Amendment_03.pdf
PDF 446 KB Posted
- Solicitation number
- GS-07-P-16-HT-C-7012
About this file
Amendment 03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_04.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| GS-07-P-16-HT-C-7012.pdf | ||
| PBS_Past_Performance_Questionnaire.docx | DOCX document | |
| Pre-Proposal_Attendee_Registration_Form.pdf | ||
| Attachment_A_-_Experience_on_Similar_Projects.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
7PQD
See the attached.
7PQD
Energy & Acquisition Support Branch
819 TAYLOR ST
FORT WORTH, TX 76102-6124 United States
Energy & Acquisition Support Branch
819 TAYLOR ST
FORT WORTH, TX 76102-6124 United States
GS-07-P-16-HT-C-7012
1 49
08/24/2016
07/29/2016
Amendment No. 3 – Solicitation No. GS-07-P-16-HT-C-7012 for HVAC Replacements in El Paso, Fort Hancock and Marfa, TX
This amendment is issued to provide a revised Scope of Work dated 8/23/16, a revised Document C101-SB (The Agreement) and to respond to questions.
1. The Trane Split Systems specified for Building A and B in Marfa Texas do not have an option for a 5 KW electric heat strip on the indoor units. This is for model numbers:
4MXW8518A10N0A, 4MUC4524A10N0A, 4MUC4518A10N0A, and 4MXW2718A10N. Is the electric heat required? No.
2. While doing the technical proposal I noticed that TX0972 - Ysleta Building A (for demo of package units) does not request to reconnect the gas. I have the specs from the manufacturer on the new units which is showing gas pack units. I know some of the units you requested were converted to electrical (Fort Hancock). Is this the case here or is it just an accidental omission? This was an accidental omission for Ysleta, TX0972.
All units need to be reconnected to the gas line. The SOW has been revised.
3. Please confirm that we may submit our proposal via email. Please see section I.H. (4) Receipt of Offers in Document: C201-SB LPTA of the solicitation.
“(4) Offers may also be submitted by email to the following address:
Shawna.villarreal@gsa.gov. Offers must be received by the due date and time stated in (1) above. An original copy of the bid bond must be received at the address provided in (1) above no later than COB three days after the proposal due date.”
mailto:Shawna.villarreal@gsa.gov
GSA Public Buildings Service Greater Southwest Region 7, Fort Worth, Texas
August 23, 2016
Project Title:
Paso Del Norte L.P.O.E. and Ysleta L.P.O.E HVAC Replacement in Various Buildings
Project Locations:
TX0943 PDN, Primary Inspection Booths #1 - #12 1000 S. El Paso St.
El Paso, TX 79901
TX0948 PDN, Building D, Border Patrol Building 1000 S. El Paso St.
El Paso, TX 79901
TX0972 Ysleta Building A 797 S. Zaragoza Rd El Paso, TX 79907
TX0973 Ysleta Building B
TX0964 Ysleta Building D
TX0979 Ysleta Truck Primary Booths #1- 8 and TX0980 Ysleta Truck Exit Booth #1-3 797 S. Zaragoza Rd El Paso, TX 79907
TX0705FH Building A
TERMINATION FM 1088
Ft Hancock, TX 79938
TX0706FH Primary Booths (#1 and #2)
TERMINATION FM 1088
Ft Hancock, TX 79938
TX0521MF, Building A, Administration Building 300 E. Madrid Marfa, TX 79843
TX0522MF, Building B, Repair Garage Building
SCOPE OF WORK
The Contractor shall provide all material, labor, tools, equipment and supervision, necessary to complete demolition and installation of the following scope of work.
TX0943 – Primary Booths PDN
A. Demolition
1. Remove existing Evaporative Coolers, twelve (12) each and dispose of properly.
Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2. Remove existing ductwork from evaporative coolers to primary booths, to include hot water coils, supply air duct and air curtain. All duct work above canopy shall be capped.
3. Disconnect, cut and cap off hot water supply and return lines. Demolition to include, but not limited to: insulation and hangers.
4. Remove all existing evaporative cooler controllers inside booths, to include associated wind up timers.
5. All existing electrical wires shall be removed and disposed of properly. Existing conduit shall be re-used for new outdoor unit above canopy.
6. All HVAC equipment not included in the demolition notes and not within project footprint shall remain in place and operational.
