Revision0001.pdf
PDF 127 KB Posted
- Attached to
- Jacksonville Harbor Maintenance Dredging, 40-Foot Project, Bar Cut-3 Through Cut-9, Duval County, Florida
- Solicitation number
- GROUP4-10-R-J033
About this file
GROUP4-10-R-J033 Revision 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preproposal_Teleconference_Minutes.pdf | ||
| 35_20_23.pdf | ||
| Revision0003.pdf | ||
| Site_Visit_Memo.pdf | ||
| BUCKC-07rev0003.pdf | ||
| Revision0002.pdf | ||
| Jax_Harbor_MD_FY17.pdf | ||
| G4J033Specs_JaxHarborMDFY17.pdf | ||
| Jax_Hbr_FY17_ECI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP4-10-R-J033 SF 1442-A1
ADDENDUM TO THE STANDARD FORM 1442
Jacksonville Harbor, Maintenance Dredging, 40-Foot Project, Bar Cut-3 Through Cut-9, Duval County, Florida
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO
THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER
SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003);
Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP- 13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13-D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D-0013);
Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC
(W912EP-13-D-0015) PROPOSALS WILL NOT BE CONSIDERED FROM ANY
ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE
Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s).
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub- Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A).
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC.
Revision 0001
GROUP4-10-R-J033 SF 1442-A2
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK
ORDER:
Block 9 -- For additional information contact:
Susan Forchette 904-232-2158 Susan.j.forchette@usace.army.mil.
Block 10 -- Magnitude of Construction is between $1,000,000.00 and $5,000,000.00.
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 79 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than 20 December 2016 at 3:00 PM EST.
USA Engineer District Jacksonville Contracting Division 701 San Marco Blvd.
Jacksonville, Florida 32207- 8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: __________________ CAGE: _____________________
Block 15 -- Telephone No. (include area code): _____________________ mailto:Susan.j.forchette@usace.army.mil
GROUP4-10-R-J033 SF 1442-A3
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print _______________________________________________
Signature: _______________________________________________ e-Mail: _______________________________________________
Offer Date: _______________________________________________
Block 26 --This Task Order will be administered by:
North Florida Area Office Boulevard Center Drive Suite 201 Jacksonville, FL 32207
PH: (904) 232-3086
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
GROUP4-10-R-J033 SF 1442-A4
Revision 0001 Summary Sheet
GROUP4-10-R-J033
JACKSONVILLE HARBOR MAINTENANCE
DREDGING, 40-FOOT PROJECT,
BAR CUT-3 THROUGH CUT-9,
DUVAL COUNTY, FLORIDA
The purpose of this revision is to:
1. Revise Addendum to Section 00100, Clause 52.236-27 SITE VISIT
(CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ
ADAPTATION).
CONTRACT DOCUMENTS:
1. Delete this clause in its entirety:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB
1995) (CESAJ ADAPTATION)
a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
b) An organized site visit has been scheduled for – 03 January 2017 at 9:30 AM
EST.
c) Participants will meet at – the Dredge Depot, 3077 Talleyrand Ave., Jacksonville, FL.
d) Participants should call Gavin Jackson (office) on or before 28 December 2016 to make arrangements.
e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 00 31 32 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)
f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be
GROUP4-10-R-J033 SF 1442-A5
made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.
(End of provision)
2. Replace it with this revised clause:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB
1995) (CESAJ ADAPTATION)
a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
b) An organized site visit has been scheduled for – 03 January 2017 at 9:30
AM EST.
c) Participants will meet at – Buck Island Entrance Gate.
d) Participants should call Gavin Jackson (office) on or before 28 December 2016 to make arrangements.
e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 00 31 32 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days).
f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.
(End of provision)
GROUP4-10-R-J033 SF 1442-A6
TECHNICAL SPECIFICATIONS:
No changes.
DRAWINGS:
No changes.
File details come from the government source that posted it. Updated .