B.07 Pre-Proposal Conference_GROUP1-26-R-J001_IWW Bakers Haulover.pdf
PDF 978 KB Posted
- Attached to
- INTRACOASTAL WATERWAY MAINTENANCE DREDGING VICINITY OF BAKERS HAULOVER, MIAMI-DADE COUNTY, FLORIDA.
- Solicitation number
- GROUP1-26-R-J001
About this file
This is a pre-proposal conference presentation for a federal dredging and beach placement project solicitation. The U.S. Army Corps of Engineers Jacksonville District is soliciting proposals under Solicitation No. GROUP1-26-R-J001 for intracoastal waterway maintenance dredging in the vicinity of Bakers Haulover, Miami-Dade County, Florida. This is a task order opportunity available exclusively to contractors holding awards under Solicitation W912EP-25-R-0010 (Regional Small Business MATOC for Maintenance Dredging). The work consists of maintenance dredging the Intracoastal Waterway channel and settling basin within Cut-DA-9 to a depth of 10 feet (MLLW), placement of excavated material on Bal Harbour Beach between R-Monuments R-28 and south of R-31, and incidental activities including environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling.
The solicitation is issued under FAR Part 15 contracting by negotiation as a total small business set-aside (NAICS 237990, $37.0 million size standard). The contract type is firm-fixed price with an estimated magnitude of $1,000,000 to $5,000,000. Proposals must be submitted electronically via PIEE by May 13, 2026, at 2:00 PM EDT. The bid guarantee is 20% of bid price or $3,000,000, whichever is less, with performance and payment bonds due within 10 calendar days after award. Award will be made using Lowest Price Technically Acceptable (LPTA) criteria. The contractor must commence work within 60 calendar days of notice to proceed and complete all work within 100 calendar days, with liquidated damages of $2,458 per calendar day of delay. Proposals require a Title Page, Volume I (Technical Merit for Dredging, 25 pages maximum), Volume II (Past Performance, 25 pages), and Volume III (Price, no page limit). A site visit was held April 21, 2026. Technical inquiries close via ProjNet on April 27, 2026, at 5:00 PM EDT (Solicitation Number: GROUP1-26-R-J001; Bidder Inquiry Key: 26E422-4GMUG4BD). Significant environmental requirements include shorebird monitoring during breeding season (February 15 through September 1), piping plover and rufa red knot surveys, sea turtle monitoring and relocation (March 1 through November 30) with a mandatory 65-day pre-construction monitoring period, and seagrass monitoring with pre- and post-construction benthic resource surveys within 100 meters of dredging activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Working Today to Build a Better Tomorrow
Pre-Proposal Conference
Presented by:
Jacksonville District
April 22, 2026
SOLICITATION NO. GROUP1-26-R-J001
INTRACOASTAL WATERWAY MAINTENANCE DREDGING
VICINITY OF BAKERS HAULOVER, MIAMI-DADE COUNTY,
FLORIDA.
Thank you for joining, we will begin shortly.
Please mute your microphone.
PRE-PROPOSAL CONFERENCE: AGENDA
• INTRODUCTION
• PROJECT OVERVIEW
• TECHNICAL OVERVIEW
• ENVIRONMENTAL REQUIREMENTS
• CONTRACTING OVERVIEW
• OTHER ADMINISTRATIVE ITEMS
• RESOURCES
• CLOSING REMARKS
PROJECT OVERVIEW
PRE-PROPOSAL CONFERENCE: PROJECT OVERVIEW
SOLICITATION NUMBER: GROUP1-26-R-J001
PROJECT TITLE: Intracoastal Waterway Maintenance Dredging Vicinity of Bakers Haulover, Miami- Dade County, Florida.
DESCRIPTION OF WORK: The project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Bakers Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but is not limited to: environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling.
PROJECT LOCATION: The project is located on the east coast of Florida in Miami-Dade County.
