Attachment JA43E Mountain Home Electric Training Tasks
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449.pdf | ||
| JA38 Federal Equivalents092010.pdf | ||
| JA43_Mountain_Home_Electric_Training Requirements_v02_28Sep10.doc | DOC document | |
| JR2 Legislative Authority092010.pdf | ||
| MountainHomeSF3309302010.xpx | XPX file | |
| JR3 Tech Evaluation Categories092010.pdf | ||
| JE1 Subcontracting Plan092010.pdf | ||
| JA39 Past Performance Information092010.pdf | ||
| JA44 Wage Determination.pdf | ||
| MTH RFP Sep 2010.doc | DOC document | |
| JR1 Bill of Sale092010.pdf | ||
| JA1 - Mt Home - EL - v008 - 05Oct10.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J43 Task
| MASTER TASK LIST - Electrical (AFS-3E0X1) Mountain Home AFB | ||||
| OFFERORS NOTES: | ||||
| 1. This document corresponds to the 3E0X1 CFETP, dated 1 October 2007. | ||||
| 2. It is not the government user’s intent that an individual course be developed for each listed task. Conversely, it is strongly suggested that the offer or logically group similar-type tasks into a series of course instructional blocks. A typical course instructional block example can be found in the Career Field Education Training Plan (CFETP) Quality Training Package (QTP). A current copy can be obtained from Air Force e-Pubs @ http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E0X1.pdf | ||||
| 3. A variety of references may be used to develop course instructional block curriculum (to include identified Air Force standards and reference material). Regardless of the choice, any curriculum developed shall reflect only those approved standards/techniques used throughout the industry. Questions relating to the description of a particular task requirement (to include queries on proposed training standards, methods, and instructional block composition) shall be forwarded to the contracting officer for consultation and clarification. | ||||
| 4. Training identified in the following task numbers with an oblonged circle () will be accomplished with conductors/circuits "de-energized". Note: Some tasks will require energizing a conductor/circuit to train on test equipment and to ensure circuits are operational. Contractors are responsible for providing training identified on this Master Task List which contains tasks relevant to safety and electrical distribution equipment/components for installing, maintaining and repairing utilities that were awarded in the privatization contract. | ||||
| * A core task that must be met and signed off by the trainer, certifier & trainee in order for trainee to be qualifed to work on the system at the AF 5-skill Level. | ||||
| ** A core task, that must be met and signed off by the trainer, certifier & trainee in order for trainee to be qualifed to work on the system at the AF 7-skill Level. | ||||
| Task # | Task Title/Performance Objective | Student Required Frequency | QT Qty/Hrs | UGT Qty/Hrs |
| 8 | 8. AFSC SPECIFIC SAFETY STANDARDS |
Ref: AFI 32-1064; AFOSH STD 91-10, 91-25; American Red Cross Adult CPR Handbook, American Heart Association; AFOSH 91-501; UFC 3-560-01; NFPA 70E
| 8.2. | Install | |||||||
| 8.2.2.1 & 8.2.2.2 | Task Title: Safety Standards for AFSs, Confined space, safe entry procedures, test and ventilate for safe entry. Performance Objective: Students will open the access point to an enclosed space, test, and then ventilate the air within that space, re-test the air following ventilation, and then enter the space. | Annual | 22 | / | 2 | 6 | / | 6 |
| 8.3. | Perform Resuce | |||||||
| 8.3.1 | Task Title: Safety Standards for AFSs, Perform rescue, Pole top. Performance Objective: Given an overhead line rescue situation, understand and implement procedures associated with pole top rescue operations. | Annual | 22 | / | 1 | 6 | / | 4 |
| 8.3.1.1 | Task Title: Safety Standards for AFSs, Perform rescue, Bucket Truck. Performance Objective: Given an overhead line rescue situation, understand and implement procedures associated with Bucket Truck rescue operations. | Annual | 22 | / | 1 | 6 | / | 4 |
