Amendment_0001_SF30_Consolidated.pdf

PDF 343 KB Posted

Attached to
IRS ECC Cooling Tower Replacement Federal contract opportunity
Solicitation number
GS-03-P-16-DX-C-7004
Issued by
General Services Administration Public Buildings Service Region 3

About this file

Amendment 0001 SF30

View the file

Other files for this federal contract opportunity

Other files attached to IRS ECC Cooling Tower Replacement, newest first.
File Type Posted
Amendment_0011_SF30_Consolidated.pdf PDF
IRS_ECC_CT_Pre-Proposal_Site_Visit_04.22.16_Sign_in_Sheets_Consolidated.pdf PDF
104416_-_FIRE_EXTINGUISHERS.PDF PDF
Amendment_0010_SF30_Consolidated.pdf PDF
GDI_Info_-_IRS_CT_Replacement.xls.xlsx XLSX spreadsheet
Amendment_0009_SF30_Consolidated.pdf PDF
Amendment_0008_SF30_Consolidated.pdf PDF
099123_-_INTERIOR_PAINTING.pdf PDF
099113_-_EXTERIOR_PAINTING.pdf PDF
Amendment_0007_SF30_Consolidated.pdf PDF
Amendment_0006_SF30_Consolidated.pdf PDF
Amendment_0005_SF30_Consolidated.pdf PDF
Amendment_0004_SF30_Consolidated.pdf PDF
GSA527-15_Contractor's_Qualifications_and_Financial_Information.pdf PDF
Amendment_0003_SF30_Consolidated.pdf PDF
Amendment_0002_SF30_Consolidated.pdf PDF
Amendment_0004_04.14.2016.pdf PDF
Amendment_0003_04.13.2016.pdf PDF
Amendment_0002_04.12.2016.pdf PDF
Amendment_0001_Consolidated_04.11.2016.pdf PDF
IRS_ECC_Cooling_Tower_Replacement_Project_Kearneysville_WV_The_Agreement_Form_C101.pdf PDF
IRS_FULL_SET_3-11-16.pdf PDF
2016-03-18_Bid_Document_Project_Manual.pdf PDF
REV_IRS_ECC_Cooling_Tower_Replacement_Project_Kearneysville_WV_The_Solicitation_Form_C201.pdf PDF
IRS_ECC_Cooling_Tower_SOW_03.22.2016.pdf PDF
IRS_ECC_Cooling_Tower_Replacement_SF_1442_with_Price_Proposal_Bid_Sheet_03.16.2016.pdf PDF
Wage_Determination_WV37_Mod_2_dtd_02.19.2016.pdf PDF
IRS_ECC_Cooling_Tower_Replacement_Project_Kearneysville_WV_Reps_ _Certs_Form_C301.pdf PDF
IRS_Pre_Solicitation_Notice_02.22.2016.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

GSA Mid-Atlantic Region

U.S. General Services Administration 20 N. 8th Street Philadelphia, PA 19107-3191 www.gsa.gov

RFP Solicitation Number: GS-03-P-DX-C-7004, issued March 24, 2016 Cooling Tower Replacement Internal Revenue Service – Enterprise Computing Center Kearneysville, WV

Amendment 0001, dated April 11, 2016

Page 1 of 4, exclusive of attachments

This represents Amendment 0001 issued against the above referenced Request for Proposal

(RFP).

1. The due date and time for receipt of proposals remains May 11, 2016 at 2:00 PM (Local Philadelphia Time).

2. This amendment must be acknowledged with your price proposal.

3. The meeting minutes and sign-in sheet from the April 5, 2016 Pre-Proposal Conference/Site

Visit (Attachment 1) are incorporated into this Amendment.

4. All questions and Requests for Information (RFI’s) are to be submitted by e-mail not later than May 2, 2016 at 12:00 pm (local Philadelphia time) to the contract specialist, Tracy Meister, at tracy.meister@gsa.gov.

5. The period of performance is adjust as follows:

a. Substantial completion is changed FROM Four Hundred Twenty Six (426) calendar days TO Three Hundred Sixty Six (366) calendar days from Notice to Proceed.

b. The total period of performance is changed FROM Four hundred Eighty Six (486) calendar day TO Four Hundred Twenty Six (426) calendar days.

