Statement of Work for Comprehensive Repair of Cast-In-Place Concrete Parking Deck at Chamblee IRS Annex Parking Deck Chamblee, Georgia

PROJECT IDENTIFICATION:

Project Name:
Comprehensive Repair of Cast-In-Place Concrete Parking Deck
Project Number:
VGA00039
Region:
Region 4, Southeast Sunbelt Region
Building Name:
IRS Annex Parking Deck
Building Address:
2385 Chamblee Tucker Road, Chamblee, Georgia
Building Number:
GA0010AE
SOW Revision No:
1 (July 14, 2015)
Scope for the Comprehensive Repair of Parking DeckPage 2 of 17July 14, 2015
Chamblee IRS Parking Deck – Chamblee, GARevision #1

TABLE OF CONTENTS

1.PROJECT DESCRIPTION3
A.PROJECT TYPE3
B.PROJECT GOALS AND OBJECTIVES3
C.EXISTING CONDITIONS3
2.PROJECT REQUIREMENTS & SERVICES4
A.Repairs & Construction Documents Issued For Construction (IFC)4
1.Structural Repair Drawings4
2.Structural Repair Specifications4
3.Foundation & Geotechnical Requirements5
B.Additional Work & Requirements5
1.Landscaping5
2.Precast Panel Corner Expansion Joints5
3.Coordination of Inspections, Testing & Construction Administration5
4.Other Work5
3.GENERAL REQUIREMENTS6
A.CODES & STANDARDS OF PRACTICE6
B.GENERAL CONDITIONS & CRITERIA6
C.GENERAL STRUCTURAL CRITERIA6
D.QUALITY CONTROL9
E.SAFETY9
F.SUBSTITUTIONS & ALTERNATES9
4.ADMINISTRATION & GENERAL PROVISIONS11
A.CONSTRUCTION / REPAIR OPERATIONS11
B.GENERAL PROVISIONS11
C.DOCUMENT CONTROL12
D.SECURITY REQUIREMENTS14
E.TURNOVER PROCESS14
F.PERIOD OF PERFORMANCE & SCHEDULE15
G.COSTS15
H.FEES AND PAYMENT16
5.APPENDICES17

PROJECT DESCRIPTION

This Scope/Statement of Work (SOW) is issued by the Public Buildings Service of the United States General Services Administration (GSA), Southeast Sunbelt Region - (Region 4), Atlanta, GA, hereinafter referred to as the “Government”, to obtain Construction Services from a Construction Contractor (Contractor) who shall be singularly responsible to satisfy the terms of the resulting contract.

The existing parking deck at the IRS Atlanta Service Center requires the repair of numerous existing structural & non-structural components, including but not limited to, repair & strengthening of the elevated slabs, select columns, Concrete Masonry Unit (CMU) stair well walls, addition of new steel frame & supporting shallow foundations to support for the cantilevered slab along the North & South elevations, addition of multiple full height cast-in-place (CIP) concrete shear walls with supporting foundations, replacement of separation joints, repair of all cracks, spalls & other concrete surface defects, addition of new skid resistant topping and all other serviceability and strength issues as outlined in this Scope of Work (SOW) and the structural repair drawings, specifications & soil reports referenced below & including appendix #A1 & #B2 in section #5.

PROJECT TYPE

This project will be awarded as a Firm Fixed Price contract. The contract amount is a Lump Sum Cost to complete the work. Additional repairs over the quantity indicated within the SOW will be based on a fixed cost for each additional repair type, (spall, repair lineal foot of crack, etc…), and must be included in the proposal.

PROJECT GOALS AND OBJECTIVES

The goals and objectives of this project are to permanently & properly repair all structural & non-structural components of this parking deck, while minimizing the loss of parking spaces during the repairs. See the Project Requirements and Services section and all other locations within this SOW in order to help facilitate these goals and objectives and for additional requirements.

EXISTING CONDITIONS

The parking deck located at 2385 Chamblee Tucker Road, Chamblee, Georgia provides parking for the Internal Revenue Service (IRS) Annex. The parking deck is a three level cast-in-place (CIP) concrete parking structure that consists of the slab on grade with two elevated Post-Tension (PT) concrete slabs. The elevated slabs are supported by CIP concrete columns with drop panels. There are four primary stair wells enclosed by CMU walls. Five distinct sections of the parking deck will have their own lateral force resisting system, (concrete shear walls), and each section is separated by expansion joints that will be replaced as part of this project. The overall parking deck to be repaired includes the entire footprint of these combined sections which is approximately 358 feet x 242 ft. The CIP concrete parking deck was constructed around 1998 and select original construction documents will be available for the contractor selected.

