Amendment_0001.pdf
PDF 1 MB Posted
- Solicitation number
- GS-01P-15-BZ-C-0005
About this file
Amendment 0001.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Attachment Page
PAGE 2 OF 3 GS-01P-15-BZ-C-0005/0001
1. CLARIFICATION: Drawing E001 and E102: Conduits serving courtroom audio video devices (EA, EV, LC, LS, E) are to be a minimum of 2”.
2. In Specification 011400, Work Restriction, in subsection 1.3.A, Working Hours: REVISE the normal working hours for this contract shall be from 7:30 AM to 5:00 PM, Monday through Friday, unless otherwise authorized by the Contracting Officer.
3. On page 10 of 22 of Volume II, the Solicitation, in paragraph IV.D in FAR clause 52.222- 23(b) INSERT "0.6%" in the block for "Goals for Minority Participation for Each Trade."
4. On page 15 of 22 of Volume II, the Solicitation, DELETE paragraph VI.C in its entirety and REPLACE with the following:
"VI.C. Total Evaluated Price
The Government will evaluate bids for award purposes by adding the total price for all alternates to the total price for the basic requirement. Evaluation of alternates will not obligate the Government to award the alternate(s). Total Evaluated Price shall be calculated using the prices indicated in the Price Proposal, using the following formula:
Base plus Alternate 1."
5. Incorporate the following language as part of the Scope of Work.
Safeguarding Sensitive Data and Information Technology Resources
In accordance with FAR 39.105, this section is included in the contract.
This section applies to all users of sensitive data and information technology (IT) resources, including awardees, contractors, subcontractors, lessors, suppliers and manufacturers.
The following GSA policies must be followed. These policies can be found at http://www.gsa.gov/directives or https://insite.qsa.govidirectives.
1. CIO P 2100.1 GSA Information Technology (IT) Security Policy
2. CIO P 2100.2B GSA Wireless Local Area Network (LAN) Security
3. CIO 2100.3B Mandatory Information Technology (IT) Security Training
Requirement for Agency and Contractor Employees with Significant Security Responsibilities
4. CIO 2104.1A GSA Information Technology IT General Rules of Behavior
5. CIO 2105.1B GSA Section 508: Managing Electronic and Information
Technology for Individuals with Disabilities
6. CIO 2106.1 GSA Social Media Policy
7. CIO 2107.1 Implementation of the Online Resource Reservation Software
8. CIO 2160.4 Provisioning of Information Technology (IT) Devices
9. CIO 2162.1 Digital Signatures
10. CIO P 2165.2 GSA Telecommunications Policy
11. CIO P 2180.1 GSA Rules of Behavior for Handling Personally Identifiable
Information (PI I)
Attachment Page
PAGE 3 OF 3 GS-01P-15-BZ-C-0005/0001
12. CIO 2182.2 Mandatory Use of Personal Identity Verification (PIV) Credentials
13. CIO P 1878.2A Conducting Privacy Impact Assessments (PIAs) in GSA
14. CIO IL-13-01 Mobile Devices and Applications
15. CIO IL-14-03 Information Technology (IT) Integration Policy
16. HCO 9297.1 GSA Data Release Policy
17. HCO 9297.2B GSA Information Breach Notification Policy
18. ADM P 9732.1D Suitability and Personnel Security
The contractor and subcontractors must insert the substance of this section in all subcontracts.
[End Paragraph]
6. In subsection IV.B.(2), insert the following clauses by reference:
FAR Clause 52.204-2, Security Requirements FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel FAR Clause 52.224-1, Privacy Act Notification FAR Clause 52.224-2, Privacy Act FAR Clause 52.239-1, Privacy or Security Safeguards
7. In subsection IV.B.(3), insert the following clauses by reference:
GSAR Clause 552.204-9, Personal Identity Verification Requirements GSAR Clause 552.236-75, Use of Premises GSAR Clause 552.239-70, Information Technology Security Plan and Security Authorization GSAR Clause 552.239-71, Security Requirements for Unclassified
8. The proposal due date is NOT extended and remains to be Aprils 10, 2015 at 2:00 PM.
9. Please acknowledge this amendment by one of the methods in Block 11.
Descript: The solicitation referenced in Block #9a, for Third Floor Chamber Project at the Edward T. Gignoux Federal Courthouse in Portland, ME. is hereby amended as follows:
See Continuation Page.
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 3 |
| DocNo: 0001 |
| EffDate: APR 02, 2015 |
| ReqNo: 1PSK-15-0031 |
| ProjNo: |
| IssuedByCode: 1PSA |
| IssuedBy: ACQUISITION BRANCH, SVC CENTERS DIV |
GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON MA 02222-1077
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-01P-15-BZ-C-0005 |
| SolDate: MAR 11, 2015 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .