Jax_Hbr_FY17_ECI.pdf
PDF 91 KB Posted
- Attached to
- Jacksonville Harbor Maintenance Dredging, 40-Foot Project, Bar Cut-3 Through Cut-9, Duval County, Florida
- Solicitation number
- GROUP4-10-R-J033
About this file
GROUP4-10-R-J033 ECI
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preproposal_Teleconference_Minutes.pdf | ||
| 35_20_23.pdf | ||
| Revision0003.pdf | ||
| Site_Visit_Memo.pdf | ||
| BUCKC-07rev0003.pdf | ||
| Revision0002.pdf | ||
| Revision0001.pdf | ||
| Jax_Harbor_MD_FY17.pdf | ||
| G4J033Specs_JaxHarborMDFY17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING CONSIDERATIONS AND INSTRUCTIONS (ECI)
FOR
JACKSONVILLE HARBOR
MAINTENANCE DREDGING, 40-FOOT PROJECT,
BAR CUT-3 THROUGH CUT-9
DUVAL COUNTY, FLORIDA
PROJECT FEATURES AND SUMMARY
Project work consists of maintenance dredging approximately 192,000 cy of material from Bar Cut-3 thru Cut-9 in Jacksonville Harbor. Material resulting from this work will be placed in Cell A of Buck Island. This project will be a Group 4 MATOC Task Order for Unrestricted Miscellaneous Projects.
KEY DESIGN PERSONNEL
ETL: Mike Cochrane, EN-DW Geologist: Barbara Nist, EN-GG Survey Engineer; Jeff Navaille, EN-DG Specifications Engineer: James Crawford, EN-DC Cost Engineer: Rick Stallings, EN-TC Environmental Specialist: Mike Hollingsworth, PD-EQ
DESIGN CONSIDERATIONS
Project lies downstream of Cut-14/15 Station 0+00, dredge load line certification is required.
Special attention should be given to pipeline placement operations to avoid vegetation damage to the greatest extent possible.
There is an ongoing offloading contract occurring at Buck Island. The USACE contractor will need to coordinate the discharge into Buck Island in order to not impact the ongoing offloading contract held by Jaxport. Marvin Grieve (Jaxport 357-3064) is going to notify their contractor of this emergency dredging event in order to start planning for the discharge which is expected to start mid-January. The contractor can attend the site visit and begin planning coordination efforts.
SITE VISITS BY DESIGN PERSONNEL
Site visits by design personnel will be coordinated through the North Florida Area Office.
_________________________________________________ Date__________________ Jeff Bergen, P.E. Chief, EN-DW
| 2016-12-01T14:32:12-0500 | |
| BERGEN.JEFFREY.EARL.1071199173 |
File details come from the government source that posted it. Updated .