PROJECT REQUIREMENTS & SERVICES

Contractor shall provide all supervision, labor and materials necessary to properly complete this project SOW. This scope is not intended to be all inclusive. It is the contractor’s responsibility to visit the site and include all work necessary to properly repair all items within this SOW.

The general requirements indicated in Section 3 of this SOW apply to all project phases and work to be performed that is indicated throughout this scope of work.

Work may have to be accomplished after hours or on the weekend at no additional cost to the US Government. See Section 4.A of this SOW below for additional information pertaining work hours, schedule, and other administrative and general provisions requirements.

All work & materials shall be furnished and installed by the Contractor.

Repairs & Construction Documents Issued For Construction (IFC) Perform all work and provide all materials, labor, supervision & quality control measures indicated in the following construction documents.

Provide unit prices for all repair items, for use in the event the quantities in the base scope need to be adjusted. Note, the unit prices provided in the proposal will be considered during the contractor selection process. See Section 4.G of this SOW for additional information.

Structural Repair Drawings Perform all work & all phases indicated in the IRS Parking Structure Repair Drawings, Dated 31-Aug-2012, referenced in Section #5 Appendix #A1 of this scope and indicated in the Specifications, Dated 31-Aug-2012, referenced in Section #5 Appendix #A2 of this scope, including the following modifications:

a. Any references to the excluded task items in the 2012 structural repair drawings are to be omitted or modified in accordance with section #2.A.2 of this scope of work.

b. The special inspection & testing agency required to perform inspections & testing per Chapter 17 of the International Building Code will be part of a separate Construction Administration (C/A) Services contract. The contractor is expected to coordinate all work requiring inspection with the inspection firm and C/A services team. Thus the cost associated with hiring an inspection & testing firm to perform special inspections in accordance with chapter 17 of the building code is outside this scope of work.

Structural Repair Specifications Perform all work & all phases indicated in the IRS Parking Structure Repair Specifications, Dated 31-Aug-2012, referenced in Section #5 Appendix #A2 of this SOW, including the following modifications:

a. Excluded Task Items:

Work associated with the following task items indicated in the specification, section #00300, page #3 (#00300-3) and elsewhere within the specification (Appendix #A2) & drawings (Appendix #A1) has already been completed. Thus this scope of work excludes work for the following task items:

· Task item #7.6 – Epoxy Injection at Concrete Stairs.

b. Modified Task Items:

A portion of the work associated with the following task items indicated in the specification, section #00300, page #3 (#00300-3) and elsewhere within the specification (Appendix #A2) & drawings (Appendix #A1) has already been performed. Thus modify select task items as follows:

· Task item #7.1- Crack Repair:

Modify the quantity indicated on specification page #00300-3 to 2,000 Lineal Feet (LF)

Foundation & Geotechnical Requirements Compact & prepare sub-grade and perform all associated work in accordance with the Geotechnical Evaluations Reports, dated 14-March-2012, referenced in Section #5 Appendix #A3 of this scope.

Additional Work & Requirements Perform all work and provide all materials, labor, supervision & quality control measures indicated in the following construction documents.

Provide unit prices for all repair items, for use in the event the quantities in the base scope need to be adjusted. Note, the unit prices provided in the proposal will be considered during the contractor selection process. See Section 4.G of this SOW for additional information.

Landscaping After the perimeter steel support frame their supporting foundations are installed and overall repair work is nearing completion; install landscaping (sod, plants, trees, etc.) at all areas disrupted by the construction around perimeter of the parking deck. The proposed replacement landscaping shall be provided to GSA for review and approval prior to installation. Information on the specific species of plants currently in place can be obtained from GSA. The final landscaping plan shall be a noticeable improvement over that currently in place.

Precast Panel Corner Expansion Joints Replace the expansion joints at the corners (where two precast concrete panels intersect & are perpendicular to each other), at each level.

Coordination of Inspections, Testing & Construction Administration The special inspection & testing agency required to perform inspections & testing per Chapter 17 of the International Building Code will be part of a separate Construction Administration (C/A) Services contract.

The contractor is expected to coordinate all work requiring inspection with the inspection firm and C/A services team. Likewise, the contractor is coordinate all work, submittals & associated C/A services with the C/A team. This does relieve the contractor of the responsibility to perform reviews of shop drawings, RFI’s & other C/A documents prior to submitting, nor does it relieve the contractor of the responsibility of implementing other safety & quality assurance programs and coordinating with all other construction administration services.

Other Work All other repairs/items indicated elsewhere within this SOW and in the drawings, specifications & soil reports referenced in appendix #A1 thru #B2 in section #5 below.

GENERAL REQUIREMENTS

The requirements set forth in this section apply to all project phases and work to be performed that is indicated throughout this entire scope of work.

CODES & STANDARDS OF PRACTICE

All work performed for this project must comply with material specific construction method standards of practice, building code requirements, and project specific Scope of Work (SOW) requirements. Use the latest edition of all standards, building codes and GSA standards.

Building Codes All work must comply with the governing local & state building code(s), and unaltered International Building Code (IBC), latest published edition.

Standards of Practice & Best Practices Any references to “Standards of Practice” indicated in this document are to be interpreted as the written standards & recommendations prepared by an International Code Council (ICC) Code recognized organization for an industry specific material or construction method. Standards of Practice must NOT be interpreted as an individual Company’s/Contractor’s verbal or written standard operating practices. All construction shall comply with written standards of practices & best practices.

Manufacture Requirements Materials & installation must comply with the manufacturer's recommendations, governing building code & appropriate ICC Code report.

Discrepancies Where any discrepancy occurs between the International Building Code, Local & state codes/amendments, the scope of work performance criteria, or any other referenced standard; the more conservative condition shall apply until written clarification is issued. Notify GSA immediately of any discrepancy.

GENERAL CONDITIONS & CRITERIA

These general conditions apply to all work performed. Select general conditions include, but are not limited to the following:

Component Interference Relocate all electrical conduits, piping or other components as necessary to avoid damaging during construction or where needed to avoid interference with the repaired installed condition.

Protection of Property Contractor is responsible for performing all work. Care should be taken to protect all non-affected areas. Work site shall be kept clean and neat at all times during business hours and the space shall be returned to the government for use each morning by 6:00 AM weekdays where occupied by federal employees.

Contractor is responsible for all damages to government property caused by him/her and their subcontractors. Contractor is responsible for all dimensions and quantities.

Any personnel involved in the construction & repair on site will be responsible for moving within the structure and protecting all vehicles and all tenant agency equipment during the course of the project.

Clean Up The Contractor shall provide final clean up after the project is complete.

GENERAL STRUCTURAL CRITERIA

The following general Select & Relevant (minimum) Requirements summaries a few general structural requirements pertaining to repairs or new construction to an existing structure. Nearly all of these requirements are required in accordance with the building code or other referenced standards. The select structural requirements indicated below are not intended to be all inclusive of merely a partial summary of relevant items that have been observed to be overlook or non-code compliant occasionally on previous project. These general structural requirements apply to all work performed. Select (minimum) general structural requirements include, but are not limited to the following:

General (Minimum) Structural Requirements

a. Field Verify all existing conditions.

b. The contractor is Solely Responsible for the design, adequacy & safety of erection bracing, shoring, temporary supports, etc. and all other coordination, sequencing, and construction means & methods.

c. Construction Materials shall be spread out if placed on framed levels. Loads shall not exceed the design live load per square foot indicated on the original structural drawings or International Building Code (IBC) Table #1607.1, whichever is less.

d. Any existing gravity load-carrying elements where an alteration causes an increase in the design gravity load or a reduction in the existing members’ capacity; the existing or altered member must be shown to be capable of supporting all applied load(s) in accordance with chapter #34 of the International Building Code (IBC) and in accordance with the governing state & local building codes or the existing member must be strengthened accordingly.

e. Do not use existing anchors or embeds to support new members except where approved in writing (signed & sealed) by the Contractor’s structural engineer with supporting analysis.

f. At all locations where post-installed anchors / inserts are to be installed; the specific anchor used must be capable of supporting all applied loads (including short-term loading), and designed, installed & inspected in accordance with the building code & the specific ICC Code Report.

