Revision 0003 GROUP1-18-R-J018 SF1442-A1

ADDENDUM TO THE STANDARD FORM 1442

REVISION 0003

06 August 2020

TAMPA HARBOR MAINTENANCE DREDGING 43 & 44 FOOT PROJECT TAMPA BAY

CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS AND UPPER CHANNELS,

HILLSBOROUGH COUNTY, FLORIDA

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE

FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

W912EP18R0029, GROUP 1 – UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc.

(W912EP19D0029);Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034);

The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 – UNRESTRICTED DREDGING

MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:

FACTOR 1 – Availability of technically acceptable dredge(s).

FACTOR 2 – Past performance.

FACTOR 3 – Price.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.

Revision 0003 GROUP1-18-R-J018 SF1442-A2

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and be available to meet the required period of performance.

FACTOR 2 – Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Evaluation Method:

Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No.

W912EP18R0029). Therefore, for this task order, all offerors will receive the Past Performance rating of "Acceptable".

Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance and Safety/Security will be reviewed from the aforementioned additional sources to determine if the offeror is “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

(3) Completed “Addendum to the Standard Form 1442” with the latest revision.

Revision 0003 GROUP1-18-R-J018 SF1442-A3

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. Issued By:

USA Engineer District Jacksonville Contracting Division 701 San Marco Blvd.

Jacksonville, FL 32207-8175

Block 9. For additional information contact:

A. Name: Timothy Humphrey

Email Address: Timothy.G.Humphrey@usace.army.mil

B. Telephone No.: (904) 232-1072

Block 10. Magnitude of Construction: Between $10,000,000.00 and $20,000,000.00

Description of Work: See Technical Specifications Section 01 11 00 for description of work.

THIS SOLICITATION IS FOR GROUP 1 – UNRESTRICTED

You must be registered in the System for Award Management (SAM) in order to receive an award from this Notice of Intent. The SAM website is located at www.sam.gov.

The NAICS Code for this Notice of Intent is 237990 and the Small Business Size Standard is $27.5 million.

Block 11. The performance period is mandatory. (See FAR Clause 52.211-10 in Section 00700).

Block 12A. The Contractor must furnish any required performance and payment bonds: Yes

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Block 13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offers to perform the work required are due electronically at the following email address by 2:00 PM, local time on 10 August 2020: timothy.g.humphrey@usace.army.mil and send a carbon copy (cc) to tedra.n.thompson@usace.army.mil andgriselle.gonzalez@usace.army.mil.

B. An offer guarantee is required. An electronic copy of the bid guarantee shall besubmitted with the offer while the Original must be received within two calendar days of the proposal response date.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

mailto:Timothy.G.Humphrey@usace.army.mil http://www.sam.gov/ mailto:timothy.g.humphrey@usace.army.mil mailto:tedra.n.thompson@usace.army.mil mailto:griselle.gonzalez@usace.army.mil

GROUP1-18-R-J018 SF1442-A4 Revision 0003

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will berejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19 and 20A - 20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

Block 15. TELEPHONE NO. (Includearea code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS

(The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

GROUP1-18-R-J018 SF1442-A5 Revision 0003

Block 20A.

Name and Title of Person

Authorized to Sign Offer (Type or print)

Block 20B.

Email Address

Block 20C.

Signature

Block 20D.

Offer Date

Block 26 --This Task Order will be administered by:

Tampa Resident Office 4211 W. Boy Scout Blvd Suite 170 Tampa, FL 33607

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP1-18-R-J018 1 REVISION 0003

SF 30 Addendum

TAMPA HARBOR MAINTENANCE DREDGING 43 & 44 FOOT PROJECT TAMPA BAY CUTS,

GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS AND UPPER CHANNELS, HILLSBOROUGH

COUNTY, FLORIDA

SUMMARY OF CHANGES

The text changes have been updated with additions noted by Bold Green Text and deletions noted by line/cross-outs and Bold Red Text, and pertain only to changes made by this revision. The entire section is replaced if there is any change.

Technical Specifications:

Delete SECTION 00010A LINE ITEMS AND PRICING SCHEDULE and Replace with Revised SECTION 00010A LINE ITEMS AND PRICING SCHEDULE.

(End of Summary of Changes)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR, MAINTENANCE DREDGING, 43 & 44-FOOT PROJECT,

TAMPA BAY CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS

AND UPPER CHANNELS, HILLSBOROUGH COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

CUT-A (HB) AND CUT-C (HB)

STATION 0+00 TO STATION 231+00

0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________

0002 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 230,000 CUBIC YARD $___________ $_______________

0003 TURBIDITY MONITORING JOB $_______________

0004 ENVIRONMENTAL SPECIES MONITORING JOB $_______________

0005 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWLING AND RELOCATION

(HOPPER DREDGES ONLY) (SEE NOTE 3) JOB $_______________

0006 SEA TURTLE TRAWLING AND RELOCATION

(HOPPER DREDGES ONLY) (SEE NOTE 3) 1 DAY $___________ $_______________

0007 BIRD MONITORING (SEE NOTE 4) 1 DAY $___________ $_______________

0008 STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________

0009 PARTNERING REGROUP MEETING 1 EACH $___________ $_______________

TOTAL BASE (LINE ITEMS 0001 THROUGH 0009) $_______________

OPTION A

CUT-C (HB) STATION 231+00 TO STATION 341+77.72

0010 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 266,000 CUBIC YARD $___________ $_______________

0011 TURBIDITY MONITORING JOB $_______________

0012 ENVIRONMENTAL SPECIES MONITORING JOB $_______________

TOTAL OPTION A (LINE ITEMS 0010 THROUGH 0012) $_______________

TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0012) $_______________

OPTION B

PORT SUTTON CHANNEL, PORT SUTTON

TURNING BASIN AND EAST BAY CHANNEL

0013 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 116,000 CUBIC YARD $___________ $_______________

0014 TURBIDITY MONITORING JOB $_______________

0015 ENVIRONMENTAL SPECIES MONITORING JOB $_______________

TOTAL OPTION B (LINE ITEMS 0013 THROUGH 0015) $_______________

TOTAL BASE PLUS OPTIONS A AND B (LINE ITEMS 0001 THROUGH 0015) $_______________

SEE NEXT PAGE FOR OPTIONS C AND D, AND NOTES.

GROUP1-18-R-J018 00010A-1 REVISION 0003

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR, MAINTENANCE DREDGING, 43 & 44-FOOT PROJECT,

TAMPA BAY CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS

AND UPPER CHANNELS, HILLSBOROUGH COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

OPTION C

CUT-A (TB), CUT-B (TB) AND CUT-C (TB)

0016 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 45,000 CUBIC YARD $___________ $_______________

0017 TURBIDITY MONITORING JOB $_______________

0018 ENVIRONMENTAL SPECIES MONITORING JOB $_______________

TOTAL OPTION C (LINE ITEMS 0016 THROUGH 0018) $_______________

TOTAL BASE PLUS OPTIONS A THROUGH C (LINE ITEMS 0001 THROUGH 0018) $_______________

OPTION D

CUT-D (TB), CUT-E (TB), CUT-F (TB) AND

GADSDEN POINT CUT

0019 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 62,000 CUBIC YARD $___________ $_______________

0020 TURBIDITY MONITORING JOB $_______________

0021 ENVIRONMENTAL SPECIES MONITORING JOB $_______________

TOTAL OPTION D (LINE ITEMS 0019 THROUGH 0021) $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0021) $_______________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE

DRAWINGS AND ACTUAL DREDGING.

(2) OFFER MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS".

(3) SEA TURTLE TRAWLING AND RELOCATION IS REQUIRED WHEN DIRECTED BY THE CONTRACTING

OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(4) BIRD MONITORING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION

01 57 20 ENVIRONMENTAL PROTECTION.

(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED SPECIES CONCERNS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. REQUIREMENTS FOR WORK STOPPAGES, DELAYS, OR OTHER IMPACTS ASSOCIATED WITH COMPLIANCE WITH SECTION 01 57 20 ENVIRONMENTAL

PROTECTION ARE NOT PAID FOR UNDER THIS LINE ITEM. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT

AND PAYMENT.

GROUP1-18-R-J018 00010A-2 REVISION 0003

FACTOR 1 – Availability of technically acceptable dredge(s). FACTOR 2 – Past performance.
FACTOR 1 - Availability of technically acceptable dredge(s).
Evaluation Method:
FACTOR 2 – Past performance.
Evaluation Method:
FACTOR 3 – Price.
THIS SOLICITATION IS FOR GROUP 1 – UNRESTRICTED