| 8.3.2 | Task Title: Safety Standards for AFSs, Perform rescue, manhole. Performance Objective: Given a manhole rescue situation, understand and implement procedures associated with man hole rescue operations. | Annual | 22 | / | 1 | 6 | / | 6 |
| 8.4. | Conduct supervisory safety assessment of: | |||||||
| 8.4.1.1 & 8.4.1.2 | Task Title: Maintenance of distribution system. Performance Objective: Maintenance of distribution system over and under 600 volts. | Annual | 22 | / | 2 | 6 | / | 8 |
| 8.4.2.1 & 8.4.2.2 | Task Title: Work on de-energized circuits. Performance Objective: Work on de-energized circuits over and under 600 volts. | Annual | 22 | / | 2 | 6 | / | 8 |
| 8.5. | Conduct safety inspections: | |||||||
| * 8.5.1 & 8.5.2 | Task Title: Hotline tools and Rubber protective equipment. Performance Objective: Conduct safety inspections of hotline tools and rubber. | Annual | 22 | / | 2 | 6 | / | 6 |
| 13 | 13. SUBSTATION EQUIPMENT |
Ref: AFI 32-1064; AFOSH STD 91-10, Lineman's and Cableman's Handbook; ANSI C-2; National Electrical Safety Code
| 13.2. | Install | |||||||
| 13.2.1 | Task Title: Substation equipment, Install, Potential transformers Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install potential transformers. | Annual | 22 | / | 2 | 6 | / | 8 |
| 13.2.2 | Task Title: Substation equipment, Install, Current transformers. Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install current transformers. | Annual | 22 | / | 2 | 6 | / | 8 |
| 13.4. | Troubleshoot substation equipment. | |||||||
| 13.4 | Task Title: Substation equipment, Inspect/Troubleshoot substation equipment. Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures inspect/troubleshoot substation equipment to restore correct operations. | Annual | 22 | / | 2 | 6 | / | 8 |
| 14 | 14. OVERHEAD DISTRIBUTION SYSTEMS |
Ref: AFM 88-9; AFJMAN 32-1082; AFIs 32-1031, 32-1064, 32-1063; AFOSH STD 91-10, 91-501; Lineman's and Cableman's Handbook; ANSI C-2; National Electrical Code; Hot Stick Manual (AB Chance)
| 14.1. | Climb Poles | ||||||||
| * 14.1.1 | Task Title: Overhead distribution systems, Climb poles, using gaffs. | Annual | 22 | / | 2 | 6 | / | 6 | |
| Performance Objective: Use approved methods to safely ascend and descend a wooden utility pole. Accomplish this task using required climbing equipment without falling. | |||||||||
| * 14.1.2 | Task Title: Overhead distribution systems, Climb poles, working on pole components. Performance Objective: Using approved methods, safely belt-in and un-belt using a safety strap to circle, hitchhike up & down, and obtain a correct work position on a wooden utility pole. Accomplish this task using required climbing equipment without falling. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.1.3 | Task Title: Overhead distribution systems, Climb poles, traversing obstacles. Performance Objective: Using approved methods, safely traverse a single crossarm, double crossarm or clevis to obtain a work position on a wooden utility pole. Accomplish this task using required climbing equipment without falling. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.2. | Handle Poles | ||||||||
| 14.2. | Install | ||||||||
| 14.2.1 | Task Title: Overhead distribution systems, Handle poles, Load/Unload poles. Performance Objective: Using approved industry standards, safely handle, load, and unload poles. Accomplish this task without damaging the pole. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.2.2 | Task Title: Overhead distribution systems, Handle poles, Transport poles. Performance Objective: Using approved industry standards safely transport pole to and from work sites. Accomplish this task without damaging the pole. | Annual | 22 | / | 1 | 6 | / | 4 | |
| 14.2.3 | Task Title: Overhead distribution systems, Handle poles, Frame poles. Performance Objective: Using approved industry standards safely frame a three-phase wood pole on the ground. | Annual | 22 | / | 1 | 6 | / | 4 | |
| 14.2.4 | Task Title: Overhead distribution systems, Handle poles, Set utility poles. Performance Objective: Using all necessary equipment, safely install a 40 ft wooden pole. | Annual | 22 | / | 1 | 6 | / | 4 | |
