U.S. General Services Administration
GSA Industry Day Conference April 26, 2017
Agenda
• Introductions
• Purpose of Industry Day
• Project Background
• Project Scope
• Questions and Answers
• Site Visit
Wednesday, April 26, 2017 9:00 - 11:00 a.m.
Introducing the Project Team
GSA (Owner)
• Claudia Rivera, Contracting Officer
• Ken Chin, Project Executive
• Tom Zick, Project Manager
• Irving Botello, Contracting Officer’s Representative
Introducing the Project Team
Tenant Stakeholders USACE, HHS, FBI, and GSA
Architect/Engineer Perkins Eastman/JB&B JV
Construction Manager as Advisor (CMa) Hill International
Purpose of Industry Day
• This event offers contractors and suppliers the opportunity to take a critical look at the project features, and allows for feedback that could result in a reduction in cost, improve constructability, reduce schedule risk, and provide firsthand experience on best practice methods.
• This event is neither a solicitation nor a request for a proposal.
Project Information
• Project Name: Backfill and Renovation of Floors 16-21
• Building Name: Jacob K. Javits Federal Building
• Building Address: 26 Federal Plaza, New York, NY 10278
• Estimated Price Range: $75-95 Million
• Performance Period: twenty eight (28) months / two (2) Phases
• Estimated RFP Issuance: June 2017
• Estimated Award: November 2017
Site Plan
Interior leakage conditions can only sometimes be tracked back to expansion joint problems
Building Information
Project Scope
• Approximately 320,000 SF
• LEED Gold Interiors
• 265,000 RSF tenant fit out for three (3) different tenant agencies
• Existing restroom renovation (6 floors)
• Asbestos abatement and demolition
• New lobby fire protection system
• Upgraded fire alarm infrastructure system
• New tenant-dedicated emergency generator plant
• New tenant-dedicated chiller plant and cooling tower
Phasing
PHASE 1
PHASE 2B
PHASE 2A
LOBBY FIRE PROTECTION
DEDICATED
GENERATOR/CHILLER
PLANT & COOLING TOWER
• ROOF & PENTHOUSE LEVELS
FIRE ALARM DISTRIBUTION
SYSTEM UPGRADE
• ENTIRE BUILDING & CIT
Existing Conditions: Building Core
Existing Conditions: Tenant Space
New Tenant Spaces
New Tenant Spaces
New Restrooms
Existing Building Entries
Lobby Fire Protection: Proposed Phase 1
Lobby Fire Protection: Proposed Phase 2
Lobby Fire Protection: Proposed Phase 3
Lobby FP: Proposed Phase 3 Section
Questions?
Thank you
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
File details come from the government source that posted it. Updated .