Heat Exchangers Replacement Project, JCK Federal Building, EMD Courthouse, Chicago, Illinois
Solicitation number
GS05P08SIC0092
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0002.pdf PDF
RIL00116-Sheet3of9(M-101).dwf DWF file
RIL00116-Sheet1of9(G-001).dwf DWF file
RIL00116-Sheet7of9(M-105).dwf DWF file
RIL00116-Sheet2of9(H-401).dwf DWF file
RIL00116-Sheet6of9(M-104).dwf DWF file
RIL00116-Sheet9of9(M-601).dwf DWF file
Amendment 0001.doc.dot DOT file
RIL00116-Sheet8of9(M-501).dwf DWF file
RIL00116-Sheet4of9(M-102).dwf DWF file
RIL00116-Sheet5of9(M-103).dwf DWF file
Solicitation GS05P08SIC0092.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 07/28/08 RIL00116

6. ISSUED 7. ADMINISTERED BY (If other than Item 6)

General Services Administration Office of Tenant Operations , 230 S. DEARBORN STREET, RM 3180, DPN 31-4

CHICAGO, IL 60604

General Services Administration Office of Tenant Operations

230 S. DEARBORN STREET, RM 3180 DPN 31-4

CHICAGO, IL 60604

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (?) 9A. AMENDMENT OF SOLICITATION NO.

GS05P08SIC0092

X 9B. DATED (SEE ITEM II)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(?) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GS05P08SIC0092 – Heat Exchanger Replacement, JCK Federal Building, & US Dirksen Courthouse, Chicago, IL

This amendment is being issued change the proposal due date from Friday, August 1, 2008, 4:00 PM, to Friday, August 15, 2008, 4:00 PM (central time). Also, attached are the minutes from the pre-proposal conference.

Except as provided herein, all terms and conditions of the document reference in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY ________________________________________________________

(Signature of Contracting Officer)

5PMC COMPUTER GENERATED FORM STANDARD FORM 30 (10-83)

MINUTES OF PRE-PROPOSAL CONFERENCE

PROJECT: GSA – Heat Exchanger Replacement JCK Federal Building, EMD US Courthouse, Chicago

DATE: July 18, 2008, 10:00 AM

PLACE: 230 S. Dearborn, Room 240, Chicago, IL

PRESENT: See attached sign- in sheet

The following items were discussed:

1. Contracting Officer Deborah Durkins distributed copies of the written agenda for the meeting (see attached copy). All items in this agenda were discussed at the beginning of the meeting.

2. In addition to the material in the agenda, the following items were discussed:

a. An amendment is being prepared which will add five (5) domestic water heat exchangers and one pre-heat/reheat in the JCK Building. A domestic water piping spec. will be added. The bid due date may need to be extended to accommodate this change.

b. The 180 day completion time begins when all security clearances have been completed.

c. Construction will begin in March of 2009, beginning with replacement of electrically heated equipment which does not require boiler shut down, and continuing in mid-May of 2009 with the remainder of the work which requires boiler shut down.

d. There is one existing heat exchanger on the P level for which there is no existing data. The replacement for this unit will have to be sized based on unit dimensions and pipe size(s).

e. Shop drawings can be prepared and reviewed upon award of contract. This does not need to wait until March of 2009.

f. In response to a question from a Contractor, it was stated that there are no ACM’s (Asbestos Containing Materials) in the Kluczynski Building.

GSA – Heat Exchanger Replacement JCK Federal Building – EMD US Courthouse, Chicago, IL July 18, 2008

g. In response to an additional question from a contractor, the following was stated:

1) The asbestos abatement has already been designed and is reflected on the drawings and in the specifications.

2) The Asbestos Abatement Action Plan to be submitted by the Contractor should indicate the route through which ACM’s will be removed from the building and all other items spelled out in specification section 02085 paragraph 2.1.B. Phil Ramos is GSA’s Asbestos Abatement Expert who will sign off on the Contractor’s Asbestos Abatement Action Plan.

h. The question of tube side valves being replaced (or not replaced) will be addressed in the Amendment.

i. The A/E will attempt to approximately quantify the chemical restoration required by the drain down to facilitate heat exchanger replacement in the EMD Building. (There are no chemicals in the JCK Building).

j. EMD Maintenance Personnel will look up the Chemical Supplier (Earthwise?)

to see if they know quantities of chemicals needing to be restored after drain down.

k. The minutes of this meeting will be sent to Deborah Durkins who will post them on the GSA website.

l. The heat exchangers will be replaced in both buildings concurrently to facilitate completion of the project in one non-heating season.

m. Consideration will be given to adding steam control valve replacement and fiberglass pipe insulation replacement (in EMD) as options.

This summary constitutes the writer’s understanding of the basic matters discussed and the conclusions reached. The participants are requested to review the preceding and notify Frega Associates in writing within ten (10) working days of receipt of these minutes of any exceptions. In the absence of such notice, these minutes will be considered accurate.

Respectfully submitted, Frega Associates, Ltd.