B. New Work
1. Contractor shall furnish and install twelve (12) each 2 Ton package rooftop unit with integrated hot water coils. Hot water modulating valves shall be included and integrated with the controls (Equal to or better than Aaon Model number R Q-0 02- 8 -V- CA01-E JJ: 00 0 0-00 0- P KB- 0A0 -00 0F0 00-0 0-0 000 000 0B 208-3 phase 27.43 MBH Cooling 15.2 SEER
45.2 MBH Heating. Minimum SEER 15.2)
2. Furnish and install new 36” x 2.5” inch slot diffuser, connected to supply air duct and install manual damper. Install this air curtain slot diffuser above door outside booth.
3. If water line is relocated and ran on top of primary booth canopy, main hot water supply and return lines must be ran in steel and branches may be ran in copper to each unit.
4. All grounding rods and cabling shall be re-installed on new rooftop units.
5. Extend hot water supply and return lines from under the canopy through the canopy and connect to the new hot water coils that are part of the new rooftop package units.
Install circuit setter or flow control valve, to limit the flow to each hot water coil to 4 GPM. Install new full port ball valves, pressure gauges and y type water strainers for each of the new twelve hot water coils. All new lines shall be insulated and sealed (Insulation Jacket) including the new isolation valves and flow control valves.
6. All roof penetrations for all work shall be covered using appropriate methods. Roofing work shall be accomplished by an authorized roofing contractor and must be approved by the GSA Project Manager. (See Exhibit 8.15.1)
7. All new rooftop package units shall have factory supplied hail guards and coating on the condensers for harsh environment. Install new roof curbs supply and return ducts, registers dampers and grills. Duct work shall be insulated inside the duct work.
8. New equipment shall have new electrical disconnects, twelve (12) each-roof within 3 feet of the unit.
9. All indoor units shall have wired thermostats. A 4 hour wind up timers shall be integrated with the wired thermostat.
10. Install new condensate piping and pipe to nearest drain.
11. Control wires and electrical service between the outdoor unit, wind up timer and thermostat shall be in conduit.
12. Furnish and install new circuit breakers in existing panels for new package rooftop units.
13. Provide new two (2) each minimum 12,500 B.T.U. 115 Volt portable temporary cooling units to be used for temporary cooling. At the completion of the project, temporary cooling units shall be turned over to GSA for ownership.
14. Installation hours are between Midnight thru 8:00 A.M. Seven days a week, no more than 2 booths A/C shall be removed at any given time.
15. Not on the BAS
TX0948 – Border Patrol Building
1. Remove existing roof top units, five (5) each, and dispose of properly, Three (3) 10 ton units, one (1) 5 ton and one (1) 3 ton unit. Demolition to include, but not limited to:
cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories. 5 ton and 3 ton unit shall have hot water lines cut and capped on the roof.
2. Air handlers, three (3) each located in mechanical room to be removed and disposed of properly. Heating ductwork in mechanical room to be capped off, hot water lines leading to hot water coils inside air handlers to be removed and capped off.
3. Existing ductwork shall remain in place and operational. Contractor shall inspect existing ductwork entering the building through the roof for rust and/or damage once the unit has been removed. Repair/replace as necessary.
1. Contractor shall furnish and install the following:
a. One (1) 3 ton package unit, equal to or better than 20 SEER rating. Equal to or better than Trane Model # T/YZC036E3
b. One (1) 5 ton package unit, equal to or better than 19.5 SEER rating. Equal to or better than Trane Model # T/YZC060E3
c. Three (3) each 10 ton package units; units shall meet the highest SEER rating with a minimum rating of 12.4 EER. Equal to or better than Trane Model #T/YHC120F3
2. Install new rooftop units, provide new condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Units shall include low ambient kit, and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Contractor shall run wires using EMT conduit, unless otherwise approved.
4. Contractor shall install new, appropriate size disconnects for new rooftop units.
5. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
6. Install all conduits using compression type fittings.
7. Contractor shall run new gas line, properly sized, to new installed rooftop units. All gas lines shall be properly supported in the roof with appropriate line supports. (See Exhibit 8.37.1)
8. Contractor shall prime, paint gas line yellow, and label NATURAL GAS LINE.
9. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters to ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor. (Submit your proposed roofing contractor for review and approval)
10. Existing inside ductwork shall be re-used with new unit.
11. New equipment shall use MERV 8 filters, as a minimum.
12. Existing HVAC units are connected to the Building Automated System (BAS).
Contractor shall ensure that new units include BACnet communication interface and are connected to the BAS.
13. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
14. Contractor shall install new appropriate size disconnects for all rooftop units.
15. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
TX0972 – Ysleta, Building A
1. Remove existing rooftop units five (5) each, and dispose of properly, Two (2) 5 ton units, One (1) 8 ½ ton unit, One (1) 12 ½ Ton unit and One (1) 20 Ton Unit.
Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
1. Contractor shall furnish and install the following:
a. Two (2) 5 ton package units, equal to or better than 19.5 SEER rating. Equal to or better than Trane Model # T/YZC060E3
b. One (1) 8 ½ ton package unit, equal to or better than 13.8 SEER rating.
Equal to or better than Trane Model # T/YSC102F3
c. One (1) 12 ½ ton package unit, equal to or better than 13.4 SEER rating.
Equal to or better than Trane Model # T/YZ150F3
d. One (1) 20 ton package unit, equal to or better than 12.2 SEER Rating.
Equal to or better than Trane Model # TS240F3
2. For new rooftop units, provide new condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Units will include low ambient kit and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Contractor shall use existing gas line. New installed gas lines shall match existing gas lines. (Black Pipe) Lines shall be primed, painted gas line yellow.
and labeled NATURAL GAS LINE.
4. All gas lines shall be properly supported on the roof with appropriate line supports.
5. Contractor shall run wires using EMT conduit, unless otherwise approved.
6. Contractor shall install new, appropriate size disconnects for new rooftop units.
7. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
8. Install all conduits using compression type fittings.
9. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters. Ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor.
(Submit your proposed roofing contractor for review and approval.)
10. Existing inside ductwork shall be re-used with new unit.
11. New equipment shall use MERV 8 filters, as a minimum.
12. Existing HVAC units are connected to the Building Automated System (BAS). Contractor shall ensure that new units include BACnet communication interface and are connected to the BAS. Update the existing BAS graphics page to reflect new unit and install the additional points.
13. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
14. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
15. Label each new unit with same unit identification number and with 2 inch black lettering. This can be accomplished with painted stencil or weather proof laminate label.
TX0972 – Ysleta, Building A, Room A106
A. New Work
1. Contractor shall furnish and install One (1) each 3 Ton mini-splits rated at a minimum of
20 SEER. Equal to or better than Trane Model number for indoor unit #4MUC4536A10NOA. Trane Model Number for Outdoor unit #4TUK4534A10NOA
2. New condenser will have wind baffles and set on top of manufactures approved pad.
3. Contractor shall run wires using EMT conduit, unless otherwise approved.
4. Contractor shall furnish and install new dedicated circuit breakers in existing electrical panel for new split system unit.
5. Contractor shall install hardwired thermostat. Thermostat wire shall be run in EMT.
6. 4-way lay in cartridges shall be installed in the middle of the office space; refrigerant lines shall be ran through ceiling, out of site to condenser outside.
7. Contractor shall seal/chalk wall penetrations accordingly.
8. Contractor shall use fire rated sealant/chalking if penetration is done through fire rated walls.
9. New equipment shall have new electrical disconnects, one (1) each- outside within 3 feet of the unit. North-side wall of building A.
10. Contractor shall run condensate line to nearest drain line; condensate pump shall be used if necessary.
11. Surge protector shall be installed for each ductless mini-split.
12. Not on the BAS, not required
13. All exposed refrigerant lines shall be covered with metal flashing and painted to match building color.
TX0973 – Ysleta, Building B
1. Remove existing rooftop unit one (1) each and dispose of properly, One (1) 17 ½ ton unit. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
1. Contractor shall furnish and install one (1) 17 ½ ton package unit, equal to or better than 13.1 SEER Rating. Equal to or better than Trane Model # TZ210F3
2. Install new rooftop units, provide new condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Units shall include low ambient kit and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Contractor shall run wires using an EMT conduit, unless otherwise approved.
4. Contractor shall install new, appropriate size disconnects for new rooftop units.
5. All new rooftop package units may require new roof curbs and or roof curb adapters.
Ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor.
6. Contractor shall use existing gas line. New installed gas lines shall match existing gas lines. (Black Pipe) Lines shall be primed, painted gas line yellow.
and labeled NATURAL GAS LINE.
7. All gas lines shall be properly supported on the roof with appropriate line supports.
(Submit your proposed roofing contractor for review and approval.)
8. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
9. Install all conduits using compression type fittings.
10. Existing inside ductwork shall be re-used with new unit.
11. New equipment shall use MERV 8 filters, as a minimum.
12. Existing HVAC units are connected to the Building Automated System (BAS).
Contractor shall ensure that new units include BACnet communication interface.
Update the existing BAS graphics page to reflect new unit and install the additional points.
13. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
14. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
15. Label each new unit with same unit identification number and with 2 inch black
TX0964 – Building D A. Demolition
1. Remove existing rooftop units two (2) each and dispose of properly, One (1) 12 ½ ton unit and One (1) 25 Ton unit. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2. Existing ductwork shall remain in place and operational. Contractor shall inspect existing ductwork entering the building through the roof for rust and/or damage once the unit has been removed. Repair/replace as necessary.
a. One (1) 12 ½ ton Package unit, equal to or better than 13.4 SEER Rating.
Equal to or better than Trane Model # T/YZ150F3
b. One (1) 25 ton package unit, equal to or better than 11.7 SEER Rating.
Equal to or better than Trane Model # TS300F3
2. Install new rooftop units, provide new condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Unit shall include a low ambient kit and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Contractor shall run wires using EMT conduit, unless otherwise approved.
4. Contractor shall install new, appropriate size disconnects for new rooftop units.
5. Contractor shall use existing gas line. New installed gas lines shall match existing gas lines. (Black Pipe) Lines shall be primed, painted gas line yellow.
and labeled NATURAL GAS LINE.
6. All gas lines shall be properly supported on the roof with appropriate line supports.
7. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
8. Install all conduits using compression type fittings.
9. All new rooftop package units may require new roof curbs and or roof curb adapters.
Ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor.
(Submit your proposed roofing contractor for review and approval.)
10. Existing inside ductwork shall be re-used with new unit.
11. New equipment shall use MERV 8 filters, as a minimum.
12. Existing HVAC units are connected to the Building Automated System (BAS).
Contractor shall ensure that new units include BACnet communication interface and are connected to the BAS. Update the existing BAS graphics page to reflect new unit, economizer and install the additional points.
13. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
14. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
15. Label each new unit with same unit identification number and with 2 inch black
TX0979 – Truck Primary Lanes 8 each and TX0980 Truck Exit Booths 3 each.
1. Remove existing evaporative coolers eleven (11) each. Remove eleven (11) each window units located inside primary booths. Demolition to include, but not limited to:
cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
1. Contractor shall furnish and install eleven (11) each 2 Ton mini-splits rated at a minimum of 20 SEER. Equal to better than Trane Model number for indoor unit #4MUC4524A10NOA. Trane Model Number for Outdoor unit #4TUK4524A10NOA
2. Duct work shall be removed and caped off at the roof.
3. Supply air duct inside booth shall be removed, 4 way cartridge shall be installed.
4. Air curtain duct shall remain, (See EXHIBIT 8.59.1), and connected to Sub duct connection of 4 Way cartridges.
5. Relief duct shall remain in place but removed from inside booth area. Duct is to be used as fresh air intake, ducted in to the fresh air intake of 4 way cartridge.
6. Relief duct shall have barometric damper removed. (See Exhibit 8.59.1)
7. All new condensers will have wind baffles and set on top of manufactures approved pads.
8. Provide new two (2) each minimum 12,500 B.T.U. 115 Volt portable temporary cooling units to be used for temporary cooling. At the completion of the project, temporary cooling units shall be turned over to GSA for ownership.
9. New equipment shall have new electrical disconnects, eleven (11) each within 3 feet of the outdoor unit.
10. All units shall have condensate lines routed to the metal roof. This will require drilling a one (1) inch hole approximate 2 feet above the roof elevation. 1/2 inch copper hard drawn condensate line shall protrude the wall, protruding through the one (1) inch hole. Seal between water line and one (1) inch opening using appropriate caulking/sealant. Insect screen shall be installed at the end of the copper condensate line. P-trap shall be also installed.
11. Appropriate wall covers shall be installed with insulation where the window units are to be removed, Eleven (11) Ea. Cover shall be primed and painted to match the inside of the booth.
12. Install wired thermostats and 4 hour wind up timers. Thermostat wire and timer shall be run in EMT.
13. Not on the BAS, not required
14. Surge protector shall be installed for each ductless mini-split.
15. Current electric duct heater is 480 Volt, 3 phase 35 AMP. Existing window A/C 208 single phase, 15 AMP Utilize this electrical service to provide power to the new ductless mini-split system. A step down transformer along with appropriate size panel board with breakers will be required for electrical service to the new mini-splits, if 208 single phase power is inadequate for mini split voltage/amperage requirements.
16. Installation hours are between Midnight thru 8:00 A.M. Seven days a week, no more than 2 booths A/C shall be removed at any given time.
TX0705FH Fort Hancock L.P.O.E. Building A
1. Remove existing rooftop units Three (3) each and dispose of properly, One (1) RTU-
#3. 1 ½ ton unit and Two (2) 4 Ton units. RTU #1 and RTU #2 Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2. Remove one existing mini split system AC-#1
3. Existing ductwork shall remain in place and operational. Contractor shall inspect existing ductwork entering the building through the roof for rust and/or damage once the unit has been removed. Repair/replace as necessary.