| 14.3.1 () | Task Title: Overhead distribution systems, Install, Guys. Performance Objective: Using a variation of gauged wires, properly install guys such as Sidewalk, Overhead, Span, Down, and Stub guys. | Annual | 22 | / | 2 | 6 | / | 6 | |
| * 14.3.2 () | Task Title: Overhead distribution systems, Install, Overhead line conductors. Performance Objective: Given various scenarios, use necessary equipment to safely install, sag, secure, and energize overhead line conductors. | Annual | 22 | / | 2 | 6 | / | 8 | |
| 14.3.3 () | Task Title: Overhead distribution systems, Install, Anchors Performance Objective: Given various scenarios, properly calculate anchor installation points/depths and install anchors. | Annual | 22 | / | 1 | 6 | / | 6 | |
| 14.3.4. | Pole Equipment | ||||||||
| * 14.3.4.1 () | Task Title: Overhead distribution systems, Install, Pole equipment, Conductor support devices. Performance Objective: Given various scenarios, use necessary equipment to safely install conductor support devises such as Wooden crossarms, epoxy arms, pin insulators, suspension insulators, and spool insulators. | Annual | 22 | / | 1 | 6 | / | 6 | |
| * 14.3.4.2 () | Task Title: Overhead distribution systems, Install, Pole equipment, Transformers. Performance Objective: Given various scenarios, use necessary equipment to safely and properly install transformers using three approaches; installation manually (using a tagline, block & tackle, and transformer gin) directly to utility pole, installation manually using cluster brackets, and installation mechanically (no block & tackle or transformer gin) using a derrick truck winch. | Annual | 22 | / | 2 | 6 | / | 6 | |
| * 14.3.4.3 | Task Title: Overhead distribution systems, Install, Pole equipment, Protective devices. Performance Objective: Given various scenarios, use necessary equipment to safely and properly install over voltage/current protective devises such as lightning arresters and fuse cutouts. | Annual | 22 | / | 2 | 6 | / | 6 | |
| * 14.3.7 | Task Title: Overhead distribution systems, Install, Grounding set Performance Objective: Using all necessary equipment, properly determine grounding set requirements and install on overhead lines. | Annual | 22 | / | 1 | 6 | / | 6 | |
| 14.3.8 | Task Title: Overhead distribution systems, Proper use of hot sticks for energized work, open/close fused cutouts and solid blades, install/remove hot line taps with hot line clamps Performance Objective: Using all necessary equipment, properly use hot sticks, energized cutouts, and hot line clamps on overhead lines. | Annual | 22 | / | 2 | 6 | / | 8 | |
| 14.3.8. | Services | ||||||||
| 14.3.8.1 () | Task Title: Overhead distribution systems, Install, Service, Drops. Performance Objective: Using all necessary equipment, accurately determine service drop wire dimension and distance. Use acquired information to safely install drop from the service entrance to the transformer. | Annual | 22 | / | 1 | 6 | / | 5 | |
| 14.3.8.2 () | Task Title: Overhead distribution systems, Install, Service, Laterals Performance Objective: Using all necessary equipment, safely install service lateral. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.4 | Inspect Poles | ||||||||
| * 14.4 | Task Title: Overhead distribution systems, Inspect poles and installed equipment. Performance Objective: Given equipment, safely perform an inspection of an overhead distribution system pole and installed equipment. | Annual | 22 | / | 3 | 6 | / | 10 | |
| 14.6. | Perform recurring maintenance on overhead distribution equipment | ||||||||
| 14.6 | Task Title: Overhead distribution systems, Perform recurring maintenance on overhead distribution equipment Performance Objective: Using hand tools, test equipment, and blocking and tagging procedures perform recurring maintenance on overhead distribution equipment. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.7. | Isolate system faults. | ||||||||
| 14.7 () | Task Title: Overhead distribution systems, Isolate system faults. Performance Objective: Using test equipment, safety equipment, and blocking and tagging procedures isolate system faults for repair or replacement. | Annual | 22 | / | 2 | 6 | / | 6 | |