TECHNICAL OVERVIEW
PRE-PROPOSAL CONFERENCE: DREDGING OVERVIEW
• Maintenance dredging of the IWW channel and settling basin within Cut-DA-9 to a required depth of 10 ft
(MLLW)
• Pre- and post-construction benthic resource monitoring near dredging activities
• Placement of material on Bal Harbour Beach between R-Monuments R-28 and just south of R-31
PRE-PROPOSAL CONFERENCE: BEACH PLACEMENT
• Beach template:
• 285 ft berm that transitions to a 215 berm
• Berm elevation +6.1 ft
• 1V:11H slope to existing grade
• Special dressing requirement: Grade 1V:60H slope from the foreshore break in the berm extending 60 ft landward
• See Sec 35 20 23 paragraph 3.5.1.10 for details
• Pre- and post-construction beach placement surveys
PRE-PROPOSAL CONFERENCE: STAGING AND ACCESS
• Staging area at north end of the project near Bal Harbour Jetty
• Rehabilitation project at Bal Harbour Jetty may be ongoing during performance of the contract. See Section 01 11 00 paragraph 1.2.4.1 for details regarding necessary coordination.
• Staging area at south end of the project near R-31
• Access provided at 96th St
ENVIRONMENTAL REQUIREMENTS
PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL
REQUIREMENTS
Shorebird Monitoring:
The contractor is responsible for this action or subcontracting this work to a qualified bird monitor (see Sec. 01 57 20 Section 1.9.1.)
• Shorebird breeding season dates for this project area are February 15 through September 1 (note that while most species have completed the breeding cycle by September 1, flightless young may be present through September and must be protected if present).
• Bird surveys are to be conducted in all potential beach-nesting bird habitats within the project boundaries that may be impacted by construction or pre-construction activities. Breeding season surveys are to begin on the first day of the breeding season or 10 days prior to project commencement (including survey activities and other pre-construction presence on the beach), whichever is later.
• Any parts of the project where “project activities” on the beach take place entirely outside the breeding season, do not require shorebird surveys.
• In the event that the project is being constructed during breeding season, the contractor must perform all necessary shorebird requirements detailed in Sections 3.1.5.8, 3.1.5.9, and 3.1.5.10 of the Sec. 01 57 20.
• If all project activities are completed, and all personnel and equipment have been removed from the beach prior to the end of the breeding season, route surveys must continue to be conducted at least weekly through the end of the breeding season.
• Surveys are to also determine whether the completed project has attracted birds to the renourished area and appropriate shorebird buffer zones are to be installed and removed as per required in this authorization.
• Reporting: Within 30 days of completion of the project, submit the Logs/Summary of Bird Nesting Monitoring Report to the
Project Biologist, Contracting Officer and cc the Environmental Compliance POC.
REQUIREMENTS
Piping Plover and Rufa Red Knot Protections:
• One pre-construction piping plover and rufa red knot survey will be conducted within a 10-day timeframe beginning the first Friday in February, as outlined in the Florida Shorebird Alliance's Winter Shorebird Survey (https://flshorebirdalliance.org ).
• If the February pre-construction survey is not possible, two pre-construction piping plover and rufa red knot surveys will be conducted at least 15 days apart and reported to the Contracting Officer. Pre-construction surveys are not to be conducted between May 16 and July 14.
• These requirements are detailed in Section 3.1.5.10 of the Sec. 01 57 20.
• Reporting: Pre-Construction Piping Plover And Rufa Red Knot Survey(S) must be provided to the
Contracting Officer within 10 days after NTP.
REQUIREMENTS
Sea Turtle Monitoring:
• As per Section 1.9.3.1 of the Sec. 01 57 20, an FF&WCC permitted subcontractor is required to be approved by the Contracting Officer to accomplish the sea turtle monitoring and relocation of this section unless they demonstrate to the satisfaction of the Contracting Officer the capability to accomplish sea turtle monitoring and relocation by obtaining a permit from the FF&WCC for daily monitoring and relocation that is specific to the project beach area.
• The current MTPH for this area is Sara Tytlar from the county, but her permit does not include relocations, so her permit would need to be amended with FWC. A sub-contractor could be utilized for this project as well. The contractor would have to coordinate this.
• The marine turtle nesting season is from March 1 through November 30.
• The marine turtle nest monitoring/relocation requirements are detailed in Section 3.1.5.5 of Sec. 01 57 20.
• If dredging and placement of material on Florida Beaches has not commenced prior to March 1, commence turtle monitoring and nest location activities for a period of 65 days prior to performing work (including movement of equipment) in the beach fill area or commence turtle monitoring on March 1st whichever date is later. In such case, after turtle monitoring and nest location/relocation activities have been performed for a period of 65 days, commence work in the beach fill area and continue the monitoring activities concurrently with performance of the work. Turtle monitoring and nest location/relocation activities are required through November 30 or until completion of the work on Florida Beaches, whichever is earlier.
