U.S. General Services Administration

GSA Industry Day Conference April 26, 2017

Agenda

• Introductions

• Purpose of Industry Day

• Project Background

• Project Scope

• Questions and Answers

• Site Visit

Wednesday, April 26, 2017 9:00 - 11:00 a.m.

Introducing the Project Team

GSA (Owner)

• Claudia Rivera, Contracting Officer

• Ken Chin, Project Executive

• Tom Zick, Project Manager

• Irving Botello, Contracting Officer’s Representative

Introducing the Project Team

Tenant Stakeholders USACE, HHS, FBI, and GSA

Architect/Engineer Perkins Eastman/JB&B JV

Construction Manager as Advisor (CMa) Hill International

Purpose of Industry Day

• This event offers contractors and suppliers the opportunity to take a critical look at the project features, and allows for feedback that could result in a reduction in cost, improve constructability, reduce schedule risk, and provide firsthand experience on best practice methods.

• This event is neither a solicitation nor a request for a proposal.

Project Information

• Project Name: Backfill and Renovation of Floors 16-21

• Building Name: Jacob K. Javits Federal Building

• Building Address: 26 Federal Plaza, New York, NY 10278

• Estimated Price Range: $75-95 Million

• Performance Period: twenty eight (28) months / two (2) Phases

• Estimated RFP Issuance: June 2017

• Estimated Award: November 2017

Site Plan

Interior leakage conditions can only sometimes be tracked back to expansion joint problems

Building Information

Project Scope

• Approximately 320,000 SF

• LEED Gold Interiors

• 265,000 RSF tenant fit out for three (3) different tenant agencies

• Existing restroom renovation (6 floors)

• Asbestos abatement and demolition

• New lobby fire protection system

• Upgraded fire alarm infrastructure system

• New tenant-dedicated emergency generator plant

• New tenant-dedicated chiller plant and cooling tower

Phasing

PHASE 1

PHASE 2B

PHASE 2A

LOBBY FIRE PROTECTION

DEDICATED

GENERATOR/CHILLER

PLANT & COOLING TOWER

• ROOF & PENTHOUSE LEVELS

FIRE ALARM DISTRIBUTION

SYSTEM UPGRADE

• ENTIRE BUILDING & CIT

Existing Conditions: Building Core

Existing Conditions: Tenant Space

New Tenant Spaces

New Tenant Spaces

New Restrooms

Existing Building Entries

Lobby Fire Protection: Proposed Phase 1

Lobby Fire Protection: Proposed Phase 2

Lobby Fire Protection: Proposed Phase 3

Lobby FP: Proposed Phase 3 Section

Questions?

Thank you

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21

File details come from the government source that posted it. Updated .