Solicitation_GS02P17DTC0001-_26_Federal_Plaza_Package_2_Final_8-11-2017.pdf
PDF 221 KB Posted
- Attached to
- RFP for the General Construction for 26 Federal Plaza Back-fill (Package 2) Floors 16-21
- Solicitation number
- GS-02-P-17-DT-C-0001
About this file
The Solicitation
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Solicitation No. GS-02P-17-DTC-0001
Document: C201 / DEC 2016 (The Solicitation) Pages 1 of 35
General Construction Services for the Backfill and Renovation of Floors 16 through 21 (Construction Package 2), Jacob K. Javits Federal Building, 26 Federal Plaza, New York, NY 10278
The Solicitation
552.219-71 Notice to Offerors of Subcontracting Plan Requirements (MAR 2012)
The General Services Administration (GSA) is committed to assuring that maximum practicable opportunity is provided to small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns to participate in the performance of this contract consistent with its efficient performance. GSA expects any subcontracting plan submitted pursuant to FAR 52.219-9, Small Business Subcontracting Plan, to reflect this commitment. Consequently, an offeror, other than a small business concern, before being awarded a contract exceeding $700,000 ($1,500,000 for construction), must demonstrate that its subcontracting plan represents a creative and innovative program for involving small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns as subcontractors in the performance of this contract.
Notice of Apprenticeship Programs
GSA is promoting the use of registered apprenticeship programs on this project. An Apprenticeship Plan is required after the award.
Notice of Equal Employment Opportunity (EEO) Compliance Plan GSA has partnered with the Department of Labor to ensure compliance with equal employment opportunity requirements that apply to this project. An EEO Compliance Plan is required after the award.
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit - Construction H. Receipt of Offers
II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal
(The Solicitation) Pages 2 of 35
D. Technical Proposal E. Other Information to Submit with Proposal F. Requirements for Joint Venture Offerors
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Contractor Performance Information H. Safeguarding Documents Designated as Sensitive But Unclassified I. Additional Security Requirements
IV. FAR/GSAR Solicitation Provisions
A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition B. FAR 52.216-1 Type of Contract C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction E. FAR 52.233-2 Service of Protest F. Buy American G. Buy American Exceptions H. Small Business Subcontracting Plan I. Project Labor Agreements J. GSAR 552.252-5 Authorized Deviations in Provisions K. FAR 52.252-1 Solicitation Provisions Incorporated by Reference L. GSAR 552.102 Incorporating Provisions and Clauses by Reference
V. Additional Solicitation Provisions and Instructions
A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29
B. FAR 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions
C. Additional Provisions D. Cost or Pricing Data E. Additional Clauses F. FAR 52.222-62 Paid Sick Leave
VI. Method of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness / Price Realism D. Unbalanced Prices E. Total Evaluated Price F. Non-Price Factors G. Evaluation of Joint Venture Offerors
(The Solicitation) Pages 3 of 35
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.
No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
I.B. List of Solicitation Documents
The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Other Forms Required For Submission with Proposals
(4) Standard Form (SF) 1442 – Solicitation Offer and Award & Pricing Sheet
(5) The Agreement and Attachments to the Agreement
(6) The Statement of work, Specifications, Drawings, and Exhibits.
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
(1) Contracting Officer
Name: Claudia Rivera Address: One World Trade Center, New York, NY 10007
55th Floor Telephone: 212-264-5244
Email: Claudia.Rivera@gsa.gov
(2) Alternate Point of Contact
Name: Winnie Eng Address: 1 World Trade Center, New York, NY 10007
Telephone: 212-264-2575 Email: Winnie.Eng@gsa.gov mailto:Winnie.Eng@gsa.gov
(The Solicitation) Pages 4 of 35
I.D. Pre-Proposal Conference
(1) A pre-proposal conference regarding this Solicitation is scheduled as follows:
Date: TBD
Time: TBD Location: 26 Federal Plaza, New York, N.Y. 10278
*Specific room location will be posted on Fedbizopps
(2) Information regarding the pre-proposal conference will be posted on the Federal Business Opportunity website at http:/www.fbo.gov
Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer, Claudia Rivera via email at Claudia.rivera@gsa.gov
I.E. Estimated Price Range
The estimated price range for the Project is between $75,000,000.00 and $95,000,000.00
I.F. FAR 52.228-1 Bid Guarantee (SEP 96)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.G. FAR 52.236-27 Site Visit - Construction (FEB 95) mailto:Claudia.rivera@gsa.gov
(The Solicitation) Pages 5 of 35
(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation and are in the attached Agreement. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
[(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than four (4) representatives from each Offeror. Offerors shall submit a Visit Authorization Request (VAR) identifying all attendees from their respective team.
Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors. Submit the VAR to the point of contact listed below.
For further information about the site visit or access requirements, please contact:
Name: Thomas Zick, Project Manager
Telephone: 212-264-3575 Email: Thomas.zick@gsa.gov
I.H. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the solicitation must be received at the following office no later than 3:00 pm local time on the following date and at the following e-mail addresses:
Date: September 25, 2017 Email : Claudia.Rivera@gsa.gov / cc: Winnie.Eng@gsa.gov
NO hardcopies will be accepted. Please See Proposal Preparation attachment
(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.
(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the government installation designated for receipt of offers on or before the date established for receipt of offers.
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
(1) Price Proposal
(2) Technical Proposal
(3) Representations and Certifications
(4) Bid Guarantee, using Standard Form 24
(5) Subcontracting Plan http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375 mailto:Claudia.Rivera@gsa.gov
(The Solicitation) Pages 6 of 35
(6) GSA Form 527 – Contractor’s Qualification and Financial
II.B. Proposal Format Part I shall be the offeror’s Price Proposal and it shall contain the pricing information for the base, options and alternatives. Part II shall be the offeror’s Technical Proposal, which will provide the response to the technical factors demonstrating the offeror’s technical capabilities. Technical and Price Proposal shall be sent as (2) two separate email attachments. Proposal shall be submitted via email to Claudia.Rivera@gsa.gov and must copy Winnie.Eng@gsa.gov. SEE PROPOSAL
PREPARATION INTRUCTIONS ATTACHMENT
II.C. Price Proposal
(1) Contents
The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror. Price proposal shall include Offer Pricing Sheet Form.
(2) Qualifications, Exclusions and Conditions
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
(3) Project Labor Agreement
Offerors may submit a price proposal subject to the Project Labor Agreement (PLA) requirements set forth in this solicitation (a PLA proposal), a price proposal not subject to the PLA requirements set forth in this solicitation, or both. Any price proposal submitted shall clearly identify whether it is subject to such PLA requirements.
(4) Additional Price Proposal Requirements
REFER TO THE OFFER PRICING SHEET FORM
II.D. Technical Proposal The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.
Factor 1: Experience on Similar Projects (20%) Factor 2: Qualifications of Key Personnel (20%) Factor 3: Project Execution and Quality Control Plan (20%) Factor 4: Past Performance on Relevant Construction Projects (20%) Factor 5: Small Business Subcontracting Methodology (10%) Factor 6: Project Labor Agreements (PLA) (10%)
FACTOR 1: EXPERIENCE ON SIMILAR PROJECTS
The offeror must submit the required information on the Experience Summary Table (Attachment A1) as well as Project Fact Sheets (Attachment A2) for three (3) mailto:Claudia.Rivera@gsa.gov
(The Solicitation) Pages 7 of 35 projects. One of the three projects must have a minimum construction cost of forty million dollars ($40,000,000) and the other two must have a minimum construction cost of ten million dollars ($10,000,000). All must have been successfully and substantially completed within the past ten (10) years. The Offeror must have served as the Prime GC or CMc on the submitted projects. Demonstrated experience on projects similar to this contract will lead to a higher rating for this factor.
A project will be considered similar based on the independent judgement and consensus judgment of the Source Selection Evaluation Board (SSEB) members that the project has enough characteristics in common with the subject project that it can be determined relevant experience. Projects determined to be not relevant or only partially relevant will receive no or lesser weight, resulting in a lower rating for this factor.
Similar projects are described as:
• Interior fit-out of Office Space.
• Construction within an occupied and operational building.
• HazMat Abatement.
• Installation of major mechanical and electrical equipment.
• Construction in New York City.
• Construction on LEED certified project (or the submission is in process for certification).