g. Post-installed anchors/hangers must not interrupt existing reinforcing and comply with all code requirements.

h. Demolition, if any, of structural members must be done in accordance with the Contractor’s structural engineers written requirements.

i. When attaching to or drilling into existing concrete members; Do NOT interrupt or damage existing reinforcing bars, mesh or tendons contained with concrete members. Use Ground Penetrating Radar (GPR) or similar acceptable & approved non-destructive methods to located existing reinforcing bars.

j. Drilling “pilot holes” to determine the location of reinforcing shall NOT be permitted under any condition. The specific locations and width of reinforcing must be drawn directly on the concrete surface at the time of performing the GPR and drawn on the side to be drilled from. The GPR technician must provide GSA a copy of all GPR documentation indicating the specific location(s) investigated.

k. The contractor is Solely Responsible for ensuring that any new penetrations do not comprise the load carrying capacity of the structural slab/member.

l. The slab & structural framing system with the new penetration must be capable of supporting all applied loads and the designated design live load indicate on the building’s original construction documents, whichever is greater.

m. All steel members, plates, connections & other steel components that are exposed to weather must be protected.

Post-Installed Anchor Minimum Requirements Post-Installed adhesive & mechanical anchors used to attach to existing concrete members must comply with the following:

a. Do NOT interrupt or damage existing reinforcing bars, mesh or tendons contained with concrete members. Use Ground Penetrating Radar (GPR) to located existing reinforcing bars.

b. Notify the structural engineer immediately and do not proceed if any reinforcing or tendons are interrupted by installation of a post-installed anchor or for any other reason. Use ground penetrating radar (GPR) to locate existing reinforcing.

c. Materials & installation must comply with the manufacturer's recommendations, governing building code & appropriate ICC Code report. The appropriate ICC Code report shall govern with regards to published capacity & analysis of the anchoring system, installation procedures and special inspection requirements. The anchor and adhesive/epoxy must indicate that it complies with the governing IBC or later, and ACI 318 Appendix #D, otherwise the anchor shall NOT be permitted in accordance with governing codes & standards.

d. Post-installed anchors shall not be substituted for cast-in-place anchors, unless approved in writing by the structure engineer.

e. Special inspection requirements for all post-installed anchors must comply with Chapter 17 of the Building Code and the ICC code Report. The Contractor & Special inspector shall thoroughly verify and documents all criteria indicated in the ICC code report.

f. All post-installed threaded rods and anchors shall comply with the materials indicated within the ICC Code Report for the required capacity and the rod/anchor shall be stamped with identification on the end projected from the concrete.

g. Post-installed anchors exposed to weather shall be hot dipped galvanized or have a zinc coating conforming to ASTM A153 (C or D), or stainless steel AISI A316 anchors. Stainless steel anchors shall only be used where specifically permitted by the project’s Structural Engineer. Anchor material & coating must consider the effects due to dissimilar materials.

h. The drill type and drill bit type & diameter must comply with the appropriate ICC Code report.

i. Using a vacuum or other suction device for cleaning the drilled hole in lieu of blowing out the hole using compressed air shall not be permitted.

j. Proper cleaning of post-installed adhesive holes is critical to the anchors performance. Follow the manufacturer’s instructions & ICC code report requirements exactly, including the following instructions:

· Blow debris out of the hole using oil-free compressed air, starting from the bottom of the hole and working to the surface. Repeat a minimum of two times, until there is no noticeable dust in the air stream.

· Brush the hole two times with Hilti HIT-RB brush or equivalent.

· Use oil-free compressed air to blow debris out of the hole, again, starting from the bottom of the hole and working to the surface. Repeat a minimum of two times, until there is no noticeable dust in the air stream.

k. Accessory sets (HILTI HIT PROF1 or equivalent) containing hole-cleaning tools and injection aids shall be provided when installing adhesive anchoring system.

