 2 failures in a given month to meet Service Call requirements pertaining to lighting constitutes unsatisfactory performance regarding lighting maintenance.
ANSI/ASHRAE Standards 55 and 62 (with addenda) establish temperature, and ventilation standards; the COR may direct changes to these standards to ensure tenant comfort.
The COR shall indicate temperature settings for domestic hot water.
Lighting levels shall be adjusted under the guidance of the COR. Target lighting levels are established by the PBS P100; however, light quality, specific tenant requirements and other individual factors impact requirements.
The COR shall direct any special conditioning requirements (e.g., computer rooms).
Environmental standards must be maintained throughout Normal Working Hours; equipment startup must be early enough to fully attain environmental conditions at the beginning of Normal Working Hours.
If building design does not permit operation to current standards, the Contractor must maintain standards as close to the current standards as possible given the existing equipment of the building.
C.4.6.3. Posting Operating Instructions
Equipment operating instructions and tour inspection checklists will be posted in all mechanical rooms, as applicable to equipment in the given room. For major mechanical rooms this may consist of a binder maintained in a conspicuous and accessible location. The operating instructions must correspond with operating instructions and sequence of operations descriptions in the Building Operating Plan, and also must correlate with sequences of operations actually programmed in the BAS.
C.4.6.4. Tours
QASP: performance is satisfactory if 95% of tours are completed as scheduled, and if leak testing, and testing of alarm systems, is performed and recorded as a work order at the frequency indicated, with no more than one omitted test in a six month period. Performance is unsatisfactory if less than 95% of tours are not completed as scheduled, or if tour records are falsified.
C.4.6.4.1. General
The Contractor shall Tour major building equipment at set frequencies. The Tour program shall be described in the Building Operating Plan. Log sheets associated with major operating equipment shall be completed at the time of Tours. Such log sheets, at the commencement of contract performance, shall be completed established with design condition numbers (usually in the first column), for reference against actual readings at the time Tours are performed. Paper log sheets need not be used for equipment monitored and data logged by the BAS, if such monitoring and data logging provides a sufficient database of operating data to allow for analysis of trends in equipment performance and troubleshooting.
Tours will also be entered in the CMMS as work orders. The respective work order shall be completed immediately on completion of the Tour. All findings noted during the Tour shall be entered as remarks on the work order. All deficiencies noted shall be immediately entered as follow-on work orders of appropriate types.
C.4.6.5. Operating Logs and Tour Check Sheets
Operating logs shall be maintained for major equipment at the site of the equipment. Information recorded on the logs shall be adequate to track the operating hours and performance history of the equipment. Tour check sheets should be stationed at major points for building Tours (for example, air handler rooms). These must be checked when Tours are performed. Log forms, Tour check sheets and Operator Assignment sheets shall be incorporated into the Building Operating Plan.
There must either be separate tour check sheets for each frequency of inspection, or (preferably) different checklist columns on a standard tour check sheet for each frequency.
Automation of operating logs through use of BAS datalogging capabilities is encouraged; this eliminates the need for manual operating logs if the datalogs are used to generate reports showing the history and trends in equipment performance.
The system of operating logs and tour documentation shall be described in the Building Operating Plan.
C.4.6.5.1. Tour Frequencies
Minimum requirements where no BAS monitoring is available:
1. DAILY: Major HVAC equipment (when in operation) including boilers, chillers, cooling towers, pneumatic control air compressors, and air handler rooms. Fire alarm system control panels. Switchgear/primary Electrical equipment rooms.
2. WEEKLY: Distributed HVAC equipment (package units, external condensers, etc.). Pumps, motors, sewage ejectors.
3. TWICE-MONTHLY: Battery systems (UPS, generators, etc.).
4. MONTHLY: Transformers, secondary Electrical rooms.
If BAS monitoring and data logging is sufficient to monitor equipment status and performance, such monitoring and data logging may act as a partial substitute for physical tours. However, technicians shall always visit central plant areas daily, other major mechanical rooms (e.g., with large or multiple AHUs) daily, cooling towers daily, and other mechanical areas at least once per week regardless of remote monitoring ability.