A single project identical in all aspects to this project may not exist, and therefore the Government will consider the combination of experience demonstrated by the three
(3) submitted projects. The combination of experience should include all of the key elements of relevant experience, identified below, in order to receive an acceptable rating for this factor. Significantly more weight will be given to individual projects meeting all of key elements. Minimal or negligible relevant experience in one or more key elements may result in an unacceptable rating for this factor.
Having relevant construction experience helps demonstrate capability to perform the work required under this contract. In assessing the experience level and assigning a rating for this factor, the Government will consider the similarity of the experience to the work required under this contract, including scope, complexity and magnitude.
Complexity includes schedule constraints, management and administrative requirements, security requirements, applicable design criteria, coordination requirements, local conditions, as well as technical complexity.
Offerors shall complete all blocks on each form. Lack of response on any field may be interpreted by the Government as a non-responsive proposal or the uncertainty and associated risk may result in a lower rating for this factor. The burden of providing complete and accurate information lies with the Offeror; however this does not preclude the Government from obtaining information from any other source.
Limit each Project Fact Sheet, Attachment A2, to no more than three (3) 8 ½” x 11”
(The Solicitation) Pages 8 of 35 pages. Each page shall be one sided, single spaced, with a minimum 11 point Times New Roman font. If the information submitted exceeds the page limitations, only the first three (3) pages will be evaluated.
Note for Joint-Venture Offerors: If relying on past experience and performance of the individual firms, at least one (1) project must be presented for each Joint venture partner.
Greater weight will be given to projects that demonstrate prior teaming of the Joint venture partners.
FACTOR 2 - QUALIFICATIONS OF KEY PERSONNEL
This factor assesses the qualifications of the proposed key personnel in terms of their academic/professional qualifications and their related work experience. The individuals presented must be the individuals who will be assigned to the project.
The offeror shall submit resumes for each of the key personnel proposed for this project for the positions identified below. Resumes shall include all pertinent information that clearly exhibits the qualifications of the proposed personnel. Resumes for each individual shall summarize the qualifications, professional designation, experience, education, skills and professional background information. Resumes must list the key personnel’s roles/responsibilities for the projects listed. An example resume format is provided as Attachment A3.
Submit resumes for the following positions:
● Project Manager
● Project Coordinator (Construction Superintendent)
● MEP Coordinator
Expected Qualifications for Key Personnel:
● Project Manager: The Project Manager for this contract should have a college degree (Bachelors) in an Architecture, Engineering, or Construction discipline. The Project Manager should have at least ten (10) years of construction project management experience having managed projects relevant to this contract. The Project Manager should have experience with electronic project management (ePM) tools. A more favorable evaluation will be given to offerors who submit a Project Manager who exceeds the minimum requirements and has experience with ePM.
● Project Coordinator (Construction Superintendent): The Project Coordinator should have a minimum of ten (10) years of construction experience as a superintendent on projects relevant to this contract. The Project Coordinator should have experience with electronic project management (ePM) tools. A more favorable evaluation will be given to offerors who submit a Project Coordinator who exceeds the minimum requirements and has experience with ePM.
● Mechanical/Electrical/Plumbing (MEP) Coordinator: The MEP coordinator should
(The Solicitation) Pages 9 of 35 have a minimum of ten (10) years of construction experience and be experienced in the coordination of mechanical, electrical, plumbing and fire protection construction trades on projects similar to this project, including experience with advanced metering technologies, and LEED requirements. It is preferred, but not required, that the MEP coordinator be licensed to practice as a professional engineer in the location of the project and has experience working with geothermal systems.
FACTOR 3 - PROJECT EXECUTION AND QUALITY CONTROL PLAN
This factor considers the offeror’s ability to perform the work in a successful manner by employing a sound project execution plan and controlling the quality of the work.
The offerors will be required to submit an organizational chart, which details the relationships between the offeror’s proposed project team key personnel and other team members. To put the GC team in the context of the entire project, the chart should graphically show the relationships between:
● The GC
● Major Subcontractors
● GSA (Project Team / Tenant Agencies)
● The CM
● The A/E
The offeror must submit a written narrative demonstrating its project execution plan, quality control plan, and reference to the offeror’s preliminary schedule. The narrative shall describe the offeror’s ability to achieve the requirements in the Scope of Work within the required schedule and demonstrate its understanding of the government’s requirements, and knowledge of the locality. The narrative shall be supplemented by a preliminary construction schedule for the subject project.