6. The following answers are provided for questions submitted by contractors regarding this

RFP:

A. QUESTION:

Drawing S 101 calls out pier P1 as 18”x 18”. Detail 3/S301 details pier P1 as 16”.

What is the size of Pier P1?

ANSWER:

Pier shall be 18"x18". Drawings and details will be updated accordingly.

mailto:tracy.meister@gsa.gov

B. QUESTION:

Sheet M-001 Option C. New exterior and interior redundant CWS&R piping system will be provided -see mechanical, electrical plumbing & civil drawings. New base bid piping is not installed.

Option D. New base bid exterior condenser water piping gets added back into project.

See mechanical, electrical, plumbing and civil drawings.

Does this mean the interior CWS&R piping taken out in option C does not get added back in for option D?

Revise Options to Read:

Option C. New exterior and interior redundant CWS&R piping system will be provided -see mechanical, electrical plumbing & civil drawings. New base bid exterior piping and 3-way bypass valve are not installed.

Option D. New base bid exterior condenser water piping and 3- way bypass valve gets added back into project. See mechanical, electrical, plumbing and civil drawings.

These are general statements. Please refer to drawings for more detailed piping requirements. Drawings are already noted correctly to reflect this.

C. QUESTION:

Specification section 012100 Allowance’s 3.2 A,B,C.

Please clarify that if these cost are to be included in Base, Options B,C,D,G & H or just in base bid.

Section 000011 Includes a specification matrix which indicated that Allowances are included in Base, B, C, D, G, and H.

D. QUESTION:

Please clarify if the Prime Contractor is responsible for escort’s or will they be provided by owner if need be.

The owner will not be providing escorts. We expect that each major subcontractor working inside the facility will have at least one person cleared and badged to escort their crews while within the building. Large or multiple crews will require multiple escorts; assume one badged person for every two non-badged. We expect the GC will have most if not all of their onsite personnel cleared and badged in order to escort non-badged contractors, delivery drivers, safety personnel, visitors, etc. that may require access to the facility. As a general rule, if a contractor will be working inside the facility for more than two weeks, we prefer they have at least one badged person on staff.

E. QUESTION:

Please clarify if specification section 013600 applies to this project.

Yes, the section applies to this project

F. QUESTION:

Specification section 01310-7 B. Full time project coordinator.

Please clarify if this position is full time on site.

The project coordinator referenced in spec 013100 appears to be a GC project manager or superintendent. This person would be full time on-site.

G. QUESTION:

Specification section 014000 1.5-C-1.

Can the superintendent hold the position of the QC Manager on this project if they have the proper qualifications?

The paragraph states that the sole responsibility of the quality control manager shall be quality control. Therefore the QCM shall not be the Superintendent.

H. QUESTION:

Specification section 01500, 1.3A calls for a site plan showing construction personal parking areas. Specification 011400 B-11 states no parking will be allowed on site.

Please clarify.

Parking is available in the main employee parking lot. Parking will not be available at the actual construction site.

I. QUESTION:

Since this project is mainly mechanical and electrical, and pricing usually comes in at the last minute, can hard copies of pricing only be submitted at time of bid and followed up next day with the electronic reversion?

No. Complete technical and pricing proposals are due on May 11, 2016 at 2:00 EST.

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]: 3PQCV
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Tracy Meister, Contracting Officer
Description[0]: Cooling Tower Replacement Project

Internal Revenue Service - Enterprise Computing Center 250 Murall Drive, Kearneysville WV 25430

See attached supplemental page for details of this amendment.

FacilityCode[0]:
Code[2]: 3PQCV
IssuedBy[0]: General Services Administration

Contract Operations Branch - VA & WV Section 100 S. Independence Mall West Philadelphia, PA 19106

NameandAddress[0]:
AdministeredBy[0]: General Services Administration

Contract Operations Branch - VA & WV Section 100 S. Independence Mall West Philadelphia, PA 19106

ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: GS-03-P-15-DX-C-7004
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 5
EffectiveDate[0]: 04/11/2016
Dated9B[0]: 03/24/2016
Dated10B[0]:
CheckBox9[0]: Off
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]: 4/11/2016
Copies[0]: 1
CopiesReturned[0]: