About this file

Technical Specifications Vol. I II - Jacksonville Harbor O M FY16

View the file

Other files

File Type Posted
Revision_0003.pdf PDF
Revision_0002.pdf PDF
Revision_0001.pdf PDF
Plans_-_Jacksonville_Harbor_O M_FY16.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP4-10-R-J029

US Army Corps of Engineers Jacksonville District

Jacksonville Harbor Maintenance Dredging, 40 - Foot and 38 - Foot Projects, Cut-41 Through Cut-55 and Cut-G, Jacksonville, Duval County, Florida

Construction Solicitation and Specifications Volumes 1 and 2

ISSUE DATE: 14 JULY 2016

This page was intentionally left blank for duplex printing.

Revision #0001

GROUP4-10-R-J029 SF1442-A1

ADDENDUM TO THE STANDARD FORM 1442

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 40-FOOT AND 38-

FOOT PROJECTS, CUT-41 THROUGH CUT-55 AND CUT-G, JACKSONVILLE,

DUVAL COUNTY, FLORIDA

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO

THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER

SOLICITATION NUMBER

For Group4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D- 0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13-D-0010); Mike Hooks, Inc. (W912EP-13-D-0011);

Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D- 0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC

(W912EP-13-D-0015)

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN

THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP4, DREDGING

MATOC POOL.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s).

(2) Past performance, to include Dredging MATOC Pools: Group1, Group2 and Group4. *Be advised the Government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS)/Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CCASS/CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.

GROUP4-10-R-J029 SF1442-A2

(5) Revisions – Offers must acknowledge receipt of this Revision by completing

“Notice to Offerors--Blocks 14, 15 and 20” of each revision.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK

ORDER:

Block 9 -- For additional information contact:

John Vohlken 904-232-1884 john.d.vohlken@usace.army.mil.

Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.

Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 85 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than August 16, 2016, at 3:00pm, EDT.

U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) 701 San Marco Blvd.

Jacksonville, Florida 32207-8175

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: ___________________ CAGE: _______________

Block 15 -- Telephone No. (include area code): _____________________

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print ________________________________________________

GROUP4-10-R-J029 SF1442-A3

Signature: ________________________________________________ e-Mail: ________________________________________________

Offer Date: _______________________________________________

Block 26 -- This Task Order will be administered by:

North Florida Area Office Suite 201 4070 Boulevard Center Drive Jacksonville, FL 32206-3474

Phone: (904) 232-3086

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP4-10-R-J029 00010A-1 Rev Am

Jacksonville Harbor Maintenance Dredging, 40 - Foot and 38 - Projects, Cut-41 through Cut-55 and Cut-G, Jacksonville, Duval County, Florida

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

0001 MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $____________

0002 246,000 CUBIC YARD $____________ $____________EXCAVATION, UNCLASSIFIED

CUT-41 STA. 15+00 TO CUT-55 STA. 15+00

TO 40 FT PLUS 2 FT ALLOWABLE

OVERDEPTH, AND CUT-G TO 38 FT PLUS 1

FT ALLOWABLE OVERDEPTH

0003 TURBIDITY MONITORING 1 LUMP SUM $____________

0004 ENDANGERED SPECIES MONITORING 1 LUMP SUM $____________

(HOPPER DREDGES ONLY)

0005 DEDICATED MANATEE AND SEA TURTLE 1 LUMP SUM $____________

OBSERVER (CLAMSHELL DREDGING ONLY)

0006 24 HOUR $____________ $____________ENDANGERED SPECIES STANDBY TIME

(SEE NOTE 5)

TOTAL (ITEMS 0001 THROUGH 0006) $____________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES DEPTH AND ALLOWABLE

OVERDEPTH SINCE THE PREVIOUS DREDGING EVENT. THE CONTRACTOR SHALL NOT PERFORM

WORK IN EXCESS OF THE TOTAL ESTIMATED QUANTITY GIVEN FOR EACH CLIN WITHOUT PRIOR

APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY

MAY BE EXCEEDED.

(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.

(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE

PARAGRAPH 999.214-4018 OF SECTION 00100. SEE CLAUSE 52.214-18 PREPARATION OF BIDS--

CONSTRUCTION OF SECTION 00100.

(4) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED

MANATEE OBSERVER IS REQUIRED FOR CLAMSHELL DREDGING ONLY.

(5) ENDANGERED SPECIES STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN

OPERATION BY REQUEST OF THE CONTRACTING OFFICER OR THE CONTRACTING OFFICER'S

REPRESENTATIVE. STAND-BY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF

ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, BUT NOT DUE TO ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR THE ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND SECTION

01 57 20 ENVIRONMENTAL PROTECTION.

GROUP4-10-R-J029 00010A-2 Rev Am #

SECTION 00010A, Attachment “A”

GROUP4-10-R-J029 00010A-A1

INSTRUCTIONS FOR TECHNICAL INQUIRES AND QUESTIONS

All technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/binKornHome/

To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system.

To self-register go to the ProjNet web page and follow the steps below.

1. Click the BID tab;

2. Select Bidder Inquiry;

3. Under the Agency drop-down menu select USACE;

4. Enter Key for this solicitation listed below, and a valid e-mail address,

5. Click Login.

6. Fill in all required information and click Create User.

7.

Verify that information on next screen is correct and click Continue.

From this page you may view all bidder inquiries or add inquiries. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: GROUP4-10-R-J029

The Bidder Inquiry Key is: ZG2FEK-QHYA5B

THE GOVERNMENT RESERVES THE RIGHT TO LIMIT AND/OR TO NOT RESPOND

TO ANY FURTHER QUESTIONS PERTAINING TO THIS PROJECT RECEIVED

AFTER AUGUST 10, 2016. OFFERORS SHOULD BASE THEIR BIDS ON THE

INFORMATION PROVIDED IN THE SOLICITATION AND ALL ISSUED

AMENDMENTS THERETO.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Jacksonville Harbor Maintenance Dredging, 40-Foot and 30 Foot Projects, CUT-41 Through Cut-55 and Cut G, Jacksonville, Duval County, FLorida

Through Cut-55 and Cut G, Jacksonville, Duval County, FLorida

GROUP4-10-R-J029 Addendum

THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC

SECTIONS OF THE ORIGINAL SOLICITATION NUMBER:

W912EP-10-R-0026

THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS SPECIFIC

TASK ORDER

REQUEST FOR PROPOSAL NUMBER:

TASK ORDER PROJECT TITLE:

Jacksonville Harbor, Maintenance Dredging, 40-Foot and 38-Foot Projects, Cut-41 through Cut-55 and Cut-G

Jacksonville, Duval County, Florida

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100 ARE HEREBY

PROVIDED:

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

21.8% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Duval County, Florida.

(End of clause)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ

ADAPTATION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for -- 26 July 2016 at 10:00am, EDT

(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See

(d) below.)

(d) Participants should call Tony Jones at (904) 232-2144 on or before 25 July 2016 to make arrangements.

(e) Core borings are available.

(f) After the site visit, a memorandum summarizing the visit will be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 85 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,300.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Jacksonville Harbor, GROUP4-10-R-J029 G-02 Maintenance Dredging, 40-Foot and 38-Foot Projects, Cut-41 through Cut-55 and Cut G, Jacksonville, Duval County, Florida

ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR SUBCONTRACTORS

The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following positions and/or items of subcontracted work: NAMED DREDGE.

(End of paragraph number 999.215-4001)

ADDENDUM TO SECTION 00800A, WAGES DETERMINATIONS AND OTHER

ATTACHMENTS

THE FOLLOWING WAGES RATES ARE HEREBY INCORPORATED INTO THIS

TASK ORDER:

LIST OF CONSTRUCTION CONTRACT ATTACHMENTS

No. TITLE DATE NO. OF PAGES

1 NOTE 1

2 General Decision Number: FL160002 01/08/2016 5 3 General Decision Number: FL160003 01/08/2016 4 4 General Decision Number: FL160154 04/01/2016 5

NOTE NOTE NOTE

THIS PROJECT INCORPORATES HEAVY CONSTRUCTION, HEAVY DREDGING

AND HOPPER DREDGING WAGE DETERMINATIONS.

THE HEAVY CONSTRUCTION WAGE DECISION MAY ONLY BE APPLIED TO

OPERATIONS OCCURING ON LAND. IT CANNOT BE APPLIED TO WORK OF ANY

SORT CONDUCTED ABOARD VESSELS OR FLOATING PLANT OF ANY TYPE.

EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF

$10.15 FOR 2016 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-

BACON ACT FOR WHICH THE SOLICITATION IS ISSUED ON OR AFTER

JANUARY 1, 2016.

IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE

DECISIONS FURNISHED FOR THIS PROJECT, PLEASE CONTACT:

FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT, U.S. ARMY

CORPS OF ENGINEERS AT 904-232-3761, FAX 904-232-1954.

General Decision Number: FL160002 01/08/2016 FL2

Superseded General Decision Number: FL20150002

State: Florida

Construction Type: Heavy Dredging

Counties: Florida Statewide.

Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

* ENGI0025-002 10/01/2014

Rates Fringes

Dredging : (Hydraulic Dredges Over 20") CLASS A.....................$ 35.63 12.39+a CLASS B1....................$ 30.81 12.00+a CLASS B2....................$ 29.01 11.86+a CLASS C1....................$ 28.22 11.55+a CLASS C2....................$ 27.30 11.47+a CLASS D.....................$ 22.68 10.85+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, Cut 41 Thru Cut 55 and Cut G,Jacksonville, Duval County,Fl

GROUP4-10-R-J029 SECTION 00800A Page 3

Welder......................$ 9.79 1.73+b

CLASSIFICATIONS:

CLASS A: Leverman, Operator.

CLASS B1: Licensed Tug Operator over 1000 HP, Derrick Operator, Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.

CLASS B2: Licensed Boat Operator, Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.

CLASS C2: Boat Operator.

CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.

PREMIUMS: Additional 20% for hazardous material work

FOOTNOTE APPLICABLE TO ABOVE CRAFTS:

a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.

b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.

INCENTIVE PAY : (Add to Hourly Rate)

Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 4

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 5 average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 6

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP4-10-R-J029 SECTION 00800A Page 7

General Decision Number: FL160003 01/08/2016 FL3

Superseded General Decision Number: FL20150003

State: Florida

Construction Types: Heavy Dredging

Counties: Florida Statewide.

HOPPER DREDGE CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

SUFL1993-010 05/24/1993

Rates Fringes

Self-Propelled Hopper Dredge Drag Tenders................$ 8.21

WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 8 determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 9

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 10

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP4-10-R-J029 SECTION 00800A Page 11

General Decision Number: FL160154 04/01/2016 FL154

Superseded General Decision Number: FL20150154

State: Florida

Construction Type: Heavy

County: Duval County in Florida.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

1 04/01/2016

* ELEC0177-002 11/30/2015

Rates Fringes

ELECTRICIAN......................$ 26.49 11.23

ENGI0673-010 05/01/2013

Rates Fringes

OPERATOR: Oiler.................$ 19.52 9.05

IRON0597-005 02/01/2015

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 22.26 9.10

LABO0517-002 05/01/2014

Rates Fringes

LABORER: Grade Checker..........$ 18.35 6.45

PAIN0164-006 08/01/2014

GROUP4-10-R-J029 SECTION 00800A Page 12

Rates Fringes

PAINTER: Brush, Roller and Spray............................$ 19.50 8.83

SUFL2009-150 06/24/2009

Rates Fringes

CARPENTER........................$ 15.92 0.00

CEMENT MASON/CONCRETE FINISHER...$ 13.23 2.15

LABORER: Common or General......$ 9.84 1.74

LABORER: Landscape..............$ 7.25 0.00

LABORER: Pipelayer..............$ 12.38 1.31

LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only)............................$ 10.63 2.20