C.4.6.5.2. Leak Testing
Leak testing for refrigerants and natural gas shall be performed in conjunction with tours not less frequently than weekly unless sensors and alarm systems are installed and are performing this function. Installed leakage alarm systems shall be tested not less than monthly using appropriate test media to test the functionality of the sensor as well as the functionality of the alarm system. This testing shall be incorporated into the preventive maintenance program.
C.4.6.6. Energy and Utilities Management
C.4.6.6.1. Weekend/Holiday Overtime Utilities
QASP: More than one failure to schedule overtime utilities when requested per year constitutes unsatisfactory performance. If overtime utilities are properly scheduled but an equipment failure disrupts service, the incident will not count as such a failure if a technician arrives on site and restores service within two hours of the time of failure.
The Contractor may be required to provide HVAC service outside of Normal Working Hours. The Contractor shall provide this service at no additional cost to GSA unless GSA requires that a technician be present. If GSA does not require such presence, the Contractor is nonetheless responsible for providing the service, and for immediate on-site response, at no additional cost to GSA, in the event that an equipment failure occurs.
If GSA requires that a technician be present to provide overtime utilities service, the Contractor shall be reimbursed for the time required at the appropriate overtime rate in the Price Schedule.
C.4.6.6.2. Energy Conservation
QASP: Performance is unsatisfactory if GSA takes a performance deduction for more than one incident of incurring excessive utility costs per year.
The Contractor shall operate equipment and systems as efficiently as possible without compromising service to the tenants, to include making changes in operating sequences or Controls programming which would improve efficiency when such potential improvements are identified by either the Contractor or GSA. Failure to operate equipment prudently (e.g., unnecessarily setting demand peaks; operating equipment when not needed) may result in performance deductions under the Adjusting Payments clause.
C.4.6.6.3. Demand Response Programs
QASP: Performance is unsatisfactory if (1) Contractor refuses to cooperate with a program in which GSA has enrolled the facility; or (2) Contractor fails to implement the prescribed demand response protocol in response to notice of a curtailment on more than one occasion during a 3 month period.
The Government may participate in any of the available demand response programs or critical peak pricing tariffs administered by utilities, State agencies or third-party administrators. If GSA participates in such a program and advises the Contractor of the requirements of such program, the Contractor shall cooperate fully in the implementation of the program.
The Contractor shall develop a curtailment program in consultation with GSA and subject to GSA approval. The Contractor shall implement all GSA-approved curtailment measures (which might typically include turning off unnecessary lighting, shutting down designated elevators, implementing temperature setback programs, etc.) immediately on notification of a curtailment. Failure to diligently manage systems in accordance with such programs may result in performance deductions under the Adjusting Payments clause for excess costs or loss of revenue to GSA.
C.4.6.7. Safety and Environmental Management - Special Requirements
C.4.6.7.1. Refrigerant Control and Certification
QASP: due to the seriousness of refrigerant leaks, performance is unsatisfactory in the event of any leak which generates a fine, or which qualified to generate a fine. Regarding training and record keeping, performance is unsatisfactory if any required records are not maintained, or if HVAC mechanics do not maintain proper certification. However, performance is not unsatisfactory solely due to minor delays in producing documentation, so long as the documentation is produced and is reasonably accurate.
The Contractor shall control refrigerants and maintain records in accordance with EPA and air quality management district standards.
Refrigerant control logs (form furnished by GSA) shall be updated monthly, and a copy sent to the COR not later than the first working day of the next month. The Contractor shall also maintain a set of logs on site, and make this set of logs available to Government inspection.
Contractor employees who come into contact with refrigerants in the course of their duties shall be certified to handle such refrigerants. The Contractor shall submit a copy of such certification to the COR prior to any employee anticipated to handle refrigerants begins duties that might involve handling refrigerants.
In the event of fines or penalties levied by the EPA or an Air Quality Management District (AQMD), the Contractor may be charged the cost as a performance deduction under the Adjusting Payments clause.
C.4.6.7.2. Refrigerant Monitor Testing
QASP: Performance is unsatisfactory if testing is not done, or is delayed by more than two months from the scheduled date.
Chiller room refrigerant monitors and any associated purge ventilation system shall be tested not less frequently than annually.