B. New Work:
a. Two (2) each 4 ton package units with 18 KW electric heat, equal to or better
TZC048F3 19 SEER minimum
b. One (1) each 1½ ton package unit with 5 KW electric heat. Equal to or better than 13 SEER rating.
Equal to or better than Trane Model # 4WCC3018A1000A
c. One (1) 1 Ton mini split Heat pump/Wall cartridge. Equal to or better than 20 SEER rating.
Equal to or better than Trane Indoor Model # 4MXW8512A1 and Trane Outdoor Model # 4TXK8512A1
2. For new rooftop units, provide new condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Units will include low ambient kit and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Existing mini-split condenser stand may be used for new one, Contractor may choose to use new manufactures required stand.
4. Surge protector shall be installed for ductless mini-split.
5. Contractor shall run wires using EMT conduit, unless otherwise approved.
6. Appropriate sized breakers/panels must be installed per manufacture’s requirements.
7. Contractor shall install new, appropriate size disconnects for new rooftop units.
8. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
9. Install all conduits using compression type fittings.
10. All rooftop units shall have wired thermostats
11. New mini-split thermostat shall be installed in place where the original is installed.
12. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters. Ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor.
(Submit your proposed roofing contractor for review and approval.)
13. New condensate lines must be installed where original lines previously installed
14. Existing inside ductwork shall be re-used with new unit.
15. New equipment shall use 2 inch MERV 8 filters for rooftop units, as a minimum.
16. Label each new unit with same unit identification number and with 2 inch black lettering. This can be accomplished with painted stencil or weather proof laminate label.
17. Propane lines shall be removed and capped from roof penetration.
18. The existing electrical service to each rooftop unit and evaporative cooler is 208 volts single phase. New package units are 208 volts 3 phase. Three phase is available at this location. Contractor is responsible for providing the necessary electrical service, equipment, parts, material, breakers, panel boards required for these new units.
TX0706FH Fort Hancock Primary Booths (#1 and #2)
1. Remove existing Evaporative Coolers, two (2) each with piggy back heaters and dispose of properly. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2. Disconnect, cut and cap off water supply and propane lines to each unit. Demolition to include, but not limited to: insulation and hangers.
3. Remove all existing evaporative cooler and heater controllers inside booths.
B New Work
1. Contractor shall furnish and install two (2) each 3 Ton Package Units with 10 KW electric heat. Units shall be rated at a minimum 20 SEER. Equal to better than Trane Model TZC036E3.
2. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters. Ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor.
(Submit your proposed roofing contractor for review and approval.)
3. All new rooftop package units shall have factory supplied hail guards and coating on the condensers for harsh environment. Install new roof curbs supply and return ducts, registers dampers and grills. Duct work shall be insulated inside the duct work. Duct work (Supply and Return) shall be appropriate size.
4. Contractor shall run wires using EMT conduit, unless otherwise approved.
5. Appropriate sized breakers/panels must be installed per manufacture’s requirements.
6. Contractor shall install new, appropriate size disconnects for new rooftop units.
7. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
8. Install all conduits using compression type fittings.
9. Air curtain duct shall remain and connected to supply air duct. Install manual adjustable damper
10. Condensate lines shall be connected to existing condensate lines on roof.
Page
11. New equipment shall have new electrical disconnects, Two (2) each within 3 feet of the outdoor unit.
12. Install wired thermostats and 4 hour wind up timers. Thermostat wire and timer shall be run in EMT.
13. Label each new unit with same unit identification number and with 2 inch black lettering. This can be accomplished with painted stencil or weather proof laminate label.
14. The existing electrical service to each rooftop unit and evaporative cooler is 208 volts single phase. New package units are 208 volts 3 phase. Three phase is available at this location. Contractor is responsible for providing the necessary electrical service, equipment, parts, material, breakers, panel boards required for these new units.
OPTION #1- MARFA HVAC REPLACEMENT
Project Locations:
TX0521MF, Building A, Administration Building
Marfa, TX 79843
TX0522MF, Building B, Repair Garage Building
SCOPE OF WORK
The Contractor shall provide all material, labor, tools, equipment and supervision, necessary to complete demolition and installation of the following scope of work.
TX0521MF – Building A, Administration Building
1. Remove existing Rooftop Units, Six (6) each and disposed of properly.
Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2. All HVAC equipment not included in the demolition notes and not within project footprint shall remain in place and operational.
B. New Work
1. Contractor shall furnish and install five (5) each 5 Ton package rooftop units equal to or better than 19.5 SEER rating. (Equal to or better than Trane Model
#YZC060E3)
2. Units will include low ambient kit and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. All new rooftop package units shall have factory supplied hail guards. Install new roof curbs supply and return ducts.