QUALITY CONTROL

The work performed under this contract must demonstrate skills of the highest quality. Any imperfections that reveal a lower level of workmanship (i.e., poor painting, uneven sills, large nail holes, etc.) shall be deemed unacceptable. The GSA COR and PM will make random site visits to insure that the project is meeting standards and is acceptable. Any attempt to disguise poor workmanship shall be deemed unacceptable. Any work that is found to be unacceptable shall be removed at the expense of the contractor and re-performed correctly by the contractor. Quality control measures include, but are not limited to, the following:

Periodic GSA Observations Contractor must notify the GSA COR and PM of work to be performed/completed at key benchmarks throughout the project allowing GSA the opportunity to observe work being performed at key benchmarks during the course of the project. Any deficiencies observed will be required to be corrected prior to final payment being released.

Substantial Completion Inspection When notified, the GSA COR and PM will conduct an inspection of the work performed. Any deficiencies will be required to be corrected prior to final payment being released.

Special Inspections & Testing Special Inspection & testing to be performed in accordance with chapter 17 of the governing Building Code and relevant ICC Code report(s), where required by code, ICC Code Report, material/product Manufacture recommendations and other codes & standards.

The special inspection & testing firm will be paid for as part of a separate contract and is not to be included in the bid proposal associated with this scope of work.

SAFETY

The safety of occupants and workers is of paramount importance and any unsafe conditions must be addressed immediately. All activities conducted under this contract shall be performed in compliance with all applicable Safety regulations and guidelines including but not limited to: OSHA, NFPA, Building Codes, and General worksite safety practices.

Communication of Life Safety Issues Notify GSA immediately of items in need of immediate repairs due to life safety concerns and repairs that are needed for the continued safe use of the parking structure. Provide structural recommendation pertaining to any urgent life safety issues.

Caution & Warning Signs As necessary, warning /Caution signs must be provided that are highly visible that occur at multiple & frequent locations.

SUBSTITUTIONS & ALTERNATES

Where a specific product is referenced in the construction documents; substitutions for products by other manufactures may be acceptable, provided the proposed product meets or exceeds the specified product and is approved by the structural engineer of record via a Request for Information (RFI) and complies with the building code, with final approval from GSA. Substitutions indicated on shop drawings must reference the approved RFI number.

Substitutions for post-installed adhesives must have a current & appropriate ICC code report.

ADMINISTRATION & GENERAL PROVISIONS

The requirements set forth in this section apply to all project phases and work to be performed that is indicated throughout this entire scope of work.

CONSTRUCTION / REPAIR OPERATIONS

Contact for Coordination of on-site Work Hours & Staging The Contractor shall identify, schedule, and coordinate, in advance all after-hours or weekend work and any other deviations from normal work hours with GSA Project Manager.

Brandy M. Nabors, Project Manager 404-331-0432 brandy.nabors@gsa.gov On-Site Work Hours of Construction Operations On-site work may be performed during & after normal building operating hours within reasonon, Monday through Friday (except federal holidays), and on weekends. The specific on-site work hours for construction operations are flexible within reason and may be discussed further during final contract negotiations.

Work that involves loud noise, percussive impact, hazardous chemicals, volatile organic compounds (VOC), or that creates objectionable fumes, odors or vapors perceptible outside the work site shall be after-hours or on the weekend.

Minimum Disruption All construction shall be prepared in such a manner so that all work phase sequencing may proceed with minimum disruption to the occupying agency during the construction process.

Staging Staging area, storage, parking, security, access controls, and other miscellaneous operational matters shall be coordinated with the GSA Project Manager.

Closure of Parking Deck during Construction.

No more than half of the parking deck may be closed at any given time during the course of construction.

Additionally, provide an alternate cost & schedule estimate indicating any possible savings should all of the parking deck be permitted to be closed during the course construction.

Clarify in the proposal any other alternate phasing/closure options for GSA to consider that may be beneficial for the repair of this parking deck.

GENERAL PROVISIONS

Measurements All dimensions, measurements and/or quantities indicated in this SOW are approximate and shall not be used by the contractor as definite. Contractors are expected to inspect the job site prior to acceptance of delivery order in order to acquaint themselves with the scope of the project and to verify measurements. In no event shall failure to inspect constitute grounds for claim after the delivery order is awarded.

Clarifications/Requests for Information/Change Orders Any deviations from the construction documents must be reviewed & accepted in writing prior to performing the work. Each RFI must include a specific description of the issue requiring clarification, citing the specific related contract documents requiring clarification. RFIs should only be submitted after performing due diligence. Upon receipt of the response to each RFI submitted, coordinate the response with all involved subcontractors to ensure understanding and appropriate action.

Work outside of the Scope of Work Any documents, drawings/sketches or construction administration documents that imply work to be performed that may be outside of the contractor’s approved contract & scope work; must be approved in writing by the GSA Contracting Officer prior to performing the work or ordering materials. Any work performed or materials ordered, prior to receiving written approval to proceed from the GSA Contracting Officer, shall be at the contractor’s own risk, at no expense to GSA. Drawings, sketches, documents, verbal or written instructions/direction from GSA personnel that is outside of the approved contract & scope of work shall be considered as void & not for implementation/construction unless approved in writing by the GSA Contracting Officer.

Discrepancy or Conflicting Information/Requirements Notify GSA immediately of any discrepancy within this scope of work and with any other referenced documents. For bidding / proposals & cost estimating purposes, use the more conservative condition until written clarification is issued. Clearly indicate any possible discrepancies and submit to GSA in writing on or before the proposal / bid due date.

Quality Control All field evaluation & testing for this project must be done using quality control measures and provide protections to drives and sidewalk areas below. A safety plan is required. Phasing of the work may be required. Assume standard weather delays in the project schedule to work based on normal rain patterns for time frame for the work.

DOCUMENT CONTROL

The following typical requirements apply to all documents & submittals.

Electronic Document Format In addition to any hardcopy submission requirements, submittals, and all other documents must also be submitted in an electronic format. In addition to a hardcopy; the documents must be submitted in a Portable Document Format (PDF) and in the documents original native electronic format. All electronic media must be in a form readable by standard office automation applications.

Any supporting analysis / calculations must also be submitted as a hard copy, PDF electronic format and the original native electronic format, including any 3D or Analysis models.

Document Security Per requirements of GSA Order 490.1, record keeping of SBU building information must require a Document Security Notice. Also all SBU building or project information must be properly destroyed and disposed of. Notice of disposal is required by Contractor to the GSA Contracting Officer.

Required Imprint: All Construction Documents and Specification Manuals either in electronic or paper formats must have imprinted the following information in accordance with the U.S. General Services Administration GSA Order 3490.1- Document Security for Sensitive But Unclassified Paper and Electronic Building Information. No exceptions:

a. On all plans prominently displayed in minimum 14 PT bold text type.

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY.

Do not remove this notice.

Properly destroy documents when no longer needed.

b. On the Cover Sheet of sets of Drawings and Specification Manuals either in electronic or paper format, prominently displayed in minimum 14 PT bold text type. No exceptions:

PROPERTY OF THE UNITED STATES GOVERNMENT COPYING,

DISSEMINATIONS, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.

Do not remove this notice.

Properly destroy documents when no longer needed.

Submittals The following submittal criteria is in addition to the criteria indicated on the repair drawings & specifications indicated in section #5 of this SOW.

a. Deliverables / Submittal Quantities The following criterion applies to all deliverables & submittal documents.

· Provide an additional 3 hard copy sets & electronic copy of all submittals for GSA’s use. These copies are in addition to the copies indicated in the specifications on structural drawings. Where the drawings or specifications do not indicate a specific number, then assume 3 copies as well, for a minimum of 6 hard copy sets & an electronic copy.

· Where drawings are submitted that are larger than 26 inches in any direction; provide 1 full size copy for GSA & 1 full size for the C/A team and remaining copies should be half-size.

· Submittals must have proper descriptions, dates, revision number, page numbers, table of contents, indicate what it is issued for (construction, review, etc..), project name, address, etc….

b. General Documents & Submittal Requirements The following criterion applies to all deliverables & submittal documents.

· Reports & documents must have a proper cover sheet, table of contents & each page uniquely numbered.

· The final drawings, sketches, reports or calculations prepared by design professionals must be signed & sealed, including the PDF copy.

· All security requirements & Sensitive But Unclassified (SBU) criteria indicated in the base scope of work applies to this addendum.

· Provide all support data & calculations that supports any analysis necessary to provide IFC repair documents & for the evaluation.

