About this file

Questions/Answers

View the file

Other files

File Type Posted
sf24_e.pdf PDF
gs527_e.pdf PDF
POFloorSF30-02.pdf PDF
POFloorsi.pdf PDF
POFloor.doc DOC document
POSF30.pdf PDF
Pre-Proposal Agenda - Postal Floor.doc DOC document
S-501.pdf PDF
AD401 AD401 —
S-001.pdf PDF
POFloor2011_Negotiated.pdf PDF
POfloorC101_Negotiated.pdf PDF
pochfloor5.pdf PDF
POFloor2011_Negotiated.pdf.lnk LNK file
pochfloor14.pdf PDF
wagerates.pdf PDF
SF1442pochfloor.pdf PDF
pochfloor13.pdf PDF
pochfloor6.pdf PDF
pochfloor1.pdf PDF
_FINAL SUBMISSION SPEC —
pochfloor3.pdf PDF
pochfloor2.pdf PDF
pochfloor9.pdf PDF
09651 - BIO-BASED FLOOR TILE.pdf PDF
pochfloor4.pdf PDF
pochfloor10.pdf PDF
pochfloor12.pdf PDF
pochfloor11.pdf PDF
pochfloor7.pdf PDF
POfloorC101_Negotiated.pdf.lnk LNK file
POFloor2011_Negotiated.pdf.lnk LNK file
_FINAL SUBMISSION SPEC —
wagerates.pdf PDF
09651 - BIO-BASED FLOOR TILE.pdf PDF
POfloorC101_Negotiated.pdf.lnk LNK file
SF1442pochfloor.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Conference Phase I – Construction and Installation of New Flooring April 19, 2010

2:54 p.m.

QUESTIONS & A/E RESPONSES

1. Please clarify that the wood blocks under the asbestos-containing black mastic MUST be removed as ACM- waste and not as typical construction debris. We understand this to be the case as the mastic has most likely migrated into the cracks between the wood blocks.

A/E Response: Yes, the wood block is considered a contaminated asbestos containing material and should be removed in the same manner as an asbestos containing material.

2. Please confirm that the only air monitoring required of the asbestos contractor are the OSHA personals.

A/E Response: OSHA monitoring is the only required asbestos air monitoring by the Abatement Contractor however because this project is in Allegheny County there is required Final Clearance air monitoring which is performed by an independent third party typically hired by the building owner, management company or Government.

Other requirements for handling hazardous materials are referenced in section 01595 – Safety and Health. The Contractor’s responsibilities are also specified in this section.

3. The east wall in room 223 is labeled as partition type 4. Detail 4/A501 shows the flooring and wood block system to be removed and replaced with new concrete slab and flooring. However, this is outside the area indicated on all drawings for the floor replacement work. Is this room also to be included in the work?

A/E Response: The partition type for this room has been identified because a portion of it will be removed and replaced to accommodate the temporary alternative mail route. See drawings AD101 and AD102.

4. Partition types 6 and 7 are shown near Stair #23. Details 6 and 7/A501 show these shaft walls as being new with new concrete slab under them. These walls are not indicated elsewhere to be removed and replaced. Note that this would completely open up existing fire rated assemblies (stairs and shafts). If this is the case, how is this to be handled?

A/E Response: The existing partitions at these locations are new work done in 2002 and it is believed that the wood blocking does not extend under these partitions. The treatment of these walls will depend on the extent to which the wood blocking and contaminated materials is found to extend under these partitions.

The design intent of the new light weight topping slab is to replace all of the wood block flooring in the designated flooring replacement areas to the extent it extends under adjacent partitions. The lightweight concrete pour is to be contiguous under these partitions.

5. The partition types on A501 and A502 are not the same in all cases. Are any partition types on A502 applicable except for Type 9 for the Option?

A/E Response: The existing partition types shown on A-501are examples of the conditions that may be encountered. Existing partitions required to be removed for the replacement of the flooring are to be replaced with same partition type and finish.

Partition Type 9 with abuse resistant gypsum board as specified in section 09260-2.3.C shown on sheet A-502 is an option for replacing CMU partitions that are removed for the flooring work. It is the intent of this partition replacement type that it will be more economical and expeditious to install and will facilitate the quick rectum to normal operations for the POCH.

6. Form 527 is to be submitted with the price proposal, but was not included in the bid documents. The latest available version that we’ve been able to locate expired in 2005. Can any version of this form be used for the submission? If not, please issue the form to be used.

Response: Form 527 and Form SF24 are attached with this amendment.