AEI-Q A_(Round_3).pdf
PDF 82 KB Posted
- Attached to
- NATIONAL ARCHITECT-ENGINEER-INTERIORS (A/E/I) IDIQ CONTRACT Federal contract opportunity
- Solicitation number
- GS-05P-15-SI-D-0052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| National_Architect_060916.docx | DOCX document | |
| Short_Listed_Firms_AEI_IDIQ.pdf | ||
| Amendment_005_-_091515.pdf | ||
| Amendment_004_-_082415.pdf | ||
| Amendment_003_-_081915.pdf | ||
| AEI-Q A_(Round_2).pdf | ||
| Amendment_002_-_080615.pdf | ||
| Appendix_1_-_Metropolitan_Statistical_Areas.pdf | ||
| Amendment_001_-_073015.pdf | ||
| AEI-Q A_(Round_1).pdf | ||
| SF330-13a.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Architect Architect/Engineer/Interiors IDIQ Contract
Questions and Answers (Round 3)
1. Our interpretation of the requirements for Section C in Amendment II is that you are requesting that we list our 6 proposed team members; however, typically the Section C features Firms, not specific people. For example, we have seven offices that align with the GSA Regional Cities so we would list one prime office and six branch offices in the Section C. We would also include a separate SF 330 Part II for each office. Is this how we should approach this solicitation?
Answer: You may list branch offices but they must be considered part of your organization for business purposes.
2. From Amendment II, we understand that the entire package cannot exceed 60 pages. Regarding the portfolio, should additional Lead Designer materials be included as an appendix (still within the allowable 60 pages) or should we include it within the SF330 Section H?
Answer: Please see Instructions on the SF330, Section H.
3. Do all professionals have to be LEED accredited?
Answer: Professionals should have the appropriate qualification / accreditation for their position.
4. Is it required that at least one professional has worked on each of the 5 projects for section F?
Answer: Yes.
5. Please confirm that the Amendment 002, page 1 direction is:
Portfolio has a total page count of 60 pages (30 sheets, 2 sided) inclusive of all content including
SF330.
Covers and tabs are excluded from the page count.
Answer: The entire assembled content should be no more than 30 pages double sided (60 sides, minimum margins of 1”, and minimum font size of Arial 10 point). The page count does not include covers, tabs, and the table of contents
6. Will the government issue an extension to the due date for the submission of Stage 1?
Answer: No.
7. Are covers, tabs and the table of contents to be counted as part of the page count of 60 single sided pages?
Answer: See response to question 5.