4. Existing inside ductwork shall be re-used with new unit.
5. All Rooftop units shall have wired thermostats.
6. Provide new five (5) each minimum 12,500 B.T.U. 115 Volt portable temporary cooling units to be used for temporary cooling. At the completion of the project, temporary cooling units shall be turned over to GSA for ownership.
7. Contractor shall run thermostat wire using EMT conduit, unless otherwise approved.
8. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
9. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters to ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal (Seamless). Any roof penetration or modification must be accomplished by an authorized roofing contractor. (Submit your proposed roofing contractor for review and approval.)
10. New equipment shall use MERV 8 filters, as a minimum.
11. Contractor shall install new appropriate size disconnects for all rooftop units.
12. Contractor shall run wires using EMT conduit, unless otherwise approved.
13. Contractor shall ensure electrical panel is balanced properly on all phases.
Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
14. Contractor shall use existing gas line. New installed gas lines shall match existing gas lines. (Black Pipe) Lines shall be primed, painted gas line yellow.
and labeled NATURAL GAS LINE.
15. All gas lines shall be properly supported on the roof with appropriate line supports.
16. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
17. If inadequate electrical capacity at the main breaker panel is not available, installation of a sub electrical panel shall be installed.
18. Not on the BAS, not required
TX0521MF- Building A, New Work/New Equipment for Command Center, Office #109, #109A, #110A, #107 and #117
A. New Work
1. Contractor shall furnish and install ONE (1) each 1 ton mini-split (Heat Pump) rated at a minimum of 25 SEER. Equal to or better than Trane Model Number for indoor unit #4MXW2712A10N. Trane Model Number for Outdoor unit #4TXK2712A10N. Office #109A, Closet
2. Contractor shall furnish and install TWO (2) each 3 Ton mini-split (Heat Pump) rated at a minimum of 16 SEER. Equal to or better than Trane Model number for indoor unit # 4MXW8536A1. Office #110A
3. Contractor shall furnish and install one (1) each 3 Ton mini-split (Heat Pump) rated at a minimum of 20.50 SEER. Equal to or better than Trane Model number for indoor unit # 4MXW8518A10N0A. Trane Model Number for Outdoor unit # 4TXM6536A1040A No Electric Heat, Two (2) each. Indoor wall mount units shall be installed in Office #107 and 107A
4. Contractor shall furnish and install one (1) each 2 Ton mini-splits (Heat Pump) rated at a minimum of 20.50 SEER. Equal to or better than Trane Model number for indoor unit #4MUC4524A10N0A. Trane Model Number #4TUK4524A10N0A for Outdoor unit. No Electric heat, One
(1) each. Office #117
5. All existing duct work leading to Office #117 shall be capped off and sealed.
6. Cassette indoor units shall be placed accordingly.
7. Wall mount indoor units shall be hung accordingly.
8. New condenser will have wind baffles and set on top of manufactures approved pad.
9. Contractor shall run wires using EMT conduit, unless otherwise approved.
10. Contractor shall furnish and install new dedicated circuit breakers in existing electrical panel for new split system unit.
11. Contractor shall install hardwired thermostat.
12. Contractor shall run thermostat wire using EMT conduit, unless otherwise approved.
13. Contractor shall seal/chalk wall penetrations accordingly.
14. Contractor shall use fire rated sealant/chalking if penetration is done through fire rated walls.
15. New equipment shall have new electrical disconnects, outside within 3 feet of the unit.
16. Contractor shall run condensate line to nearest drain line; condensate pump shall be used if necessary.
17. Surge protector shall be installed for each ductless mini-split.
TX0522MF – Building B Repair Garage Building
1. Remove existing roof top units, two (2) each, and dispose of properly. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
1. Contractor shall furnish and install two (2) each 5 ton package unit, equal to or better than 19.5 SEER rating. Equal to or better than Trane Model #
YZC060E3.
2. Install new rooftop units; provide new condenser coil guards (Hail Guards). Units shall include low ambient kit and barometric relief damper mounted in return duct.
New rooftop units shall include an economizer cycle.
3. Contractor shall run wires using EMT conduit, unless otherwise approved.
4. Contractor shall install hardwired thermostat.
5. Contractor shall install new, appropriate size disconnects for new rooftop units.
6. Contractor shall ensure electrical panel is balanced properly on all phases.
Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
7. Install all conduits using compression type fittings.
8. Contractor shall run new properly sized gas line to unit #8. New shut off valves shall be installed next to unit. All gas lines shall be properly supported in the roof with appropriate line supports. Contractor shall use existing gas line.