OPERATOR: Asphalt Paver.........$ 11.59 0.00

OPERATOR: Backhoe Loader Combo............................$ 16.10 2.44

OPERATOR: Backhoe/Excavator.....$ 12.94 1.49

OPERATOR: Bulldozer.............$ 13.40 1.19

OPERATOR: Crane.................$ 25.00 0.00

OPERATOR: Grader/Blade..........$ 16.00 2.84

OPERATOR: Loader................$ 11.31 2.02

OPERATOR: Mechanic..............$ 14.32 0.00

OPERATOR: Roller................$ 10.03 0.00

OPERATOR: Scraper...............$ 11.00 1.74

OPERATOR: Trackhoe..............$ 20.92 5.50

OPERATOR: Tractor...............$ 10.54 0.00

TRUCK DRIVER, Includes Dump Truck............................$ 14.50 0.00

TRUCK DRIVER: Lowboy Truck......$ 13.06 2.18

TRUCK DRIVER: Off the Road Truck............................$ 12.21 1.97

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 13

WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 14 these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 15

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Jacksonville Harbor Maintenance Dredging, 40-Foot and 38-Foot Projects, GROUP4-10-R-J029 SECTION 00800A Page 16

US Army Corps of Engineers Jacksonville District

Jacksonville Harbor Maintenance Dredging, 40 - Foot and 38 - Foot Projects, Cut-41 Through Cut-55 and Cut-G, Jacksonville, Duval County, Florida

Construction Solicitation and Specifications Volumes 2 of 2

ISSUE DATE: 14 JULY 2016

PROJECT TABLE OF CONTENTS

DIVISION 00 - INFORMATION AVAILABLE TO OFFERORS

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 31 32 GEOTECHNICAL DATA REPORT

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -

TRACKING PROFILE

35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

GROUP4-10-R-J0nn

Jax Harbor MD, 40-Foot & 38-Foot. Projects, Cut 41-55 & Cut- G

01 22 00 SD-01 Preconstruction Submittals G ROSchedule of Values

01 30 00 SD-01 Preconstruction Submittals List of Subcontractors

SD-07 Certificates Signature Authority Drug-Free Work Place Record

01 32 01 SD-01 Preconstruction Submittals

1.2.1 G ROQCS Schedules

1.2.2 G ROBar Chart

1.2.2 G RO'S' Curve

01 33 00 SD-01 Preconstruction Submittals G ROExport File

01 35 25 SD-01 Preconstruction Submittals G RODive Operations Plan

SD-07 Certificates G RODive Personnel Qualifications

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.7 G DOActivity Hazard Analysis (AHA)

1.6.1 G DOCrane Critical Lift Plan

SD-06 Test Reports 1.11Notifications and Reports 1.11.1Accident Reports 1.11.2Crane Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

Jax Harbor MD, 40-Foot & 38-Foot. Projects, Cut 41-55 & Cut- G

01 35 26 1.8Confined Space Entry Permit 1.8Hot work permit 1.13License Certificates

1.5.2.4 G DOCrane Operators

1.11.4Third Party Certification of

Barge-Mounted Mobile Cranes 1.11.3Certificate of Compliance

01 45 05 SD-01 Preconstruction Submittals G ROQuality Control Plan

SD-07 Certificates Letter of Authority

G ROPersonnel Qualifications 01 50 02 SD-01 Preconstruction Submittals

Mobilization/Demobilization Plan SD-02 Shop Drawings

3.4Contractor's Temporary Facilities Temporary Electric Drawings

01 57 20 SD-01 Preconstruction Submittals G DOEnvironmental Protection Plan

SD-02 Shop Drawings G DOTurtle Deflector Device

SD-07 Certificates Qualifications

G DOBird Monitoring Qualifications G DOManatee and Sea Turtle

Observer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

Jax Harbor MD, 40-Foot & 38-Foot. Projects, Cut 41-55 & Cut- G

01 57 20 SD-11 Closeout Submittals Logs/Final Summary Report Project Environmental Summary Sheet

01 57 25 SD-03 Product Data Calibration Standard

SD-06 Test Reports Turbidity Monitoring

35 20 23 SD-01 Preconstruction Submittals Notice of Intent to Dredge

3.1.1Relocation of Navigation Aids SD-02 Shop Drawings Drag Bar

SD-07 Certificates 1.7Historical Period Shipwreck Sites

3.4.6 G DOAcceptance Sections

Surveys Daily/Monthly Report of Operations

Misplaced Material 1.10.1Declaration of Inspection

35 20 26 SD-01 Preconstruction Submittals Dredge Plant Instrumentation Plan

G, SAM-OP-J

G ROContractor Quality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

Jax Harbor MD, 40-Foot & 38-Foot. Projects, Cut 41-55 & Cut- G

35 20 26 SD-06 Test Reports G ROData Appropriately Archived e-mail SD-07 Certificates

G ROLetter of National Dredging Quality Management Program Certification

35 20 28 SD-01 Preconstruction Submittals Dredge Plant Instrumentation Plan Revisions or Addendum

G, SAM-OP-J

G ROContactor Quality Control Plan, section 3.2.5 SD-07 Certificates

G ROLetter of National Dredging Quality Management Program Certification

SD-06 Test Reports G ROData Appropriately Archived e-mail, section 3.2.11

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 31 21

CONTROL MONUMENT DESCRIPTIONS

-- See Attached Control Monument Descriptions --

Jacksonville Harbor Maintenance Dredging, 40-Foot and 30 Foot Projects, CUT-41 Through Cut-55 and Cut G, Jacksonville, Duval County, FLorida GROUP4-10-R-J029

SECTION 00 31 21 Page 1

SECTION 00 31 21 Page 2

DESIGNATION - 872 0215 TIDAL 2

PID - BC0274

TIDAL BM - This is a Tidal Bench Mark.

STATE/COUNTY- FL/DUVAL

MARKER: TIDAL STATION DISK

SETTING: SET IN A RETAINING WALL OR CONCRETE LEDGE

SP_SET: CULVERT HEADWALL

STAMPING: NO 2 1958

MARK LOGO: CGS

MAGNETIC: NO MAGNETIC MATERIAL

STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION

SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR

SATELLITE OBSERVATIONS - June 24, 2004

HISTORY - Date Condition Report By

HISTORY - 1958 MONUMENTED CGS

HISTORY - 20040624 GOOD FLDEP

STATION DESCRIPTION (2004)

THE MARK IS IN JACKSONVILLE, IN SEC. 55, T1S, R27E, TALLAHASSEE MERIDIAN.

TO REACH THE MARK FROM THE INTERSECTION OF U.S. HIGHWAY 17 (NORTH MAIN

STREET) AND HECKSCHER DRIVE (STATE ROAD 105) ONTHE NORTH SIDE OF

JACKSONVILLE, GO EAST ON HECKSCHER DRIVE FOR 0.6 MI TO THE JUNCTION OF

SOMMERS ROAD ON THE RIGHT, TURN RIGHT ON SOMMERS ROAD AND GO SOUTH AND

EAST FOR 0.6 MI TO THE ENTRANCE TO THE U.S. NAVY FUEL DEPOT, CONTINUE

EAST ON SOMMERS ROAD FOR 0.5 MI TO THE JUNCTION OF FOURTH STREET ON THE

RIGHT, TURN RIGHT ON FOURTH STREET AND GO SOUTH FOR 0.2 MI TO THE MARK ON

THE LEFT, SET FLUSH IN THE TOP OF THE EAST END OF THE NORTH CONCRETE

HEADWALL OF A CULVERT UNDER A-ROAD, ABOUT LEVEL WITH FOURTH STREET.

LOCATED 73.0 FT NORTH OF…

This is the start of the file's text. The full file is on GovTribe.