Prevailing_Wage_Rates_Passaic_3_20_2015.pdf

PDF 125 KB Posted

Attached to
The Roe FOB Window and Water Remediation Project
Solicitation number
GS02P15DTC7000
Issued by

About this file

Prevailing Wage Rates for Passaic NJ

View the file

Other files

File Type Posted
Tech_Drawing_A_602.pdf PDF
Amendment_0002.pdf PDF
Amendment_1.pdf PDF
Agreement_4_22_2015.pdf PDF
GSA_Form_527__Financial_Information.pdf PDF
Solicitation_4_22_15.pdf PDF
Reps_and_Certs_4_22_2015.pdf PDF
SF1442__4_22_2015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NJ150040 03/20/2015 NJ40

Superseded General Decision Number: NJ20140040

State: New Jersey

Construction Type: Building

County: Passaic County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

1 01/30/2015

2 03/20/2015

ASBE0032-008 09/19/2013

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 45.00 31.69

BRNJ0002-014 05/01/2014

Rates Fringes

BRICKLAYER (Including

Caulking, Cleaning and

Pointing)........................$ 38.25 28.26

4/9/2015file:///C:/Temp/1/Low/BZMM46OV.htm

Work on high stacks: 22% per hour additional.

BRNJ0002-016 05/01/2014

Rates Fringes

MASON - STONE....................$ 38.25 28.26

Work on high stacks: 22% per hour additional.

BRNJ0004-001 11/01/2014

Rates Fringes

CEMENT MASON.....................$ 38.25 29.01

BRNJ0007-003 07/01/2014

Rates Fringes

Marble setter...................$ 55.85 29.73

BRNJ0007-022 06/01/2014

Rates Fringes

Tile finisher..................$ 40.78 27.57

Tile setter....................$ 52.58 30.29

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

* CARP0006-009 11/01/2014

Rates Fringes

CARPENTER (Scaffold Builder).....$ 43.74 56%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

* CARP0006-010 11/01/2014

Rates Fringes

CARPENTER

Including Acoustical

Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 43.74 56%

* CARP0029-008 11/01/2014

Rates Fringes

Soft floor layer...............$ 43.74 56%

CARP0715-007 05/01/2014

Rates Fringes

Millwright.....................$ 43.88 56%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0102-023 06/02/2014

Rates Fringes

ELECTRICIAN (Including Low

Voltage Wiring)

Cable Splicer...............$ 56.29 56.2%

Electrician.................$ 51.17 56.2%

Work forty ft. or more above the ground or protective rigging

(does not apply to pole work, or to use of a manlift or high reach-type lift): 10% per hour additional.

Work with, or the removal of, asbestos materials: 112% times the journeyman rate.

ENGI0825-020 07/01/2013

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 43.07 28.50

GROUP 2.....................$ 41.48 28.50

GROUP 3.....................$ 39.57 28.50

GROUP 4.....................$ 37.94 28.50

GROUP 5.....................$ 36.23 28.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving

Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End

Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side

Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery)

(within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front

End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011-012 08/01/2012

Rates Fringes

Ironworkers:

Reinforcing.................$ 40.74 39.40

Structural, Ornamental......$ 43.54 39.40

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-010 07/01/2012

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt

Spreader, Common or

General Laborer, Landscape

Laborer, Power Tool

Operator and Screedman......$ 29.35 23.07

PAIN0711-018 05/01/2014

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 38.00 20.35

PAIN0711-019 05/01/2014

Rates Fringes

PAINTER (Brush & Roller).........$ 37.72 20.19

PAINTER (Spray)..................$ 40.28 19.98

PAIN0711-021 05/01/2014

Rates Fringes

Glazier........................$ 41.61 20.46

Work welding or using a cutting torch:

$1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PLAS0029-003 05/01/2014

Rates Fringes

PLASTERER........................$ 41.20 22.05

PLUM0024-001 05/01/2014

PLUMBER (Excluding HVAC Pipe

Installation)....................$ 49.36 30.69

PLUM0274-008 05/01/2013

Rates Fringes

PIPEFITTER (Including HVAC

Pipe Installation)...............$ 48.76 29.34

ROOF0010-003 06/01/2014

Rates Fringes

ROOFER (Includes All Types of

Roofs)...........................$ 35.35 19.88

SFNJ0696-006 01/01/2015

Rates Fringes

SPRINKLER FITTER (Fire

Sprinklers)......................$ 56.63 23.42

SHEE0025-005 06/01/2014

Rates Fringes

SHEET METAL WORKER (Including

HVAC Duct Installation)..........$ 44.63 34.87

TEAM0560-002 11/01/2012

Rates Fringes

TRUCK DRIVER

Dump Truck..................$ 32.25 28.78

Off the Road Truck..........$ 32.10 28.78

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver:

$1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs.

DEFINITION OF GROUPS:

GROUP 1:

Driver of the following types of vehicle: dump; flat;

float; pick-up; container hauler; fuel; water sprinkler;

road oil; stringer bead; hot pass; bus; dumpcrete; transit mixer; agitator mixer; half track; winch truck;

side-o-matic; dynamite; powder; x-ray; welding; skid; jeep;

station wagon; stringer; A-frame; dual-purpose truck; truck with mechanical tailgate; asphalt distributor; batch truck;

seeding; mulching; fertilizing; air compressor truck (in transit); parts chaser; escort; scissor; hi-lift;

telescope; concrete breaker; gin pole; stone, sand, asphalt distributor and spreader; nipper; fuel truck (driver of fuel truck including handling of hose and nozzle - entire unit); team driver; vacuum or vac-all trucks (entire unit);

skid truck (debris container - entire unit); concrete mobile truck (entire unit); beltcrete truck; pumpcrete truck; line truck; reel truck; wrecker; tow truck; utility truck; tack truck; cardex person; driver on the following types of vehicle: Broyhill coal tar epoxy truck, Littleford bituminous distributor, slurry seal truck or vehicle, thiokol track master pick-up (swamp cat pick-up); bucket loader dump truck and any rubber-tired tractor used in pulling and towing farm wagons and trailers of any description; on-site repair shop

GROUP 2:

Driver of 3-axle materials truck and float

GROUP 3:

Driver of all Euclid-type vehicles: Euclid; International

Harvester; Wabco; Caterpillar; Koehring, tractor and wagon;

dumpster; dump; bottom, rear and side dump; carry-all and scraper (not self-loading, loading over the top); water sprinkler trailer; water pull and similar types of vehicle;

driver of tractor and trailer-type vehicle: flat, float, I-beam, low bed, water sprinkler, bituminous, transit mix, road oil, fuel, bottom dump hopper, rear dump, office, shanty, epoxy, asphalt, agitator mixer, mulching, stringing, seeding, fertilizing, pole, spread bituminous distributor, water pull (entire unit), tractor trailer, reel trailer, and similar types of vehicle

GROUP 4:

Winch trailer driver

SUNJ2004-016 01/02/2009

ELEVATOR MECHANIC................$ 40.21 11.22

LABORER: Pipelayer..............$ 38.85 0.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION