Group_4-10-R-J037_Revision_0005.pdf
PDF 30 KB Posted
- Solicitation number
- GROUP4-10-R-J037
About this file
GROUP4-10-R-J037-- Revision 0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Group_4-10-R-J037_Revision0004.pdf | ||
| Group_4-10-R-J037_Revision0003.pdf | ||
| Group_4-10-R-J037_Revision0002.pdf | ||
| 17-026_xyz.7z | 7Z file | |
| 17-026a.7z | 7Z file | |
| 17-097.7z | 7Z file | |
| Group_4-10-R-J037_Revision_0001.pdf | ||
| GROUP4-10-R-J037_Plans.pdf | ||
| St-Pete-Hbr-GDR-2017.pdf | ||
| Tampa_Harbor_MD_FY17_GDR_updated_15March2017.pdf | ||
| GROUP4-10-R-J037_Specs_Vol_I.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP4-10-R-J037 SF1442-A1 Revision 0005
ADDENDUM TO THE STANDARD FORM 1442
Tampa Harbor, Maintenance Dredging, 34 and 43-Foot Project, Hillsborough Bay (HB), Ybor Channel, Upper and Lower Sparkman, Port Sutton and East Bay, and St. Petersburg Harbor, Maintenance Dredging, 24-Foot Project, Entrance Channel and Turning Basin, Hillsborough and Pinellas Counties, Florida
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s).
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
Tonya M. Rogers 904-232-1084 Tonya.M.Rogers@usace.army.mil.
Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.
GROUP4-10-R-J037 SF1442-A2 Revision 0005
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 180 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than August 03, August 04, 2017 at 2:00 P.M. Local Time.
USA Engineer District, Jacksonville Contracting Division 701 San Marco Blvd
Jacksonville, Florida 32207-8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
Block 15 -- Telephone No. (include area code): _____________________
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print ________________________________________________
Signature: ________________________________________________ e-Mail: ________________________________________________
Offer Date: _______________________________________________
Block 26 -- This Task Order will be administered by:
Tampa Resident Office 4211 W. Boy Scout Blvd Suite 170
Tampa, FL 33607-5767
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
GROUP4-10-R-J037 Revision 0005
SF 30 CONTINUATION SHEET
Tampa Harbor, Maintenance Dredging, 34-Foot and 43-Foot Project St. Petersburg Harbor Maintenance Dredging, 24-Foot Project
Hillsborough and Pinellas Counties, Florida Revision 0005
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this revision. In some cases, replacement clauses are attached to this revision.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change.
The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
N/A.
Volume 2 of 2 – Technical Specifications:
N/A.
2. DRAWINGS:
N/A
3. OTHER:
Due to a drawing change in REVISION 0004, Offeror(s) SHALL ACKNOWLEDGE REVISION
0004 and REVISION 0005.
(End of Summary of Changes)
| SF-30-Rev0005.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 1 of 2 – Technical Specifications: |
| Volume 2 of 2 – Technical Specifications: |
| 2. DRAWINGS: |
File details come from the government source that posted it. Updated .