| 14.8 () | Task Title: Overhead distribution systems, Splice de-energized overhead conductor. Performance Objective: Given various scenarios, use necessary equipment to safely and properly install a compression sleeve splice and an automatic tension splice on de-energized overhead conductors. | Annual | 22 | / | 1 | 6 | / | 6 | |
| 14.9 () | Task Title: Overhead distribution systems, Splice non-energized overhead conductor | ||||||||
| Performance Objective: Given various scenarios use necessary safety and hot line equipment to safely and properly splice non-energized overhead conductors. | Annual | 22 | / | 2 | 6 | / | 6 | ||
| 14.12 () | Task Title: Overhead distribution systems, Transfer de-energized conductors from old pole to new pole Performance Objective: After reaching a working position on the pole, use necessary safety and hotline equipment to properly transfer de-energized conductors from an old pole to an adjacent new pole. | Annual | 22 | / | 2 | 6 | / | 8 | |
| * 14.14 () | Task Title: Overhead distribution systems, Perform transformer connections. Performance Objective: Given various scenarios, select the proper method to make internal and external connections to a de-energized pole mounted transformer. | Annual | 22 | / | 11 | 6 | / | 12 | |
| 15. UNDERGROUND DISTRIBUTION SYSTEMS |
Ref: AFM 88-9; AFJAM 32-1082; AFI 32-1064; AFOSH STD 91-10, 91-25; Lineman's and Cableman's Handbook; ANSI C-2; National Electrical Safety Code
| 15.1. | Install | |||||||
| 15.1.1 | Task Title: Underground distribution systems, Install, Direct burial cable. Performance Objective: Using necessary equipment, properly install direct burial cable. | Annual | 22 | / | 3 | 6 | / | 10 |
| 15.1.2 | Underground Duct Systems | |||||||
| 15.1.2 | Task Title: Underground distribution systems, Install, Underground duct systems. | Annual | 22 | / | 2 | 6 | / | 8 |
| Performance Objective: Using necessary equipment, properly select and install earthen buried plastic duct systems. | ||||||||
| 15.1.3 | Task Title: Underground distribution systems, Install, Underground cable in duct Performance Objective: Using necessary equipment, properly install direct buried cable through a plastic duct system. | Annual | 22 | / | 2 | 6 | / | 6 |
| 15.1.4 | Transformers | |||||||
| * 15.1.4.1 | Task Title: Underground distribution systems, Install, Transformers, On pads. Performance Objective: Using necessary equipment, properly position, place, anchor (if required), connect and energize a transformer on a concrete or equivalent type pad. | Annual | 22 | / | 4 | 6 | / | 12 |
| 15.1.4.2 | Task Title: Underground distribution systems, Install, Transformers, In Vaults. Performance Objective: Using lifting equipment such as forklift or line truck and working in a two or three man team, install a transformer in a vault. | Annual | 22 | / | 2 | 6 | / | 8 |
| * 15.1.5 | Task Title: Underground distribution systems, Install, Transformers, Grounding set. Performance Objective: Using necessary equipment, properly install a grounding set on a pad mounted transformer. | Annual | 22 | / | 1 | 6 | / | 4 |
| 15.2. | Splice High Voltage Underground Cable | |||||||
| * 15.2.1 | Task Title: Underground distribution systems, Splice high voltage underground cable, Using tape. Performance Objective: Using necessary equipment, properly apply the correct layers of rubber, plastic, semi conductive, and conductive tape to perform a tape splice on a single conductor, jacketed primary cable. | Annual | 22 | / | 3 | 6 | / | 10 |
| 15.2.2 | Task Title: Underground distribution systems, Splice high voltage underground cable, Using pre-form kits. Performance Objective: Using necessary equipment, properly apply a Slip-On Splice and a Heat Shrink Spice to a single conductor, jacketed primary cable. | Annual | 22 | / | 2 | 6 | / | 8 |
| * 15.3 | Task Title: Underground distribution systems, Terminate high voltage underground cable. Performance Objective: Using necessary equipment, fabricate a cold shrink type termination and a tape termination to a single conductor, jacketed primary cable. | Annual | 22 | / | 2 | 6 | / | 8 |
| 15.4. | Inspect | |||||||
| 15.4.1 | Task Title: Underground distribution systems, Inspect, Termination. Performance Objective: Using necessary equipment, properly check terminations for serviceability and maintenance. | Annual | 22 | / | 2 | 6 | / | 4 |
| 15.4.2 | Task Title: Underground distribution systems, Inspect, Underground splices. Performance Objective: Properly check underground splices for serviceability and maintenance. | Annual | 22 | / | 2 | 6 | / | 6 |
| 15.5 | Task Title: Underground distribution systems, Perform High Potential DC Test on Underground Cable. Performance Objective: Using a high potential test set (hy-pot) and a high voltage fault locator (thumper), perform a high potential DC Test on an underground cable. | Annual | 22 | / | 2 | 6 | / | 6 |
| 15.6 | Task Title: Underground distribution systems, Troubleshoot underground cables for faults. Performance Objective: Using necessary equipment, troubleshoot duct housed and direct burial cable for opens, shorts and grounds; conduct locates using a megohmmeter in conjunction with a cable tracer/fault locator. | Annual | 22 | / | 2 | 6 | / | 8 |
| * 15.7 | Task Title: Underground distribution systems, Trace underground cables with a cable test set. Performance Objective: Using industry accepted trace equipment, trace the location and direction of direct burial cable. | Annual | 22 | / | 1 | 6 | / | 4 |
| 15.8 | Task Title: Underground distribution systems, Isolate system faults Performance Objective: Use approved industry standards to properly and safely isolate (remove voltage from) a system fault. | Annual | 22 | / | 2 | 6 | / | 6 |
| * 15.9 | Task Title: Underground distribution systems, Fabricate 200 amp load break elbow and 600 amp dead break elbow. Performance Objective: Using applicable load break elbow kit instructions, properly prepare for and install a load break elbow. | Annual | 22 | / | 4 | 6 | / | 10 |
| * 15.9.1 | Task Title: Underground distribution systems, Remove and install 200 amp load break elbows "energized" using hot sticks and arc flash protective clothing. Performance Objective: Using applicable load break elbow kit instructions, properly remove and install a 200 ampload break elbow. | Annual | 22 | / | 4 | 6 | / | 10 |
| TASK #18 – LIGHTING SYSTEMS (STREET, TRAFFIC, FACILITY, SECURITY, RECREATIONAL) AF Standards/References: AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr ; NFPA 70E; UFC 3-560-01 | ||||||||
| 18.1. | Install | |||||||
| 18.1.2 | Task Title: Lighting Systems (Street, Security, Recreational), Install, Quartz fixtures. Performance Objective: Using applicable manufactures manuals and instructions, properly prepare for and install a Quartz Light Fixture. | Annual | / | / | ||||
| 18.1.3 | Task Title: Lighting Systems (Street, Security, Recreational), Install, Lighting control components Performance Objective: Using necessary equipment, properly install per manufacture guidance a Central “type” lighting control (i.e. Time switch with an astronomical dial and Contactors controlled by a photo cell) and a Integral “type” control (i.e. Photo cells on each luminaire) on a designated lighting system. | Annual | 22 | / | 2 | 6 | / | 8 |
| 18.2. | Adjust | |||||||
| 18.2.1 | Task Title: Lighting Systems (Street, Security, Recreational), Adjust, Controls. Performance Objective: Using applicable manufactures manuals and instructions, properly adjust time switch, contactor, and photo cell lighting system controls. | Annual | 22 | / | 2 | 6 | / | 6 |
| 18.2.2 | Task Title: Lighting Systems (Street, Security, Recreational), Adjust, Fixtures. Performance Objective: Using applicable manufactures manuals and instructions, properly adjust street, security, and recreational light fixtures. | Annual | 22 | / | 1 | 6 | / | 4 |
| 18.3 | Task Title: Lighting Systems (Street, Security, Recreational), Re-lamp lighting system Performance Objective: Using applicable manufactures manuals and instructions, properly re-lamp street, security, and recreational light fixtures. | Annual | 22 | / | 1 | 6 | / | 2 |
| 18.4 | Task Title: Lighting Systems (Street, Security, Recreational), Troubleshoot lighting system. Performance Objective: Using applicable manufactures manuals and instructions, properly troubleshoot and repair street, security, and recreational lighting systems. | Annual | 22 | / | 1 | 6 | / | 6 |