• The contractor cannot commence construction until the turtle monitoring and nest location/relocation activities have been performed for the 65-day period.
• Reporting:
– Daily turtle monitoring logs must be taken, and the results should be submitted weekly to the contracting officer, project biologist, and carbon copy the environmental compliance POC.
– Submit the Logs/Summary of Marine Turtle Nesting and Relocation to the Project Biologist, Contracting Officer, and carbon copy the
Environmental Compliance POC within 30 days of completion of the project. Include the project location (FDEP-R monuments), dates of construction, descriptions and locations of self-release sites in this report.
REQUIREMENTS
Seagrass Monitoring:
• Refer to the Biological Monitoring Plan for specifics regarding benthic resource monitoring requirements:
• Section 2.0 – Atlantic Intracoastal Waterway (AIWW) Channel Monitoring
• Section 3.0 – Monitoring Team Requirements
• See also Section 1.9.3 of Sec. 01 57 20 for additional resource monitoring qualifications
• Section 4.0 – Monitoring Schedule
• Section 5.0 – Reporting Requirements
• Each dredging event of the AIWW project area will require an immediate pre-construction monitoring event (within 60 days of dredging mobilization), and an immediate post-construction monitoring event (within 60 days of dredging completion).
• Commencement dates of monitoring events shall be reported via email to the FDEP JCP Compliance Officer (JCPCompliance@floridadep.gov) roughly seven
(7) days prior to their start and the day that monitoring begins.
• Section 5.2 – Pre-Construction Monitoring Data specifies that an immediate pre-construction monitoring event shall be completed prior (no more than 90 days) to each dredging event. At least 30 days prior to the commencement of construction, all immediate pre-construction monitoring data shall be submitted.
• Section 5.3 – Post-Construction Monitoring Data specifies that all post-construction monitoring data shall be submitted within 45 days of completing each post-construction monitoring event.
• Pre- and post-construction monitoring (resource edge delineation and transect surveys) shall be conducted for all areas within 100 meters of any dredging activities.
• Reporting:
• Within 90 days of completing each post-construction monitoring event, a written monitoring report shall be submitted.
• Brief progress reports shall be submitted (emailed) weekly to the FDEP JCP Compliance Officer until each monitoring event is completed. Immediately upon completion, the FDEP JCP Compliance Officer shall be notified that the monitoring event has been completed.
CONTRACTING OVERVIEW
Ruth C. Rodriguez, Contracting Officer
Email: Ruth.C.Rodriguez@usace.army.mil
Nicole Batista-Cruz, Contract Specialist Email: Nicole.M.Batista-Cruz@usace.army.mil mailto:Ruth.C.Rodriguez@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil
15PRE-PROPOSAL CONFERENCE: ACQUISITION
APPROACH
Solicitation No. GROUP1-26-R-J001
This opportunity is available only to contractors awarded a Contract under Solicitation
W912EP-25-R-0010, SAD, REGIONAL SB MATOC TASK ORDER FOR MAINTENANCE
DREDGING.
• Contracting Method: FAR Part 15 Contracting by Negotiation - Request for Proposals (RFP), Total Small Business Set-Aside.
• Type of Contract: Firm-Fixed Price (FFP). (FAR clause 52.216-1)
• Bid Guarantee: Electronic copy of the bid guarantee shall be submitted with the proposal. The bid guarantee shall be 20% of bid price or $3,000,000.00, whichever is less. (FAR clause 52.228-1)
• Payment and Performance Bonds: The offeror must furnish any required Performance and Payment Bonds within 10 calendar days after Award.
16PRE-PROPOSAL CONFERENCE: ACQUISITION
APPROACH
• Estimated Magnitude of Construction: $1,000,000.00 - $5,000,000.00.
• Applicable North American Industry Classification System (NAICS): 237990 (Exception), Dredging and Surface Cleanup Activities. The Small Business Size Standard for dredging is $37.0 million.
• Estimated Period of Performance: The Contractor shall be required to (a) commence work under this contract within sixty (60) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than one hundred (100) calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. (FAR clause 52.211-10)
• Liquidated Damages: $2,458.00 for each calendar day of delay until the work is completed or accepted. (FAR clause 52.211-12)
• Site Visit: Held on April 21, 2026, at 11:00 AM EDT.