Construction Administration Documents Provide GSA a hard copy & electronic copy of all Requests for Information (RFI), RFI responses, sketches, shop drawings, manufacture data, site observation reports, inspection reports, deficiency reports & other Construction Administration (CA) supporting documents & data.

a. All engineered documents that alter the signed & sealed IFC construction / repair documents and all site observations must be sent to GSA within 24 hours of being issued for constriction.

b. All inspection reports must be sent directly to GSA from the inspection firm at the same time that they are sent / emailed to the contractor. Likewise, the inspection reports must be sent directly to the contractor’s discipline specific Design Professional in Responsible charge (DPR) at the same time as they are sent / emailed to the contractor.

c. All Construction documents must also be neatly grouped together and provided to GSA in electronic format at the end of the project.

SECURITY REQUIREMENTS

In the performance of work required under this contract, all Contractor personnel must present proper identification to gain access to occupied building areas housing federal operations. “Contractor Personnel” refers to any employees of the Prime Contractor and the employees of any subcontractor at all tiers.

Reference to GSA Order 3490.1 and this Scope of Work Prior to commencing work, the contractor will provide a list of personnel who will be involved in project. This information will be forwarded to the IRS Physical Security Office and/or Department of Homeland Security for purposes of conducting security-related investigations. Other security requirements will be coordinated with GSA.

GSA-PBS Order 3491.1:

Dissemination of electronic building and/or project information data is prohibited outside of GSA. However, there’s a limited dissemination to authorized users. Dissemination of information shall only be made upon determination that the recipient is authorized to receive it. The criterion to determine authorization is need-to-know such as Federal Agencies (in this case also local city and/or county building departments reviewing contract documents), architects, engineers, lessors, consultants, contractors, subcontractors, suppliers, plan rooms, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors. Authorized users on a need-to-know basis shall provide identification as follows:

a. Valid identification for Federal Government Users.

b. Valid identification for non-Government Users.

Contractor Personnel All contractors’ personnel will be screened through the GSA Office of Mission Assurance Background Investigation Suitability process and/or IRS Physical Security Officer prior to beginning work, or provisions to allow for appropriate escorts need to be considered in the general contractor’s proposal. Contractor personnel will conduct themselves in a professional manner at all times while on government property this includes language and dressing appropriately should any individual fail to comply they must be removed from the premises immediately. Failure to comply with security officers is a serious issue and will not be acceptable for any reason.

Subcontracts The Contractor shall incorporate provisions in all applicable subcontracts as necessary to ensure compliance with all requirements provided in this Contractor Personnel Security Requirements section.

TURNOVER PROCESS

Substantial Completion Assist the GSA in conducting a final inspection and preparing a punch-list documenting remaining work.

Participate with the GSA in conducting follow-up inspections to administer resolution of punch-list items, involving stakeholders as appropriate.

Warranties, Guarantees and Certificates Prepare and submit any warranties, guarantees, and certificates, ensuring that the GSA rights and responsibilities are clearly defined. This includes the warranty for the expansion joint and joint material.

Material Samples and Spare Parts As a condition for the GSA certification of substantial completion, provide an inventory list of all items to be turned over to the GSA at close-out.

As-Built drawings Provide a hard copy and electronic copy of the structural repair drawings, specifications & shop drawings Red-marked to reflect the As-Built repairs & conditions. Cloud all As-built conditions & deviations and reference all associate RFI’s & Sketches numbers directly on the red-marked as-built drawings. Provide a table of contents of all as-built conditions & deviations indicating the deviations, sheet / page number(s) applicable, associated RFI & Sketch number(s), description of change & why it was necessary.

Electronic Copies of all Documents Provide an electronic copy of all shop drawings, RFI’s, sketches, changes, Inspection Reports, Testing reports, schedules, Construction Administration documents and all other documents. Provide table of contents & log for all RFI’s, Sketches, Shop Drawings, inspections, deviations and organize documents in binders that are properly labeled with volume numbers.

Closeout/Administration Stage

a. Contractor to resolve all punch list items.

b. Submit release of claims

PERIOD OF PERFORMANCE & SCHEDULE

Period of Performance All work shall be completed within Seven Hundred Thirty (730) calendar days after a Notice to Proceed (NTP) is issued and personnel have been cleared.

Schedule The Contractor shall submit a work schedule which will provide the most productive use of man hours without affecting the quality of the finished product; causing the least disruption to the tenant agency. Some work may need to be scheduled outside of normal business hours at no additional cost to the government.