The offeror shall include in its narrative all factors and conditions it deems relevant and exigent to the successful completion of the work under this contract. At a minimum, the offeror must address its procurement and teaming plan for all major subcontracts. The narrative must address the offeror’s plan to mitigate the negative impacts of differing or unforeseen conditions on a project of this type, including inherent risks of construction within an occupied building and mitigation strategies for schedule delays. The narrative must also identify any high-risk work items, long lead times, and discuss how GSA may assist in meeting the schedule.
The narrative shall be no more than five (5) 8 ½” x 11” pages. Each page shall be one sided, single spaced, with a minimum 11 point Times New Roman font. If the information submitted for the narrative exceeds the page limitations, only the first five pages will be evaluated. The organization chart will not count against the page limit.
The preliminary construction schedule shall be created with P3, SureTrak, MS Project or any other electronic scheduling software. At a minimum, construction activities shall be
(The Solicitation) Pages 10 of 35 summarized by trade.
Note for Joint-Venture Offerors: Joint venture participant’s contribution to the organization should be commensurate with their skills and background and should be described in the project execution and quality control plan.
FACTOR 4: PAST PERFORMANCE ON CONSTRUCTION PROJECTS
The purpose of this factor is to review the offeror’s record of past performance on relevant construction projects.
The Offeror shall submit a Past Performance Questionnaires (PPQs) (included in the solicitation as (Attachment A4), completed by the applicable client, for each project included in its proposal for FACTOR 1 - EXPERIENCE ON SIMILAR PROJECTS. Completed PPQs should be submitted with the proposal. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror shall complete the first page of the PPQ as well as the Client Point of Contact Information and shall submit it with a statement of what attempt was made by the Offeror (e.g. “Sent to Mr.
Smith by email on 06/15/2017”). If the client requests, the client may submit a questionnaire directly to the Government's Contracting Officer prior to proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
You may also include performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror.
While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of completed PPQs submitted by Offerors.
FACTOR 5: SMALL BUSINESS SUBCONTRACTING METHODOLOGY
Under this factor, offerors must demonstrate their commitment to providing the maximum practicable opportunity to small, HUBZone small, small disadvantaged, women-owned small, veteran-owned, and service-disabled veteran-owned small business concerns, and
(The Solicitation) Pages 11 of 35 provide a detailed description of the methodology of how subcontractors will be selected for this project.
The rating for this evaluation factor will be based on an assessment of the probability that the resultant contract will achieve the proposed commitments as described below. It will be based on four items: (1) proposed small business subcontracting goals for this procurement,
(2) narrative describing your firm's outreach program for small businesses, (3) narrative describing how your firm will maximize competition and select subcontractors that provide best value and (4) participation in a mentor-protege program if applicable.
Note: In accordance with FAR 19.702(a)(1), if the apparent successful offeror is a large business it shall be required to submit an acceptable subcontracting plan prior to award.
Refer to the Small Business Subcontracting Form (included in the solicitation as Attachment A5). Subcontracting plans are not required from small business concerns.
Commitment to Small Business Concerns: GSA is committed to providing to the maximum extent practicable for these socio-economic businesses to receive federal contracting opportunities. This factor is designed to ensure that this GSA commitment is brought to the attention of the prospective offerors. This factor measures the extent to which the offeror will perform contract requirements utilizing small business concerns in the NAICS Code 236220. This portion of the proposal will be evaluated on the extent of planned participation of small business concerns in terms of the value of the total acquisition.
FACTOR 6: PROJECT LABOR AGREEMENTS (PLA)
Offerors are invited to submit a proposal subject to PLA requirements in the solicitation (a PLA proposal), a proposal not subject to PLA requirements, or both. Any proposal submitted shall clearly identify whether it is subject to such PLA requirements.
Standard for Evaluation A proposal submitted subject to the PLA requirements set forth in the RFP will receive full credit under this evaluation factor. A proposal not subject to the stated PLA requirements will receive no credit under this evaluation factor.
Submittal Requirements The Offeror shall submit a signed statement that the proposal is or is not submitted subject to the PLA requirements.
Evaluation Factor # 6: Project Labor Agreement
A proposal submitted subject to the PLA requirements set forth in this solicitation will receive full credit under this evaluation factor. A proposal submitted not subject to such PLA requirements will receive no credit under this evaluation factor.
EVALUATION OF JOINT VENTURES
Joint venture offerors may combine the past experience and performance of the individual
(The Solicitation) Pages 12 of 35 firms making up the joint venture. If relying on past experience and performance of the individual firms, at least one (1) project must be presented for each Joint venture partner.
Greater weight will be given to projects that demonstrate prior teaming of the Joint venture partners. Joint venture participant’s contribution to the organization should be commensurate with their skills and background and should be described in the project execution and quality control plan.
In the evaluation of responsibility and non-price factors, information submitted for a party to the joint venture will only be evaluated to the extent that the terms of the joint venture agreement do not limit such party's performance or financial obligations as a party to the Contract contemplated by this Solicitation.
If a joint venture is being proposed, the offeror must submit a Joint Venture Agreement along with their proposal. The firm must maintain the joint venture for the duration of the contract.
Failure to remain a joint venture may result in the firm’s contract termination.
II.E. Other Information to Submit with Proposal
(1) Representations and Certifications
Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in the System for Award Management accessed via https://www.sam.gov. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301).
(2) Qualifications of Offerors
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract. Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.
II.F. Requirements for Joint Venture Offerors
(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.
(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.
https://www.sam.gov/
(The Solicitation) Pages 13 of 35
(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
III. General Provisions
III.A. Availability of Funds
Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but do not warrant that all such requests will be answered within 10 calendar days. Therefore, prospective offerors should make such requests not less than 10 calendar days prior to the date set for receipt of offers.
III.C. Notice to Small Business Firms
A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results
This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Affirmative Procurement Program
GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to clauses FAR 52.204-4 requiring double sided printing on recycled paper for all reports and FAR 52.223-10 encouraging vendors to practice waste reduction.
III.F. Notice Concerning Preparation of Proposals
Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out; that all pricing and other numerical data is accurately calculated; and that all copies of the Offer contain the same information.
http://www.sba.gov/
(The Solicitation) Pages 14 of 35
III.G. Contractor Performance Information
(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process.
CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is http://www.cpars.gov
Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.
(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS.
The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (http://www.cpars.gov/allapps/cpcbtdlf.htm) and updated as needed.
(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.H. Safeguarding Documents Designated as Sensitive But Unclassified
Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
III.I. Additional Security Requirements http://www.cpars.gov/ http://www.cpars.gov/allapps/cpcbtdlf.htm
(The Solicitation) Pages 15 of 35
Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
III.I. Additional Security Requirements
Safeguarding and Dissemination of Sensitive But Unclassified (SBU) Building Information
This clause applies to all recipients of SBU building information, including offerors, bidders, awardees, contractors, subcontractors, lessors, suppliers and manufacturers.
1. Marking SBU Contractor-generated documents that contain building information must be reviewed by GSA to identify any SBU content, before the original or any copies are disseminated to any other parties.
If SBU content is identified, the Contracting Officer (CO) may direct the contractor, as specified elsewhere in this contract, to imprint or affix SBU document markings to the original documents and all copies, before any dissemination.
2. Authorized recipients.
a. Building information designated SBU must be protected with access strictly controlled and limited to those individuals having a legitimate business need to know such information. Those with a need to know may include Federal, State and local government entities, and nongovernment entities engaged in the conduct of business on behalf of or with GSA. Nongovernment entities may include architects, engineers, consultants, contractors, subcontractors, suppliers, utilities, and others submitting an offer or bid to GSA, or performing work under a GSA contract or subcontract. Recipient contractors must be registered as “active” in the System for Award Management (SAM) database at www.sam.gov and have a legitimate business need to know such information. If a subcontractor is not registered in the SAM and has a need to possess SBU building information, the subcontractor shall provide to the contractor its DUNS number or its tax ID number and a copy of its business license. The contractor shall keep this information related to the subcontractor for the duration of the contract and subcontract.
b. All GSA personnel and Contractors must be provided SBU building information when needed for the performance of official Federal, State, and local government functions, such as for code compliance reviews and for the issuance of building permits. Public safety entities such as fire and utility departments may require access to SBU building information on a need to know basis. This clause must C-2 not prevent or encumber the dissemination of SBU building information to public safety entities.