New installed gas lines shall match existing gas lines. (Black Pipe) Lines shall be primed, painted gas line yellow, and labeled NATURAL GAS LINE.
9. All new rooftop package unit(s) may require new roof curbs and or roof curb adapters to ensure proper installation in accordance with the manufactures recommendation to ensure correct leak proof seal (Seamless). Any roof penetration or modification must be accomplished by an authorized roofing contractor. (Submit your proposed roofing contractor for review and approval)
10. Existing inside ductwork shall be re-used with new unit.
11. New equipment shall use MERV 8 filters, as a minimum.
12. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
13. Contractor shall install new appropriate size disconnects for all rooftop units.
14. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
15. Contractor shall install Supply and return air ducts in Offices #106 and #104.
16. Duct work (Supply and Return) shall be appropriate size.
17. Not on the BAS, not required
TX0522MF – Building B-Repair Garage Building, New Work Office #102 and #101 A. New Work
1. Contractor shall furnish and install one (1) each 1 1/2 Ton mini-split (Heat Pump) rated at a minimum of 20 SEER. Equal to or better than Trane Model number for indoor unit #4MUC4518A10NOA. Trane Model Number for Outdoor unit #4TUK4518A10NOA. No Electric heat, One (1) each.
Office #101
2. Contractor shall furnish and install one (1) each 1 1/2 Ton mini-split (Heat Pumps) rated at a minimum of 21 SEER. Equal to or better than Trane Model number for indoor unit #4MXW2718A10N. Trane Model Number for Outdoor unit #4TXK2718A10N. No electric heat, One (1) each. Office #102
3. Cassette indoor units shall be placed accordingly.
4. Wall mount indoor units shall be hung accordingly.
5. New condenser will have wind baffles and set on top of manufactures approved pad.
6. Contractor shall run wires using EMT conduit, unless otherwise approved.
7. Contractor shall furnish and install new dedicated circuit breakers in existing electrical panel for new split system unit.
8. Contractor shall install hardwired thermostat.
9. Contractor shall run thermostat wire using EMT conduit, unless otherwise approved.
10. Contractor shall seal/chalk wall penetrations accordingly.
11. Contractor shall use fire rated sealant/chalking if penetration is done through fire rated walls.
12. New equipment shall have new electrical disconnects, outside within 3 feet of the unit.
13. Contractor shall run condensate line to nearest drain line; condensate pump shall be used if necessary.
14. Existing duct work, supply and return shall be capped of in offices #101 and #102.
15. Surge protector shall be installed for each ductless mini-split.
16. Reconnect gas line, in the vehicle garage, from the branch to the main line currently used for rooftop unit.
17. Sub electrical panel shall be installed in generator/electrical room for new mini splits.
SPECIAL INSTRUCTIONS
1. Contractor shall perform the following Mechanical work in accordance with the latest International Mechanical Code and NEC Standards.
2. To maintain roof manufacturer’s warranty, any required new roof penetrations shall be performed by a roofer certified by the manufacturer to perform roof work. All certifications shall be provided by roofer prior to performing any work. After completion of work, roofer shall provide a certificate by manufacturer stating all warranties remain valid.
3. Contractor shall patch and paint all openings and penetrations made as a result of the work required on this SOW.
4. All piping, including electrical conduit, shall be run behind walls and/or ceilings whenever possible. If piping cannot be concealed, Contractor shall paint it to match wall and/or ceiling color.
5. Unit downtime shall be kept to a minimum.
6. Temporary spot coolers shall be placed in areas where equipment downtime is longer than one day.
7. Contractors shall submit proposal with a detailed cost breakdown. Cost Breakdown shall be submitted in CSI Master Format 2010. Proposal shall include make and model of all proposed equipment.
8. Contractor shall provide a minimum of 4 hours of training to GSA maintenance personnel.
9. Contractor shall provide a complete commissioning report to GSA PM with completed close out documents once all units are fully functional. All adjustments to the systems shall be in accordance with manufacturer’s specifications.
10. Contractor will be responsible to request and furnish all required overhead and/or road blocking permits from the City and/or electrical/utility providers when using a crane at this location.
11.
MATERIAL TECHNICAL SPECIFICATIONS
Where a particular manufacturer's product is specified, it is not intended to discriminate against other manufacturer's which are equal in quality of material, workmanship, appearance and function to those specified. Rather, it is intended to establish and indicate the desired standard of quality. If any tests are required to determine the equality of any substitutes, such tests shall be made by an independent authority as approved by the government. All expenses related to proposed substitutions shall to be paid by the Contractor. Proposed items are to be submitted with the bid and shall be a basis for the award of the contract.
