About this file

Attached Notification / Clarification for Synopsis-Solicitation GS06P12GZD0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-E IDIQ GS-06P-12-GZ-D-0001

ATTENTION OFFERORS – FOR INFORMATIONAL PURPOSES ONLY 1 of 1

ATTENTION OFFERORS – FOR INFORMATIONAL PURPOSES ONLY DATED: 10/26/11

The Bannister Complex mailroom supervisor has notified GSA that due to a labor strike by a tenant on the complex, UPS is experiencing delays in package deliveries to all tenants at Bannister.

Currently, this could only affect UPS deliveries.

Offerors are reminded that proposals are due by November 3, 2011 at 3:00 pm (CST). Packages that are received after that date/time will be considered late. It is the responsibility of the firm responding to this synopsis to ensure that packages are on time. A delay by the carrier is not an acceptable excuse for late submissions.

CLARIFICATION:

Minimum Submission Requirements

1) A completed, current Standard Form 330, "Architect-Engineer Qualifications", and a completed, current Standard Form 330 for each proposed consultant. Interested firms with more than one (1) office must indicate on their SF 330 the staffing composition of the office in which the work will be performed.

Indicate the solicitation number in block 3, on the SF 330. The completed SF 330 should indicate the specific personnel from the responding firm and all consultants expected to do the work on this contract, with resumes for each, professional registrations by state, and experience in this type of work over the past six (6) years. The projects listed in Section F shall be at least “similar” to the projects required by section “Evaluation Criteria, 1) Past Performance and design, b) Similar Projects” of this solicitation. Projects included in this section may be greater in construction dollar value.

A separate fully executed SF 330 is not required for each consultant. Prime firm/joint venture will submit a fully executed SF 330 that will include Section E—Key Personnel. Section E shall include all key personnel (including consultants) that are part of the proposed team.

File details come from the government source that posted it. Updated .