3. Dissemination of SBU building information:
a. By electronic transmission. Electronic transmission of SBU information outside of the GSA network must use session encryption (or alternatively, file encryption). Encryption must be via an approved NIST algorithm with a valid certification, such as Advanced Encryption Standard (AES) or Triple Data Encryption Standard (3DES), in accordance with Federal Information Processing Standards Publication (FIPS PUB) 140-2, Security Requirements for Cryptographic Modules per GSA policy.
b. By non-electronic form or on portable electronic data storage devices. Portable electronic data storage devices include, but are not limited to CDs, DVDs, and USB drives. Non-electronic forms of SBU building information include paper documents, among other formats.
i. By mail. Contractors must utilize only methods of shipping that provide services for monitoring receipt such as track and confirm, proof of delivery, signature confirmation, or return receipt.
(The Solicitation) Pages 16 of 35
ii. In person. Contractors must provide SBU building information only to authorized recipients with a need to know such information. Further information on authorized recipients is found in Section 2 of this clause.
4. Record keeping. Contractors must maintain a list of all entities to which SBU is disseminated, in accordance with sections 2 and 3 of this clause. This list must include at a minimum: (1) the name of the State, Federal, or local government entity, utility, or firm to which SBU has been disseminated; (2) the name of the individual at the entity or firm who is responsible for protecting the SBU building information, with access strictly controlled and limited to those individuals having a legitimate business need to know such information; (3) contact information for the named individual; and (4) a description of the SBU building information provided. Once “as built” drawings are submitted, the contractor must collect all lists maintained in accordance with this clause, including those maintained by any subcontractors and/or suppliers, and submit them to the CO. For Federal buildings, final payment may be withheld until the lists are received.
5. Safeguarding SBU documents. SBU building information (both electronic and paper formats) must be protected, with access strictly controlled and limited to those individuals having a legitimate business need to know such information. GSA contractors and subcontractors must not take SBU building information outside of GSA or their own facilities or network, except as necessary for the performance of that contract. Access to the information must be limited to those with a legitimate business need to know.
6. Destroying SBU building information. When no longer needed, SBU building information must be destroyed so that marked information is rendered unreadable and incapable of being restored, in accordance with guidelines provided for media sanitization within GSA CIO IT Security 06-32, Media Sanitization Guide and Appendix A of NIST Special Publication 800-88, Guidelines for Media Sanitization.
Alternatively, SBU building information may be returned to the CO.
7. Notice of disposal. The contractor must notify the CO that all SBU building information has been returned or destroyed by the contractor and its subcontractors or suppliers in accordance with paragraphs 4 and 6 of this clause, with the exception of the contractor's record copy. This notice must be submitted to the CO at the completion of the contract to receive final payment. For leases, this notice must be submitted to the CO at the completion of the lease term. The contractor may return the SBU documents to the CO rather than destroying them.
8. Incidents. All improper disclosures of SBU building information must be immediately reported to the CO at _____________ . If the contract provides for progress payments, the CO may withhold approval of progress payments until the contractor provides a corrective action plan explaining how the contractor will prevent future improper disclosures of SBU building information. Progress payments may also be withheld for failure to comply with any provision in this clause until the contractor provides a corrective action plan explaining how the contractor will rectify any noncompliance and comply with the clause in the future.
9. Subcontracts. The contractor and subcontractors must insert the substance of this clause in all subcontracts.
(1) FAR 52.204-9, Personal Identity Verification of Contractor Personnel, January 2011
(Insert clause when contract performance requires contractors to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. Shall not be used when contractors require only intermittent Federally-controlled facilities).
(2) FAR 52.224-1, Privacy Act Notification, April 1984
(The Solicitation) Pages 17 of 35
(3) FAR 52.224-2, Privacy Act, April 1984
(4) GSAR Clause 552.204-9, Personal Identity Verification Requirements, October 2012
(6) FAR 52.204-21, Basic Safeguarding of Covered Contractor Information Systems, Jun 2016.
This project is classified as SBU.
IV. FAR/GSAR Solicitation Provisions
IV.A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition (JAN 04)
(a) Definitions. As used in this provision— “Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and
(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(The Solicitation) Pages 18 of 35
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal.
Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .