GROUP4-10-R-J029 SF1442-A1 Revision 0002

ADDENDUM TO THE STANDARD FORM 1442

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 40-FOOT AND 38-

FOOT PROJECTS, CUT-41 THROUGH CUT-55 AND CUT-G, JACKSONVILLE,

DUVAL COUNTY, FLORIDA

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO

THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER

SOLICITATION NUMBER

For Group4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D- 0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13-D-0010); Mike Hooks, Inc. (W912EP-13-D-0011);

Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D- 0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC

(W912EP-13-D-0015)

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN

THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP4, DREDGING

MATOC POOL.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s).

(2) Past performance, to include Dredging MATOC Pools: Group1, Group2 and Group4. *Be advised the Government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS)/Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CCASS/CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.

GROUP4-10-R-J029 SF1442-A2 Revision 0002

(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK

ORDER:

Block 9 -- For additional information contact:

John Vohlken 904-232-1884 john.d.vohlken@usace.army.mil.

Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.

Block 11 -- The Contractor shall begin performance within 60 calendar days and complete it within 85 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than August 16, 2016, at 3:00pm, EDT.

U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) 701 San Marco Blvd.

Jacksonville, Florida 32207-8175

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: ___________________ CAGE: _______________

Block 15 -- Telephone No. (include area code): _____________________

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print ________________________________________________

GROUP4-10-R-J029 SF1442-A3 Revision 0002

Signature: ________________________________________________ e-Mail: ________________________________________________

Offer Date: _______________________________________________

Block 26 -- This Task Order will be administered by:

North Florida Area Office Suite 201 4070 Boulevard Center Drive Jacksonville, FL 32206-3474

Phone: (904) 232-3086

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP 4-10-R-J029 Revision 0002

SF 30 CONTINUATION SHEET

SPECIFICATIONS:

ADD the attached Revision Number 0002 Standard Form 30 to the specifications.

1. DESCRIPTIVE CHANGES TO THE SPECIFICATIONS: The following are descriptive changes to the specifications. Specifications should be adequately marked to indicate that they have been changed.

LINE ITEM AND PRICING SCHEDULE

Revise Description for CLIN #0002. Delete page 00010A-1 and replace with the attached revised page 00010A-1.

2. DESCRIPTIVE CHANGES TO DRAWINGS: Delete drawing’s C-19 and replace with the attached revised drawings Cover to C-19.

3. DELETE Clause 52.211-10 and REPLACE with the attached Clause 52.211-10.

GROUP4-10-R-J0nn 00010A-1 Revision 0002

Jacksonville Harbor Maintenance Dredging, 40 - Foot and 38 - Projects, Cut-41 through Cut-55 and Cut-G, Jacksonville, Duval County, Florida

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

0001 MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $____________

0002 246,000 CUBIC YARD $____________ $____________EXCAVATION, UNCLASSIFIED

CUT-41 STA. 15+00 TO CUT-54 STA. 15+00 TO

40 FT PLUS 2 FT ALLOWABLE OVERDEPTH,

AND CUT-G TO 38 FT PLUS 1 2 FT

ALLOWABLE OVERDEPTH

0003 TURBIDITY MONITORING 1 LUMP SUM $____________

0004 ENDANGERED SPECIES MONITORING 1 LUMP SUM $____________

(HOPPER DREDGES ONLY)

0005 DEDICATED MANATEE AND SEA TURTLE 1 LUMP SUM $____________

OBSERVER (CLAMSHELL DREDGING ONLY)

0006 ENDANGERED SPECIES STANDBY TIME 24 HOUR $____________ $____________

(SEE NOTE ***)

TOTAL (ITEMS 0001 THROUGH 0006) $____________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES DEPTH AND ALLOWABLE

OVERDEPTH SINCE THE PREVIOUS DREDGING EVENT. THE CONTRACTOR SHALL NOT PERFORM

WORK IN EXCESS OF THE TOTAL ESTIMATED QUANTITY GIVEN FOR EACH CLIN WITHOUT PRIOR

APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY

MAY BE EXCEEDED.

(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.

(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE

PARAGRAPH 999.214-4018 OF SECTION 00100. SEE CLAUSE 52.214-18 PREPARATION OF BIDS--

CONSTRUCTION OF SECTION 00100.

(4) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED

MANATEE OBSERVER IS REQUIRED FOR CLAMSHELL DREDGING ONLY.

(5) ENDANGERED SPECIES STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN

OPERATION BY REQUEST OF THE CONTRACTING OFFICER OR THE CONTRACTING OFFICER'S

REPRESENTATIVE. STAND-BY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF

ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, BUT NOT DUE TO ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR THE ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND SECTION

01 57 20 ENVIRONMENTAL PROTECTION.

k3endjsc Cross-Out k3endjsc Text Box k3endjsc Text Box

APPROXIMATE SHORELINE

APPROXIMATE SHORELINE

STAGING AREA

EXISTING WEIRS

AND STAGING AREA

SMALL VESSEL DOCK

DISCHARGE PIPES

EXISTING WEIR

ENTRY POINT (SEE NOTE 3)

DREDGE DISCHARGE LINE

TREE LINE

C-19

C

IV

IL

-J

H M

D -C

N p ln .d g n

D

IS

P O

S A

L P

L A

N

NOTES

C U T -4

B A

R T

R A

M I

S L

A N

D C

E L

L

A

GRAPHIC SCALE

N

400'200'0200'

A

A E

A

A

DETAILED INFORMATION.

WILL NOT BE ALLOWED. SEE SPECIFICATION 35 20 23 FOR MORE

6. FUELING OF LAND-BASED EQUIPMENT FROM MOORED VESSELS

REPRESENTATIVE PRIOR TO LANDING OF VESSELS.

SHALL BE APPROVED BY THE CONTRACTING OFFICER'S

5. AREAS FOR BEACHING WORK VESSELS AND UNLOADING BARGES

PARAGRAPH 3.3.2.4.

OPERATIONS SHALL BE REPAIRED ACCORDING TO SECTION 35 20 23,

4. DIKE VEGETATION AND SURFACES DAMAGED BY THE CONTRACTOR'S

CONTRACTING OFFICER'S REPRESENTATIVE.

LOCATION TO BE DETERMINED ON SITE AND APPROVED BY THE

3. APPROXIMATE LOCATION OF DISCHARGE ENTRY SHOWN. EXACT

2. CONTRACTOR SHALL PLACE DREDGED MATERIAL ONLY IN CELL A.

PHOTO.

INFORMATION ONLY. CURRENT SITE CONDITIONS MAY VARY FROM

1. AERIAL PHOTOGRAPH, DATED JANUARY 2014, IS INCLUDED FOR

R E

V

IS

E D T

O A

C C

O M

P A

N Y R

E V

IS

IO

N

F

E

D

C

B

A

F

E

D

C

B

A

10 9 8 7 6 5 4 3 2

10 9 8 7 6 5 3 2 1

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

DEPENDS ON YOU

SAFTEY ON THIS JOB

M .L .C

D U

V A

L

C O

U N

T Y F

L O

R

ID

A

M .R .2 /D .B .V

J U

L Y

J .E .B

D E

P A

R T

M E

N T O

F T

H E A

R M

Y

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E E

R S

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

-F

O O

T A

N D

-F

O O

T P

R O J

E C

T S

J A

C K

S O

N V

IL

L E

H A

R B

O R

C U

T -7 T

H R

O U

G H C

U T -4

X ,0

X ,0

X ,0

X ,0

X ,0

X ,0

X ,0

X ,0

Y=2,203,000

Y=2,204,000

Y=2,205,000

Y=2,206,000

Y=2,207,000

Y=2,209,000

Y=2,208,000

MILL COVE

S T . J

O H

N S R

IV

E R

CELL "B"

CELL "B2"

(SEE NOTE 2)

BARTRAM ISLAND CELL "A"

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 85 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SF 30 CONTINUATION SHEET
00010A-1
Sheet1
Jax C-19
C-19
Jax Harbor C-19.pdf
C-19