All materials and equipment shall bear evidence of the Underwriter's Laboratories Inc. Label (UL) or approval of other nationally recognized independent testing organizations adequately equipped and competent to perform such services when these standards are required and such product listing is available.
Integration Technician: Integration technician performing installation shall be certified on the Niagara AX JACE for both installation and maintenance of the system and shall have a minimum of 3 years’ experience performing the required tasks. The Contractor shall provide with their offer the integration technician’s resume and certification documentation. Additionally the programmer must apply for and receive clearance in accordance with Homeland Security Presidential Directive 12 (HSPD-12) to perform their duties on the GSA secured network.
PRODUCT DATA AND SAMPLES
Product Data: Contractor shall submit one electronic set of rooftop units, mini-split and all new equipment.
Provide catalog sheets, brochures, performance charts or other standard descriptive data provided by any Subcontractor, supplier or distributor. Product Data must be certified by the Contractor stating that it was reviewed and approved. Product to be used must be highlighted on the data sheet by the Contractor.
Product Data used for construction must bear GSA’s stamp certifying final review and approval. No product shall be used that does not bear such stamp. Submittals shall be identified on a submittal register provided by the Contractor and transmitted using a transmittal letter.
Samples: Contractor shall submit physical samples establishing standards by which completed work is judged. Samples shall indicate color range, functional characteristics and shall represent exact material to be used on the project.
SECURITY CLEARANCE REQUIREMENT
All contractor personnel performing working on premises at GSA owned and operated buildings are required to pass a security background check conducted by the Department of Homeland Security/Federal Protective Service. No contractor employee will be allowed to perform work on the building premises until employee has been determined to be suitable for hire by the Department of Homeland Security/Federal Protective Service.
Special CBP Requirements: In addition to the GSA security check, on all Customs and Border Protection facilities, an additional security check of all individuals entering the facility will be performed by Customs and Border Protection. The information required is Full Name, Date of Birth and Last 4 Digits of their Social Security Number. This information must be submitted to the Project Manager a minimum of 72 hours prior to entering the secured areas of the facilities for any reason. This includes all pre-bid and pre-construction meeting as well as all employees of the Contractor awarded the project.
WORKING HOURS
Work not impacting normal building occupancy shall be performed during normal business hours Monday through Friday 6:00 am to 6:00 pm unless the hours are specifically addressed by site location.
Work performed under this Contract shall be performed during normal working hours of the building occupants and shall not interfere with the operations of the building. Any work that may disrupt the building tenants shall be scheduled at times other normal duty hours. Note: Expect work involving a crane to be done after hours or on weekends.
GSA Standard Form 139 will be posted at an agreed upon location at the job site. All personnel employed on the job site shall sign in daily upon arrival at the job site and sign out upon leaving. The Contractor shall submit such log to the GSA On-Site Representative each Monday for the preceding week.
Contractor shall submit a list of the personnel that will work on this project to the Project Manager (PM), Contracting Officer’s Representative (COR), and Contracting Officer (CO). Personnel list shall include name, date of birth and last four digits of social security number of each person.
PERIOD OF PERFORMANACE
All work shall be completed within 120 calendar days after equipment delivery and issuance of the full Notice to Proceed (NTP). A partial NTP will be issued to place the order on the equipment upon approved submittals.
PROJECT SCHEDULE
Contractor shall submit to the GSA Project Manager a project schedule within thirty (30) days of the Partial Notice to Proceed. The project schedule shall include a written narrative describing the major work activities, activities critical path and major constraints underlying the sequence and logic, all tasks to be performed under this project, duration of each task and tentative date/s each task will be performed. Project schedule must be approved by the GSA Project Manager prior to performing any work under this project. The project schedule shall incorporate milestone events specifics in the Contract, including as applicable NTP, Substantial Completion and milestones related to specific work phases and site restrictions. The project schedule shall also include Contractor-defined milestones to identify target dates for critical events, based upon the Contractor’s chosen sequence of work. Microsoft Project or other similar format can be used for this schedule.
EXTENSION OF TIME
If the Contractor requests an extension of the time for Substantial Completion, the Contractor shall base its request on analysis of time impact using the Project Schedule as its baseline, and shall propose as a new Substantial Completion date to account for the impact. The Contractor shall submit a written request to the Contracting Officer setting forth facts and analysis in sufficient detail to enable the Contracting Officer to evaluate the Contractor’s entitlement to an extension of time. (See Section III.E. Extensions of Time in the Agreement)
GENERAL CONSTRUCTION REQUIREMENTS
1. Keep work areas clean on a daily basis.
2. Remove debris from site on a daily basis.
3. Protect all existing walls and furniture from damage.
4. Contractor…