GROUP410RJ036Specs_CERTIFIED.pdf
PDF 7 MB Posted
- Attached to
- St. Lucie Inlet, Maintenance Dredging, 7-Foot Project, Cut-1 and Impoundment Basin, Martin County, Florida
- Solicitation number
- GROUP4-10-R-J036
About this file
GROUP4 10RJ036 SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Group4-10-R-J036_Revision_0001.pdf | ||
| GROUP4-10-R-J036_Plans_CERTIFIED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP4-10-R-J036
Jacksonville District
St Lucie Inlet, Maintenance Dredging, 7-Foot Project, Impoundment Basin and Entrance Channel Cut-1
Martin County, Florida
Construction Solicitation and Specifications Volume 1 of 1
31 MAY 2017
GROUP4-10-R-J036 SF 1442-A1
ADDENDUM TO THE STANDARD FORM 1442
St. Lucie Inlet, Maintenance Dredging, 7-Foot Project, Cut-1 and Impoundment Basin, Martin County, Florida
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Price will be evaluated as total base plus option A.
(2) Availability of technically acceptable dredge(s). Note: Coast Guard Certified Equipment is REQUIRED.
(3) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
John Vohlken 904-232-1884 john.d.vohlken@usace.army.mil.
Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.
GROUP4-10-R-J036 SF 1442-A2
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 125 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than June 29, 2017, at 2:00 P.M. Local Time
U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) Prudential Office Building 701 San Marco Blvd.
Jacksonville, Florida 32207-8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
Block 15 -- Telephone No. (include area code): _____________________
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print ________________________________________________
Signature: ________________________________________________ e-Mail: ________________________________________________
Offer Date: _______________________________________________
Block 26 -- This Task Order will be administered by:
WEST PALM BEACH RESIDENT OFFICE
U.S. ARMY CORPS OF ENGINEERS
4400 PGA BLVD., SUITE 203
PALM BEACH GARDENS, FL 33410
PHONE: (561) 472-3500
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
ST. LUCIE INLET, FLORIDA, MAINTENANCE DREDGING
7-FOOT PROJECT, IMPOUNDMENT BASIN AND ENTRANCE CHANNEL CUT-1
MARTIN COUNTY, FLORIDA
GROUP4-10-R-J036 00010A-1
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $____________
0002 EXCAVATION, UNCLASSIFIED 225,000 CUBIC YARD $____________ $____________
CUT-1, TRANSITION AREA, AND IMPOUNDMENT
BASIN RGE. -125 TO RGE. -350, VARIOUS
DEPTHS PLUS 2 FT ALLOWABLE OVERDEPTH
(ESTIMATED QUANTITY, SEE NOTE 1)
0003 TURBIDITY MONITORING 1 LUMP SUM $____________
0004 ENDANGERED SPECIES OBSERVERS 1 LUMP SUM $____________
(SEE NOTE 3)
0005 STANDBY TIME (SEE NOTE 4) 24 HOUR $____________
0006 MOBILIZATION AND DEMOBILIZATION FOR 1 LUMP SUM $____________
NON-CAPTURE SEA TURTLE TRAWL SWEEPING
(HOPPER DREDGE ONLY, SEE NOTE 5)
0007 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 8 DAY $____________ $____________
(HOPPER DREDGE ONLY, ESTIMATED QUANTITY)
(SEE NOTE 5)
TOTAL BASE (ITEMS 0001 THROUGH 0007) $____________
OPTION A
0008 EXCAVATION, UNCLASSIFIED 132,000 CUBIC YARD $____________ $____________
IMPOUNDMENT BASIN RGE. -350 TO RGE. -575,
16 FEET PLUS 2 FT ALLOWABLE OVERDEPTH
(ESTIMATED QUANTITY, SEE NOTE 1)
0009 TURBIDITY MONITORING 1 LUMP SUM $____________
0010 ENDANGERED SPECIES OBSERVERS 1 LUMP SUM $____________
(SEE NOTE 3)
0011 STANDBY TIME (SEE NOTE 4) 24 HOUR $____________ $____________
0012 MOBILIZATION AND DEMOBILIZATION FOR 1 LUMP SUM $____________
NON-CAPTURE SEA TURTLE TRAWL SWEEPING
(HOPPER DREDGE ONLY, SEE NOTE 5)
0013 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 2 DAY $____________ $____________
(HOPPER DREDGE ONLY, ESTIMATED
QUANTITY, SEE NOTE 5)
TOTAL OPTION A (ITEMS 0008 THROUGH 0013) $____________
TOTAL BASE PLUS OPTION A (ITEMS 0001 THROUGH 0013) $____________
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
ST. LUCIE INLET, FLORIDA, MAINTENANCE DREDGING
7-FOOT PROJECT, IMPOUNDMENT BASIN AND ENTRANCE CHANNEL CUT-1
MARTIN COUNTY, FLORIDA
GROUP4-10-R-J036 00010A-2
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY
BE EXCEEDED.
(2) ALL OFFERS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
(3) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED MANATEE
OBSERVER IS REQUIRED FOR CLAMSHELL DREDGING ONLY.
(4) STANDBY TIME IS DEFINED AS WHEN THE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR THE ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND
SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(5) SEA TURTLE NON-CAPTURE TRAWL SWEEPING IS REQUIRED FOR HOPPER DREDGE ONLY WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION, SUBPARAGRAPH "SUSPENSION OF
DREDGING (HOPPER DREDGE ONLY).
(6) HOPPER DREDGING IS SUBJECT TO SEASONAL RESTRICTIONS. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION
FOR APPLICABLE SPECIAL OPERATING CONDITIONS.
00010A-A1
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 19 June 2017. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment / question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are all finalized.
The Solicitation Number is: GROUP4-10-R-J036
The Bidder Inquiry Key is: AW6KS9-R5D2XS
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
St. Lucie Inlet, Maintenance Dredging, 7-Ft Project, Impoundment Basin and Entrance Channel Cut-1, Martin County, Florida
GROUP4-10-R-J036 Addendum
THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC SECTIONS OF THE
ORIGINAL SOLICITATION NUMBER W912EP-10-R-0026.
THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS SPECIFIC TASK ORDER.
REQUEST FOR PROPOSAL NUMBER: GROUP4-10-R-J036
TASK ORDER PROJECT TITLE:
St. Lucie Inlet, Maintenance Dredging, 7-Foot Project, Cut-1 and Impoundment Basin, Martin County, Florida
NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.
ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100 ARE HEREBY PROVIDED:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
30.4% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Martin County, Florida.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ
ADAPTATION)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for -- 08 Jun at 1:00 P.M. Local Time
(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See
(d) below.)
(d) Participants should call Cecilia Muzi at 561-472-3500 (office) to make arrangements.
(e) Core borings are available.
(f) After the site visit, a memorandum summarizing the visit will be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.
(End of provision)
ADDENDUM TO SECTION 00700, CONTRACT CLAUSES
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY PROVIDED:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 125 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,426.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
St. Lucie Inlet, GROUP4-10-R-J036 G-04 Maintenance Dredging, 7-Foot Project, Cut-1 and Impoundment Basin, Martin County, Florida
(End of clause)
ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY PROVIDED:
LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR SUBCONTRACTORS
The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following positions and/or items of subcontracted work: NAMED COAST GUARD
CERTIFIED DREDGE.
(End of paragraph number 999.215-4001)
00800A-i
SECTION 00800A
WAGE DETERMINATIONS & OTHER ATTACHMENTS
LIST OF CONSTRUCTION CONTRACT ATTACHMENTS
NO. TITLE DATE NO. OF PAGES
1 NOTE 1
2 General Decision Number FL170002 02/03/2017 5 3 General Decision Number FL170003 01/06/2017 4 4 General Decision Number FL170167 01/06/2017 5
00800A - 1
Basin and Entrance Channel Cut-1, Martin County, Florida
GROUP4-10-R-J036
NOTE NOTE NOTE
THIS PROJECT INCORPORATES HEAVY CONSTRUCTION, HEAVY DREDGING
AND HOPPER DREDGING WAGE DETERMINATIONS FOR MARTIN COUNTY, FL
THE HEAVY CONSTRUCTION WAGE DECISION MAY ONLY BE APPLIED TO
OPERATIONS OCCURRING ON LAND.
EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF
$10.20 FOR 2017 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-
BACON ACT FOR ALL HOURS PERFORMED ON THE CONTRACT IN CALENDAR
YEAR 2017.
IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE
DECISIONS FURNISHED FOR THIS PROJECT, PLEASE CONTACT:
FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT, U.S. ARMY
CORPS OF ENGINEERS AT 904-232-3761.
General Decision Number: FL170002 02/03/2017 FL2
Superseded General Decision Number: FL20160002
State: Florida
Construction Type: Heavy Dredging
Counties: Florida Statewide.
Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/03/2017
* ENGI0025-002 10/01/2016
Rates Fringes
Dredging : (Hydraulic Dredges Over 20") CLASS A.....................$ 37.25 13.28+a CLASS B1....................$ 32.21 12.88+a CLASS B2....................$ 30.33 12.73+a CLASS C1....................$ 29.50 12.41+a CLASS C2....................$ 28.54 12.33+a CLASS D.....................$ 23.71 11.70+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b Welder......................$ 9.79 1.73+b
CLASSIFICATIONS:
CLASS A: Leverman, Operator.
CLASS B1: Licensed Tug Operator over 1000 HP, Derrick
Operator, Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.
CLASS B2: Licensed Boat Operator, Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor
General Decision Number: FL170003 01/06/2017 FL3
Superseded General Decision Number: FL20160003
State: Florida
Construction Types: Heavy Dredging
Counties: Florida Statewide.
HOPPER DREDGE CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
SUFL1993-010 05/24/1993
Rates Fringes
Self-Propelled Hopper Dredge Drag Tenders................$ 8.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
General Decision Number: FL170167 01/06/2017 FL167
Superseded General Decision Number: FL20160167
State: Florida
Construction Type: Heavy
County: Martin County in Florida.
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
ELEC0728-006 03/01/2016
Rates Fringes
ELECTRICIAN......................$ 30.00 10.85
ENGI0487-014 07/01/2013
Rates Fringes
OPERATOR: Crane All Tower Cranes Mobile, Rail, Climbers, Static- Mount; All Cranes with Boom Length 150 Feet & Over (With or without jib) Friction, Hydraulic, Electric or Otherwise;
Cranes 150 Tons & Over;
Cranes with 3 Drums (When 3rd drum is rigged for work); Gantry & Overhead Cranes; Hydraulic Cranes Over 25 Tons but not more than 50 Tons;
Hydraulic/Friction Cranes;
& All Types of Flying Cranes; Boom Truck..........$ 29.05 8.80 Cranes with Boom Length Less than 150 Feet (With or without jib); Hydraulic Cranes 25 Tons & Under, &
Over 50 Tons (With Oiler);
Boom Truck..................$ 28.32 8.80 OPERATOR: Drill.................$ 25.80 8.80 OPERATOR: Oiler.................$ 22.99 8.80
* IRON0402-004 10/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 22.34 10.15
LABO1652-004 06/01/2013
Rates Fringes
LABORER: Grade Checker..........$ 14.50 4.92
PAIN0452-007 08/01/2014
Rates Fringes
PAINTER: Brush, Roller and Spray............................$ 19.50 8.83
SUFL2009-163 06/24/2009
Rates Fringes
CARPENTER, Includes Form Work....$ 15.50 0.00
CEMENT MASON/CONCRETE FINISHER...$ 16.46 0.00
LABORER: Common or General......$ 10.44 0.00
LABORER: Landscape..............$ 7.25 0.00