17PRE-PROPOSAL CONFERENCE: PROPOSAL SUBMISSION
REQUIREMENT
• Proposal Submission: Each file should begin with the solicitation number, followed by the word ‘‘RESPONSE’’, followed by your firm’s names, and finally the Volume Number / Document title.
Example: “GROUP1-26-R-J001_Response_[Firm name]_Volume 1.pdf”
• Transmission Method: Electronically via Procurement Integrated Enterprise Environment (PIEE).
Proposals must be received by the Government no later than May 13, 2026, at 2:00 PM (EDT). Please see paragraph 9 of the RFP Letter, Electronic Proposals, for more details.
• ALL REVISIONS MUST BE ACKNOWLEDGED (IF ANY).
• You must be registered in the System for Award Management (SAM) in order to receive an award from this RFP.
PRE-PROPOSAL CONFERENCE: BASIS FOR THE AWARD
Lowest Price Technically Acceptable (LPTA)
• Subject to the provisions contained herein, award will be made to one offeror who is deemed responsible in accordance with FAR 9.104-1; whose proposal conforms to the solicitation requirements; provides the lowest evaluated price; and whose proposal, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, meets the technically acceptable standard for the non-price factors. Prices will be evaluated to determine fair and reasonableness in accordance with FAR 15.404-1.
19PRE-PROPOSAL CONFERENCE: PROPOSAL
REQUIREMENTS
• Your proposal shall include the following items. Failure to provide any of these requirements may result in your offer being rejected.
TECHNICAL INQUIRIES AND QUESTIONS:
• ProjNet closes on April 27, 2026, at 5:00 PM, EDT.
• All Inquiries must be submitted via ProjNet for an official answer.
PRE-PROPOSAL CONFERENCE: OTHER ADMINISTRATIVE
ITEMS
PRE-PROPOSAL CONFERENCE: RESOURCES
System for Award Management (SAM):
www.sam.gov
Procurement Integrated Enterprise Environment (PIEE):
https://piee.eb.mil/
ProjNet:
www.projnet.org http://www.sam.gov/ https://piee.eb.mil/ http://www.projnet.org/
PRE-PROPOSAL CONFERENCE: QUESTIONS
Please submit any questions via ProjNet.
ProjNet closes on April 27, 2026, by 5:00 PM EDT.
Solicitation Number is: GROUP1-26-R-J001 Bidder Inquiry Key is: 26E422-4GMUG4BD
PRE-PROPOSAL CONFERENCE: CLOSING REMARKS
Thank you!
| ����Solicitation No. GROUP1-26-R-J001��Intracoastal Waterway Maintenance Dredging �Vicinity of Bakers Haulover, Miami-Dade County, Florida.���� |
| PRE-PROPOSAL CONFERENCE: AGENDA |
| Slide Number 3 |
| ��PRE-PROPOSAL CONFERENCE: PROJECT OVERVIEW�� |
| Slide Number 5 |
| ��PRE-PROPOSAL CONFERENCE: dredging overview�� |
| ��PRE-PROPOSAL CONFERENCE: beach placement �� |
| ��PRE-PROPOSAL CONFERENCE: staging and access�� |
| Slide Number 9 |
| ��PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL REQUIREMENTS�� |
| ��PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL REQUIREMENTS�� |
| ��PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL REQUIREMENTS�� |
| ��PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL REQUIREMENTS�� |
| Slide Number 14 |
| PRE-PROPOSAL CONFERENCE: Acquisition APPROACH |
| PRE-PROPOSAL CONFERENCE: Acquisition APPROACH |
| PRE-PROPOSAL CONFERENCE: PROPOSAL SUBMISSION REQUIREMENT |
| PRE-PROPOSAL CONFERENCE: BASIS FOR THE AWARD |
| PRE-PROPOSAL CONFERENCE: PROPOSAL REQUIREMENTS |
| ��PRE-PROPOSAL CONFERENCE: OTHER ADMINISTRATIVE ITEMS�� |
| ��PRE-PROPOSAL CONFERENCE: resources�� |
| PRE-PROPOSAL CONFERENCE: Questions |
| �PRE-PROPOSAL CONFERENCE: CLOSING REMARKS� |
File details come from the government source that posted it. Updated .