Amendment_47PB0017B0002_0001.pdf
PDF 91 KB Posted
- Attached to
- Chiller Replacement at the FB in Montpelier, VT
- Solicitation number
- GS-01-P-17-BW-C-0014
About this file
Amendment 0001.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1PQB
Robert Budlong, Contracting Officer
See Attached
1PQB
Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 United States
Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 United States
EQ1PSKM-17-0074
47PB0017B0002
RVT11007
1 3
8/14/2017
7/28/2017
Description of Amendment/Modification
The solicitation referenced in Block #9a, for Chiller Replacement at the Montpelier Federal Building (VT0026ZZ) in Montpelier, Vermont is hereby amended as follows:
1. Provide Pre-Bid Conference Minutes and attendance sheet.
2. This amendment adds the "Contractor Responsibility Questionnaire." Each bidder is to fill out this form and submit with their bid.
3. With regards to the Question 7, the specifications are changed as follows:
a. Remove the aluminum sheet roof assembly over the existing generator radiator cooling exhaust duct.
b. Re-route the 30" x 36" radiator exhaust duct through the side wall of the dike. Supply and install a Ruskin louver to match the size of the duct.
c. Route the new refrigerant exhaust duct as possible within the dike area above or adjacent to the generator ducting. Install the louvre otherwise specified for this system in the dike wall in lieu of the foundation wall as shown.
d. The refrigerant exhaust and the generator radiator cooling exhaust may be combined into a single louver.
e. Seal the foundation along both duct assemblies affected by this work on the inside face and along the outside face of the foundation wall.
f. Repair/replace the aluminum sheet roofing system over the new refrigerant exhaust / existing generator radiator exhaust within the dike.
g. The refrigerant exhaust may NOT discharge into the dike area. R-134a is heavier than air.
4. Provide responses to questions dated August 14, 2017.
5. The Bid due date is NOT extended and remains to be Tuesday, August 29, 2017 at 2:00 PM Eastern Standard Time.
6. Please acknowledge this amendment by one of the methods in block 11.
47PB0017B0002/0001
GSA New England Region
U.S. General Services Administration Thomas P. O'Neill, Jr. Federal Building 10 Causeway Street Boston, MA 02222 www.gsa.gov
Solicitation: 47PB0017B0002
Title: Chiller Replacement at the Montpelier Federal Building
(VT0026ZZ) in Montpelier, Vermont.
Response to questions as of 8/14/2017
Question 1: Sheet M600 specifies a refrigerant exhaust fan. It does not appear to include the CFM. What is the CFM requirement of the fan?
Response: Analysis of the Loren Cook spec sheet for the fan with the data points called out on sheet M600 indicate the fan is to be rated at 2,200 CFM with @ 0.25” SP.
Question 2: Please identify the controls contractor for the current Niagara BAS?
Response: The controls contractor is:
Control Technologies
121 Park Avenue, Suite 20
Williston, VT 05495
P: 802-764-2200
Question 3: Is the driveway along the east side of the building accessible for rigging equipment?
Response: With coordination of the building property manager the driveway to the east of the building will be allocated to the contractor for the purposes of rigging out the old and rigging in the new equipment. It will not be permitted for the contractor to use the driveway as a parking location for their vehicles during regular work days.
Question 4: The riggers will be on site at most two working days. Is it required that the riggers be vetted through the clearance process?
Response: They are included in the clearance process in that their names are included on the Requesting Official’s Contractor Approval List, which is vetted through the GSA security office.
However, there is not a formal investigation of these persons. Any employee entering the mechanical space for fifteen or less calendar days must be escorted by an individual who has been issued a Personal Identity Verification (PIV) card.
Question 5: What louver style is required for the refrigerant vent?
GSA New England Region
U.S. General Services Administration Thomas P. O'Neill, Jr. Federal Building 10 Causeway Street Boston, MA 02222 www.gsa.gov
Response: Please provide a Ruskin ELBD813 Automatic Dual Exhaust Combination Louver Damper (name brand or equal) as the louver. The salient qualities of the louver are that it has a minimum 2,200 CFM capacity throughput as noted in the response to Question 1 above.
Question 6: The refrigerant duct size shown on sheet M-600 is not possible. A 4” sanitary drain runs in the middle of the proposed duct path. No other path is possible. There is spacing for up to a 14” tall by 30” wide duct in the allocated space. What is permitted?
Response: The engineer has designed a duct system to move 2,200 CFM with a .25” SP drop. Provide a duct system to meet that performance requirement.
Question 7: Upon inspection of the refrigerant duct path on exiting the foundation wall, it was found that the ductwork discharges into an enclosed dike area. It is not possible to see the route the new refrigerant duct could take and is it not possible to see what must be done to re-route the generator radiator cooling ducting. The dike projects eight feet from the foundation wall. What is to be done? This is a CHANGE to the requirements set forth on Det. 2 found on sheet M-600.
Response: See amendment 0001 for details.
********************* END OF RESPONSE TO QUESTIONS. *********************