GROUP2-18-R-J007 SF 1442-A1
ADDENDUM TO THE STANDARD FORM 1442
INTRACOASTAL WATERWAY, JACKSONVILLE TO MIAMI MAINTENANCE DREDGING, 10- FOOT
PROJECT, VICINITY OF ST. LUCIE INLET AND 11-FOOT PROJECT, VICINITY OF JUPITER INLET, MARTIN AND PALM BEACH COUNTIES, FLORIDA.
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029:
For GROUP 2 use: W912EP18R0029: Cavache, Inc. (W912EP19D0038); CJW Construction (W912EP19D0039); Coastal Dredging Company, Inc. (W912EP19D0040); Cottrell Contracting Corporation (W912EP19D0041); Florida Dredge and Dock, LLC (W912EP19D0042); Southern Dredging Co., Inc. (W912EP19D0043); Southwind Construction Corp (W912EP19D0044);
Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0045)
PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY
LISTED FIRMS INCLUDED IN THE GROUP 2 DREDGING MATOC POOL.
EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:
FACTOR 1 - Availability of technically acceptable dredge(s).
FACTOR 2 - Past performance.
FACTOR 3 – Price.
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
FACTOR 1 - Availability of technically acceptable dredge(s).
The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).
Note: Any type of dredge can be utilized, however if a cutter suction is selected it must be a 16” or larger.
Evaluation Method:
The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.
To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and be available to meet the required period of performance.
FACTOR 2 - Past performance.
NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.
Revision 0002
GROUP2-18-R-J007 SF 1442-A2
Evaluation Method:
Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No.
W912EP18R0029). Therefore, for this task order, all offerors will receive the Past Performance rating of "Acceptable".
Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS),
(2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance and Safety/Security will be reviewed from the aforementioned additional sources to determine if the offeror is “Acceptable” or “Unacceptable.
FACTOR 3 – Price.
The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.
Offerors are required to submit the following:
(1) Completed Bid Schedule (see Section 00010A).
(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the
MATOC
(3) Completed “Addendum to the Standard Form 1442” with the latest revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 7 -- Issued By:
USA Engineer District Jacksonville Contracting Division 701 San Marco Blvd.
Jacksonville, FL 32207-8175
Block 9 -- For additional information contact:
Anelis I. Nazario Castillo
Tel: 904-232-3285
Email: anelis.i.nazario-castillo@usace.army.mil
Block 10. The Government Requires Performance of the Work:
mailto:anelis.i.nazario-castillo@usace.army
GROUP2-18-R-J007 SF 1442-A3
NAICS Code: 237990 Small Business Size Standard: $27.5 MILLION.
You must be registered in the System for Award Management (SAM) in order to receive an award from this Notice of Intent. The SAM website is located at www.sam.gov.
Block 11. The performance period if mandatory. (Refer to FAR Clause 52.211-10 in Section 00700).
Block 12A. The Contractor must furnish any required performance and payment bonds: YES
Block 12B. The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13. Additional Solicitation Requirement
A. Offers to perform the required work are due electronically at the following email addresses by 2:00PM, local time on 26 June 2020: Anelis.I.Nazario-Castillo@usace.army.mil, and carbon copy Tedra.N.Thompson@usace.army.mil and Griselle.Gonzalez@usace.army.mil
B. An offer guarantee is required. An electronic copy of the bid guarantee shall be submitted with the offer and the Original must be received within two calendar days of the submission date for proposals.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the Notice of Intent in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 17, 19 and 20A - 20D below:
Block 14. Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
The project consists of maintenance dredging the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 IWW channel miles apart. The area to be dredged at St. Lucie Inlet is referred to locally as the Crossroads because it is the junction of the IWW, Okeechobee Waterway, and the St. Lucie Inlet channels. The Jupiter Inlet portion of the project consists of maintenance dredging IWW Cuts P-1 through P-9. The excavated material will be piped to the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging IWW Cuts M-3 through M-6. Excavated material will be placed in the St. Lucie inshore impoundment basin for future use as beach renourishment fill. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.
Refer to Section 01 11 00 for complete description.
Magnitude of Construction is between $1,000,000.00 - $5,000,000.00.
http://www.sam.gov/
GROUP2-18-R-J007 SF 1442-A4
Block 15. Telephone No. (Include area code): _____________________
Block 16. Remittance Address: (Include only if difference than Item 14)
Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.
Block 18. The offeror agrees to furnish any required performance and payment bonds.
Block 19. Acknowledgement of Revision (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each).
REVISION
NO.
DATE
Block 20A. NAME AND
TITLE OF PERSON
AUTHORIZED TO SIGN
OFFER (Type or print)
Block 20B. EMAIL
ADDRESS
Block 20C. SIGNATURE Block 20D.
OFFER DATE
Block 26 -- This Task Order will be administered by:
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
West Palm Beach Resident Office
SF 30 CONTINUATION SHEET
IWW JACKSONVILLE TO MIAMI MAINTENANCE
DREDGING, 10-FT PROJECT VICINITY OF
ST. LUCIE INLET, AND 11-FT PROJECT VICINITY OF
JUPITER INLET, MARTIN AND PALM BEACH COUNTIES, FLORIDA
GROUP2-18-R-J007 1 REVISION 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses:
DELETE the Addendum to the Standard Form 1442 and REPLACE with the attached Addendum to the Standard Form 1442
DELETE Design Authentication and REPLACE with the attached Design Authentication.
Volume 2 of 2 – Technical Specifications:
N/A
2. DRAWINGS:
N/A
(End of Summary of Changes)
| Pages from B.08.03+Revision+0001+-+Specs+(IWW+Jupiter+St.+Lucie) |
| B.08.03_Revision 0002_Group2-18-R-J007_SF30 |
| B.08.03_Revision 0002_Group2-18-R-J007_IWW Jupiter St Lucie MD_DesignAuthentication |
File details come from the government source that posted it. Updated .