| TASK #20 – ELECTRICAL GROUND SYSTEMS AF Standards/References: AFI 32-1065, NFPA77,NFPA 780, IEEE Standard 142; NFPA 70E; UFC 3-560-01 | ||||||||
| 20.2. | Install | |||||||
| 20.2.1 | Task Title: Electrical ground systems, Install, Primary distribution system grounds. Performance Objective: Using all necessary equipment, properly determine ground requirements and install on primary distribution systems. | Annual | 22 | / | 2 | 6 | / | 8 |
| 20.3. | Maintain | |||||||
| 20.3.2 | Task Title: Electrical ground systems, Maintain, Primary distribution grounds. Performance Objective: Using all necessary equipment, properly maintain the permanent grounds on a primary distribution system. | Annual | 22 | / | 2 | 6 | / | 8 |
| 20.4. | Test | |||||||
| 20.4.2 | Task Title: Electrical ground systems, Test, Primary distribution system grounds Performance Objective: Use portable ground testing equipment or the three-point method to determine the maximum permissible resistance for grounds and grounding systems. Resistance requirements will be predicated on departmental standards, ANSI C2 requirements, or the national electric code. | Annual | 22 | / | 2 | 6 | / | 6 |
| 20.5. | Troubleshoot | |||||||
| 20.5.1 | Task Title: Electrical ground systems, Troubleshoot, Primary distribution system grounds. Performance Objective: Using all necessary equipment, troubleshoot the permanent grounds on a primary distribution system. | Annual | 22 | / | 2 | 6 | / | 8 |
| TASK #22 – TOOLS AND EQUIPMENT AF Standards/References: AFI 32-1064; NFPA 70E; T.O.s 31-10-3, 32-1-2, 32-1-101, 32-1-151, AFOSH STD 91-10; Hot Sticks Manual (AB CHANCE); ANSI C-2; National Electric Safety Code; UFC 3-560-01 | ||||||||
| 22.1. | Maintain | |||||||
| 22.1.1 ** | Task Title: Tools & Equipment, Maintain, Hotline tools. Performance Objective: Given appropriate hotline tools and Personal Protective Equipment (PPE), use materials such as dry tarpaulins, clean rags, hot-stick nonconductive pole cleaner, hot-stick wax, methyl ethyl kettle (MEK) or acetone, Epoxyglas Bond, and a DC hi-pot test set to inspect, maintain, and test hotline tools. Tested Hotline tools IAW American National Standards Institute/American Society for Testing Materials (ANSI or ASTM) standards. | Annual | 22 | / | 2 | 6 | / | 4 |
| 22.1.2 ** | Task Title: Tools & Equipment, Maintain, Rubber Personal Protective Equipment (PPE) Performance Objective: Given appropriate Personal Protective Equipment (PPE), use American National Standards Institute/American Society for Testing Materials (ANSI or ASTM) standards to properly inspect, maintain, and test rubber PPE. | Annual | 22 | / | 2 | 6 | / | 4 |
| 22.1.3. | Protective Equipment | |||||||
| 22.1.3.1 | Task Title: Maintain protective equipment Performance Objective: Rubber | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.1.3.2 | Task Title: Maintain protective equipment Performance Objective: Polyethylene | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.1.4 | Task Title: Maintain Performance Objective: Pole trailer | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.1.5 | Task Title: Tools & Equipment, Maintain, Reel jacks. Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain reel jacks. | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.1.7 | Task Title: Tools & Equipment, Maintain, Handline. Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain handlines. | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.1.8 | Task Title: Tools & Equipment, Maintain, Block & tackle. Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain a block and tackle assembly. | Annual | 22 | / | 2 | 6 | / | 5 |
| 22.1.9 | Task Title: Tools & Equipment, Maintain, Chain hoist Performance Objective: Use applicable manufactures manuals and/or agreed upon government standards to inspect and maintain a chain hoist. | Annual | 22 | / | 2 | 6 | / | 3 |
| 22.1.10 * | Task Title: Tools & Equipment, Maintain, Climbing equipment. Performance Objective: Given appropriate climbing equipment, use materials such as neutral soap, neatsfoot oil, a gaff gauge, a file and a cleaning cloth to properly inspect and maintain climbing equipment. | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.4 | Task Title: Tools & Equipment, Test hotline tools. Performance Objective: Use manufactures manuals and an industry approved portable hot stick tester to test hot line tools. | Annual | 22 | / | 2 | 6 | / | 3 |
| 22.5. | Use Test Equipment | |||||||
| 22.5.4 | Task Title: Use test equipment Performance Objective: Megohmmeter | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.5.11 | Task Title: Use test equipment Performance Objective: Infrared scanner | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.5.12 | Task Title: Tools & Equipment, Use test equipment, Gas detector Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved gas detector to inspect confined spaces for combustible /toxic gases. | Annual | 22 | / | 2 | 6 | / | 4 |
| 22.5.13 | Task Title: Use test equipment Performance Objective: Hot stick tester | Annual | 22 | / | 2 | 6 | / | 4 |
| 22.5.14 * | Task Title: Tools & Equipment, Use test equipment, High voltage phase tester Performance Objective: Given various distribution and transmission circuits, use the high voltage phase tester to measure varying levels of AC voltage. | Annual | 22 | / | 2 | 6 | / | 2 |
| 22.5.15 | Task Title: Use test equipment Performance Objective: Relay tester | Annual | 22 | / | 2 | 6 | / | 6 |
| 22.5.18 | Task Title: Tools & Equipment, Use test equipment, Cable locator Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved cable locator to properly locate direct buried cable. | Annual | 22 | / | 2 | 6 | / | 4 |
| 22.5.19 | Task Title: Use test equipment Performance Objective: High potential DC tester | Annual | 22 | / | 2 | 6 | / | 8 |
| 22.5.20 | Task Title: Tools & Equipment, Use test equipment, High voltage audible indicator Performance Objective: Given various scenarios, use manufacturer’s manuals and an industry approved high voltage audible indicator to locate direct buried cable. | Annual | 22 | / | 2 | 6 | / | 2 |
| * 22.6 | Task Title: Tools & Equipment, Perform operator’s maintenance on aerial lift truck with insulated bucket Performance Objective: Given any commercially approved aerial lift truck with an insulated bucket, use manufacturer’s manuals & periodic maintenance standards to conduct pre, during, and post operational checks. | Annual | 22 | / | 2 | 6 | / | 8 |
| * 22.7 | Task Title: Tools & Equipment, Perform operator’s maintenance on line maintenance truck Performance Objective: Given any commercially approved Line maintenance truck, use manufacturer’s manuals and periodic maintenance standards to conduct pre, during, and post operational checks. | Annual | 22 | / | 2 | 6 | / | 8 |
| * 22.8 | Task Title: Tools & Equipment, Operate aerial lift truck controls Performance Objective: Given any commercially approved aerial lift truck with insulated bucket, apply manufacturer’s guidance and safety precautions to transport, position, operate aloft, and reposition the aerial lift truck. Operational procedures should stress before and during bucket raising, working aloft, and ground operations. | Annual | 22 | / | 1 | 6 | / | 4 |
| 22.9 | Task Title: Tools & Equipment, Operate line maintenance truck controls Performance Objective: Given any commercially approved line maintenance truck, apply manufacture guidance and safety precautions to transport, position, operate, and reposition the line maintenance truck. Operational procedures should stress boom use, power winch, and capstan use. | Annual | 22 | / | 1 | 6 | / | 5 |
| This master task list template document was last revised on 15 Sep 2010 by AFCESA/ CEOF CFM for 3E0X1 |
&L&10Mountain Home AFB Attachment JA43 Exhibit&CElectrical (AFS-3E0X1)&RContract # (TBD) &L&10Mountain Home AFB Attachment JA43 Exhibit&CElectrical (AFS-3E0X1)&RContract # (TBD)
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
&L&10XXXX AFB, XX
Attachment J43-1, Section 2&RContract # (TBD) &L&9* - Denotes 5-level UGT core tasks ** - Denotes 7-level UGT core tasks
File details come from the government source that posted it. Updated .