LABORER: Pipelayer..............$ 13.93 0.00
LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only)............................$ 10.65 2.19
OPERATOR: Asphalt Paver.........$ 11.59 0.00
OPERATOR: Backhoe Loader Combo............................$ 16.10 2.44
OPERATOR: Backhoe/Excavator.....$ 21.70 0.00
OPERATOR: Bulldozer.............$ 16.07 0.00
OPERATOR: Grader/Blade..........$ 16.00 2.84
OPERATOR: Loader................$ 19.75 3.05
OPERATOR: Mechanic..............$ 14.32 0.00
OPERATOR: Roller................$ 11.25 0.00
OPERATOR: Scraper...............$ 11.00 1.74
OPERATOR: Trackhoe..............$ 20.92 5.50
OPERATOR: Tractor...............$ 10.54 0.00
TRUCK DRIVER, Includes Dump Truck............................$ 10.60 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.73 0.00
TRUCK DRIVER: Off the Road Truck............................$ 12.21 1.97
TRUCK DRIVER: Servicer..........$ 12.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
PROJECT TABLE OF CONTENTS
DIVISION 00 - TECHNICAL INFORMATION
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 DREDGING
35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
ULLAGE PROFILE
35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Section 00 31 21
CONTROL MONUMENT DESCRIPTIONS
00 31 21 - i
Designation: T 693
PID: BBFH83
Stamping: T 693, 2007
Stability: May hold, commonly subject to ground movement
Setting: Object surrounded by mass of concrete
Description: Station is located in Stuart, Florida adjacent to the St Lucie Inlet. From the intersection of A1AN and MacArthur Blvd. Turn right and travel south to Sailfish Point at the northern jetties of the St Lucie Inlet.
Station is located on a concrete seawall 32 feet east of a wooden beach, and 206 east of the west end of seawall. Station is a brass disk set in concrete.
Observed: 2016-09-25T12:01:00Z
Source: OPUS - page5 1209.04
00 31 21-1GROUP4-10-R-J036
DESIGNATION - SNAKE RESET
PID - AF6967
TIDAL BM - This is a Tidal Bench Mark.
MARKER: HORIZONTAL CONTROL DISK
SETTING: SET IN TOP OF CONCRETE MONUMENT
STAMPING: SNAKE 1930 1979
MARK LOGO: NGS
PROJECTION: FLUSH
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE
MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS NOT SUITABLE FOR
SATELLITE OBSERVATIONS - November 03, 2005
00 31 21-2GROUP4-10-R-J036
H I S T O R Y
HISTORY - Date Condition Report By
HISTORY - 1979 MONUMENTED NGS
HISTORY - 1980 GOOD FLDNR
HISTORY - 20040228 GOOD USPSQD
HISTORY - 20051103 GOOD FLDEP
STATION DESCRIPTION
STATION IS ABOUT 1.8 MILES EAST OF PORT SALERNO, ON THE NORTHWEST END
OF ROCKY POINT AND ON THE NORTH SIDE OF A DRIVEWAY ON PRIVATE
PROPERTY.
TO REACH THE STATION FROM THE POST OFFICE IN PORT SALERNO, GO
SOUTHEAST ON STATE HIGHWAY A1A FOR 0.65 MILE TO COUNTY ROAD C-722
(COVE ROAD). TURN LEFT AND GO EAST-NORTHEAST ON C-722 FOR 0.2 MILE TO
MANATEE COVE ROAD ON LEFT. TURN LEFT AND GO NORTHERLY ON MANATEE COVE
ROAD FOR 0.4 MILE TO HORSESHOE ROAD. TURN RIGHT AND GO EAST-NORTHEAST
FOR 1.15 MILES TO SHELL POINT AND STATION ON NORTH SIDE OF DRIVEWAY
BETWEEN DRIVEWAY AND HIGH WATER LINE.
STATION MARK, A STANDARD DISK STAMPED SNAKE 1930 1979, IS SET IN THE
TOP OF A 12-INCH ROUND CONCRETE MONUMENT THAT IS SET FLUSH WITH THE
GROUND. IT IS 13.0 FEET SOUTH…