The project schedule must be submitted within 15 calendar days after the Notice to Proceed. Project Schedule shall include all tasks to be performed under this project, duration of each task and tentative date/s each task will be performed. Project schedule must be approved by the GSA Project Manager prior to performing any work under this project.

Additional Provisions All provisions and regulations apply from full length contract. No person/persons are able to exempt anyone from necessary provisions to complete contract. Please refer to contract if you have any questions prior to beginning work.

COSTS

Unit Costs Provide unit prices for all repair items for use in the event the quantities in the base scope need to be adjusted. Note, the unit prices provided in the proposal will be considered during the contractor selection process. Where the repair quantity, length, orientation or location of the item to be repaired, based on the bidders observation of the existing conditions on site may result in a cost savings for a more competitive bid; bidder’s option to clarify / break-out in the bid proposal deviations to quantity, length or orientations/surfaces/member type based on the existing conditions if there is a cost savings. Deviations must be clearly indicated in bold text and summarized at the end of the proposal. The basis of the deviation and advantage to the project must be indicated. Any clarification/break-out must be based the bidder’s site observation of the existing conditions and not based on assumptions.

The extent of scope is not anticipated to exceed the items & quantities indicated in this base scope of work, but should additional items or quantities be necessary, then written approval from GSA of the fixed additional cost is required before the additional work is performed or any related materials are order.

Group unit costs together in a table and provide with the proposal Miscellaneous Costs Miscellaneous costs such as travel, printing, postage, shipping, reproduction, clerical support, computer software, photographic requirements, etc. shall be included in the proposal.

FEES AND PAYMENT

Payments Refer to FAR 52.232-5 Payments under Fixed-Price Construction Contracts and FAR 52.232-27 Prompt Payment for Construction Contracts. Contractor Payment Requests Before submitting each payment request, meet with GSA to review the advance copy of the construction progress report. Ensure that GSA is in agreement as to the progress of the construction work and the value of the work completed. Based upon agreed value of work completed, submit monthly payment requests to the GSA.

Invoices shall be sent to the GSA CO and/or COR to be approved before submitting to GSA Finance office.

Travel Unless otherwise indicated in the Scope of Services sections, the Contractor is responsible for travel costs to support the requirements contained in this Statement of Work, including all progress meetings, workshops, reviews, and site visits. The Contractor shall assume all travel will be within the vicinity of the project site except as specifically indicated otherwise in the Scope of Services section.

Reproduction and Delivery Printing, reproduction and delivery costs necessary for execution of this contract are included the contract price.

APPENDICES

All of the documents indicated in these appendices must be considered as Sensitive but Unclassified (SBU) in accordance GSA PBS order 490.1.

A)2012 Construction / Repair Documents:
A1Appendix #A1:Structural Repair Drawings 31Aug2012 IFC - Chamblee IRS Deck #VGA00039
Sheets #SP000 thru #SP302, (35 drawing sheets in total), dated 31-Aug-2012
Prepared by: Walter P More
A2Appendix #A2:Specification 31Aug2012 IFC - Chamblee IRS Deck #VGA00039
Spec Section #00010 thru #07900, (335 pages in total), dated 31-Aug-2012
Prepared by: Walter P More

A3 Appendix #A3: 2012 Geotechnical Evaluation Report 14Mar2012 – Chamblee IRS Deck #VGA00039 Report of Geotechnical Evaluation & Shear Wave Velocity Testing Parking Deck Renovations at IRS Service Center Pages #1 thru #8 & supporting info, (21 pages in total), dated 14-March-2012 Prepared by: ATC Associates Inc.

B) Original 1996 / 1997 Construction (for Reference Only):

The select original construction documents indicated in Appendix #E & #F will be made available after award.

B1Appendix #B1:1996 Geotechnical Evaluation Report 19Mar1996 - Chamblee IRS Deck #VGA00039
Geotechnical Evaluation & Supporting Info, (63 pages in total), dated 19-March-1996
Prepared by: ATEC Associates Inc.
B2Appendix #B2:1997 Structural Drawings 02Sept1997 for Reference - Chamblee IRS Deck #VGA00039
Sheets #SP101 thru #SP502, (27 pages in total), dated 02-Sept-1997
Prepared by: O’Kon and Company

image2.jpeg image1.png

File details come from the government source that posted it. Updated .