Amendment 0001 SF30
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
GSA Mid-Atlantic Region
U.S. General Services Administration 20 N. 8th Street Philadelphia, PA 19107-3191 www.gsa.gov
RFP Solicitation Number: GS-03-P-DX-C-7004, issued March 24, 2016 Cooling Tower Replacement Internal Revenue Service – Enterprise Computing Center Kearneysville, WV
Amendment 0001, dated April 11, 2016
Page 1 of 4, exclusive of attachments
This represents Amendment 0001 issued against the above referenced Request for Proposal
(RFP).
1. The due date and time for receipt of proposals remains May 11, 2016 at 2:00 PM (Local Philadelphia Time).
2. This amendment must be acknowledged with your price proposal.
3. The meeting minutes and sign-in sheet from the April 5, 2016 Pre-Proposal Conference/Site
Visit (Attachment 1) are incorporated into this Amendment.
4. All questions and Requests for Information (RFI’s) are to be submitted by e-mail not later than May 2, 2016 at 12:00 pm (local Philadelphia time) to the contract specialist, Tracy Meister, at tracy.meister@gsa.gov.
5. The period of performance is adjust as follows:
a. Substantial completion is changed FROM Four Hundred Twenty Six (426) calendar days TO Three Hundred Sixty Six (366) calendar days from Notice to Proceed.
b. The total period of performance is changed FROM Four hundred Eighty Six (486) calendar day TO Four Hundred Twenty Six (426) calendar days.
6. The following answers are provided for questions submitted by contractors regarding this
RFP:
A. QUESTION:
Drawing S 101 calls out pier P1 as 18”x 18”. Detail 3/S301 details pier P1 as 16”.
What is the size of Pier P1?
ANSWER:
Pier shall be 18"x18". Drawings and details will be updated accordingly.
mailto:tracy.meister@gsa.gov
B. QUESTION:
Sheet M-001 Option C. New exterior and interior redundant CWS&R piping system will be provided -see mechanical, electrical plumbing & civil drawings. New base bid piping is not installed.
Option D. New base bid exterior condenser water piping gets added back into project.
See mechanical, electrical, plumbing and civil drawings.
Does this mean the interior CWS&R piping taken out in option C does not get added back in for option D?
Revise Options to Read:
Option C. New exterior and interior redundant CWS&R piping system will be provided -see mechanical, electrical plumbing & civil drawings. New base bid exterior piping and 3-way bypass valve are not installed.
Option D. New base bid exterior condenser water piping and 3- way bypass valve gets added back into project. See mechanical, electrical, plumbing and civil drawings.
These are general statements. Please refer to drawings for more detailed piping requirements. Drawings are already noted correctly to reflect this.
C. QUESTION:
Specification section 012100 Allowance’s 3.2 A,B,C.
Please clarify that if these cost are to be included in Base, Options B,C,D,G & H or just in base bid.
Section 000011 Includes a specification matrix which indicated that Allowances are included in Base, B, C, D, G, and H.
D. QUESTION:
Please clarify if the Prime Contractor is responsible for escort’s or will they be provided by owner if need be.
The owner will not be providing escorts. We expect that each major subcontractor working inside the facility will have at least one person cleared and badged to escort their crews while within the building. Large or multiple crews will require multiple escorts; assume one badged person for every two non-badged. We expect the GC will have most if not all of their onsite personnel cleared and badged in order to escort non-badged contractors, delivery drivers, safety personnel, visitors, etc. that may require access to the facility. As a general rule, if a contractor will be working inside the facility for more than two weeks, we prefer they have at least one badged person on staff.
E. QUESTION:
Please clarify if specification section 013600 applies to this project.
Yes, the section applies to this project
F. QUESTION:
Specification section 01310-7 B. Full time project coordinator.
Please clarify if this position is full time on site.
The project coordinator referenced in spec 013100 appears to be a GC project manager or superintendent. This person would be full time on-site.
G. QUESTION:
Specification section 014000 1.5-C-1.
Can the superintendent hold the position of the QC Manager on this project if they have the proper qualifications?
The paragraph states that the sole responsibility of the quality control manager shall be quality control. Therefore the QCM shall not be the Superintendent.
H. QUESTION:
Specification section 01500, 1.3A calls for a site plan showing construction personal parking areas. Specification 011400 B-11 states no parking will be allowed on site.
Please clarify.
Parking is available in the main employee parking lot. Parking will not be available at the actual construction site.
I. QUESTION:
Since this project is mainly mechanical and electrical, and pricing usually comes in at the last minute, can hard copies of pricing only be submitted at time of bid and followed up next day with the electronic reversion?
No. Complete technical and pricing proposals are due on May 11, 2016 at 2:00 EST.
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0001 |
| Code[0]: 3PQCV |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Tracy Meister, Contracting Officer |
| Description[0]: Cooling Tower Replacement Project |
Internal Revenue Service - Enterprise Computing Center 250 Murall Drive, Kearneysville WV 25430
See attached supplemental page for details of this amendment.
| FacilityCode[0]: |
| Code[2]: 3PQCV |
| IssuedBy[0]: General Services Administration |
Contract Operations Branch - VA & WV Section 100 S. Independence Mall West Philadelphia, PA 19106
| NameandAddress[0]: |
| AdministeredBy[0]: General Services Administration |
Contract Operations Branch - VA & WV Section 100 S. Independence Mall West Philadelphia, PA 19106
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: GS-03-P-15-DX-C-7004 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 5 |
| EffectiveDate[0]: 04/11/2016 |
| Dated9B[0]: 03/24/2016 |
| Dated10B[0]: |
| CheckBox9[0]: Off |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: 4/11/2016 |
| Copies[0]: 1 |
| CopiesReturned[0]: |