C.4.6.7.3. AQMD Operating Permits
QASP: performance is unsatisfactory if GSA is issued a notice of violation due to a failure of the Contractor to request a permit, failure of the Contractor to operate equipment within AQMD guidelines, or failure of the Contractor to maintain equipment so as to comply with AQMD requirements. Performance is not unsatisfactory solely because GSA is issued a notice of violation resulting from intrinsic inability of GSA-owned equipment to meet AQMD standards.
The Contractor shall be familiar with the requirements of the local AQMD, and shall be responsible for obtaining operating permits for boilers, generators and other emissions producing equipment regulated by the district. In the event of fines or penalties levied by an AQMD, the Contractor may be charged the cost as a performance deduction under the Adjusting Payments clause.
The Building Operating Plan must describe the specific local AQMD rules that apply to equipment in the building, and summarize the requirements that must be met. It must state which equipment requires permits or notifications.
C.4.6.7.4. Underground Storage Tanks
QASP: Performance is satisfactory if required inspections and training are complete and documented by work orders. More than one failure per year to complete a monthly inspection requirement, or completion of two or more monthly inspections late, or failure to complete annual training within 30 days of the due date, indicate unsatisfactory performance.
Maintenance guides for underground storage tanks shall be supplemented so as to meet any EPA, state or local requirements for monitoring and maintenance. See attached Code ( California Code of Regulations, Title 23, Division 3, Chapter 16 Section 2715(a)-(f) C.4.6.7.5. Boiler and Pressure Vessel Operation and Inspection Standards
QASP: performance is unsatisfactory if failure to meet requirements is associated with an incident resulting in injury. Performance is unsatisfactory if any required certifications are more than 30 days over-due.
Boiler operation and inspections shall be in accordance with:
(1) 1998 ASME Boiler and Pressure Vessel Code;
(2) National Board Inspection Code;
(3) Environmental Protection Agency and local air quality management district requirements.
Boiler inspections shall include internal and external (operating) inspections and tests described in Chapter 2 “Inspection of Boiler and Pressure Vessels” of NBIC. The Contractor shall require the inspector to complete GSA Form 349 (Inspection Report of Boiler) for each boiler inspected. The Contractor shall have unfired pressure vessels with design operating pressure in excess of 60 p.s.i. and having a capacity in excess of 15 gallons inspected annually. The Contractor shall complete GSA Form 350, (Inspection Report of Unfired Pressure Vessels) for each unfired pressure vessel inspected. A GSA Form 1034 (Certificate of Inspection) shall be completed and posted on or near the equipment. Inspections shall be made by inspectors certified by the National Board of Boiler and Pressure Vessel Inspectors, and must be employed by an independent firm specializing in boiler and unfired pressure vessel inspections.
C.4.6.7.6. Fire Alarm Central Station Monitoring
QASP: Performance is unsatisfactory if Contractor fails to maintain the required monitoring service throughout the term of the Contract.
The Contractor shall maintain lines, transmitters and related equipment and materials, to connect to a UL approved Central Station for fire alarm monitoring, and shall procure such monitoring service. All Fire Protection systems and equipment shall be kept fully functional at all times, except for limited periods for maintenance with the COR’s approval.
C.4.6.7.7. Confined Spaces
QASP: Performance is unsatisfactory if substantial hazards are not appropriately identified. GSA personnel should use judgement as to the severity of the problem, as confined space classifications can be subject to different opinions in some cases. In all events, if GSA directs labeling of certain spaces this should be done promptly.
The Contractor shall identify permit required confined spaces, and procedures for entry into such confined spaces, in the Building Operating Plan. See attachment for list of confined spaces in the building.
The Contractor shall at all times comply with 29 CFR 1910.146 (C)(8).
Within 60 calendar days of beginning contract performance, the Contractor shall post all confined spaces with signage stating: “DANGER – PERMIT-REQUIRED CONFINED SPACE, DO NOT ENTER”
C.4.6.7.8. Asbestos Management
QASP: Performance is unsatisfactory if there is a release of asbestos into the air, or improper disposal of ACMs, due to negligence of the conractor or contractor's employees.
Systematic removal of asbestos is not required by this contract. The Contractor must be prepared to deal with asbestos on a small scale, short duration basis.