Amendment_4_Form_30_and_Revised_bid_sheet.pdf
PDF 89 KB Posted
- Solicitation number
- GS-02P-16-DTC-7001
About this file
Amendment 4 Form 30 and Amended attachment to 1442
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2PQC
Judy Chong Lee, Contracting Officer
The purpose of this amendment is to incorporate:
1. Additional "after hour" option and amended drawings for the Solicitation for the GC Services for the Capital Security Project at Ron DeLugo Federal Courthouse, St. Thomas, USVI.
2. Amended attachment to 1442
U.S. General Services Administration One World Trade Center 55th Floor, Room 5509 New York, NY 10007
U.S. General Services Administration One World Trade Center 55th Floor, Room 5509 New York, NY 10007
GS-02P-16-DTC-7001
Signed on date
09/28/2016
JL
DRAFT Line Items for form 1422, St. Thomas Capital Security Project
September 28, 2016
A. Base contract:
Item No Description Price
1. Physical moves to swing space and permanent space as identified in drawings A 0 09 through A 0 20, “proposed phasing plans” and furniture and equipment moves identified in drawings A 0 21, “Proposed CMD CNTR Phasing”
2. All asbestos abatement as described in contract documents
3. All work not listed in items #1 and #2 above required to complete base contract work as described in contract documents
Total Base Bid Amount (Items #1 - #3)
B. Options (See Specification section 01 24 00, “Options” for description):
Item No Description Price
Option No. 01 “Grand Jury Suite”
Option No. 02 “U. S. Courts Offices”
Option No. 03 “Kanal Gade Alterations:
Option No. 04 “Chief Deputy Restroom”
Option No. 05 Additional Stop at second floor for Elev 01 and Elev
Option No. 06 “Eliminate Chair Rail”
Option No. 07 “Eliminate Wood Panel Wainscot”
Option No. 08 “Late Shift Work Hours”
Option No 09 “Visiting Judge’s Chambers
Option No 10 “Epoxy Flooring”
Option No 11 “SMS Membrane Roofing”
Option No 12 “Tile Wainscot”
Option No 13 “Acrylic Showers”
Option No 14 “Fit Room Mirror”
Option No 15 “Pump House Enclosure”
Option No 16 “Later Shift Work Hours”
| Amendment 4 SF 30 pg 1 print |
| DRAFT line items for form 1442 2016 09 28.docx |
File details come from the government source that posted it. Updated .