Jacksonville District

GROUP1-18-R-J018

Tampa Harbor, Maintenance Dredging, 43 & 44-Foot Project, Tampa Bay Cuts, Gadsden Point Cut, Hillsborough Bay Cuts and Upper Channels

Hillsborough County, Florida

Construction Solicitation and Specifications Task Order

09 JULY 2020

Tampa Harbor, M/D, 43 & 44-Foot Project, Tampa Bay Cuts, GROUP1-18-R-J018 Gadsden Point Cut, Hillsborough Bay Cuts and Upper Channels

DESIGN AUTHENTICATION

This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

WILLIAM L. REILLY, P.E.

CHIEF, WATERWAYS SECTION

DESIGN BRANCH, ENGINEERING DIVISION

ZEVENEY.DENNIS.J.124934

Digitally signed by

ZEVENEY.DENNIS.J.1249349085

Date: 2020.06.24 08:06:46 -04'00'

DENNIS J. ZEVENEY, P.E.

CHIEF, GEOSYSTEMS BRANCH

ENGINEERING DIVISION

DAVID DUDLEY, P.E.

CHIEF, DESIGN BRANCH

ENGINEERING DIVISION

KEITH.123008461

Digitally signed by

WIGNER.WILLIAM.KEITH.1230

084617 Date: 2020.06.25 14:39:15 -04'00'

LAUREEN A. BOROCHANER, P.E.

CHIEF, ENGINEERING DIVISION

REILLY.WILLIAM.L Digitally signed by

UKE.1527897994

REILLY.WILLIAM.LUKE.15278979

Date: 2020.06.23 17:28:17 -04'00'

DUDLEY.DAVID.F.13 Digitally signed by

99388569

DUDLEY.DAVID.F.1399388569

Date: 2020.06.25 07:20:25 -04'00'

WIGNER.WILLIAM.

GROUP1-18-R-J018 SF1442-A1

ADDENDUM TO THE STANDARD FORM 1442

TAMPA HARBOR MAINTENANCE DREDGING 43 & 44 FOOT PROJECT TAMPA BAY

CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS AND UPPER CHANNELS,

HILLSBOROUGH COUNTY, FLORIDA

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE

FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

W912EP18R0029, GROUP 1 – UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc.

(W912EP19D0029);Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034);

The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 – UNRESTRICTED DREDGING

MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:

FACTOR 1 – Availability of technically acceptable dredge(s).

FACTOR 2 – Past performance.

FACTOR 3 – Price.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.

GROUP1-18-R-J018 SF1442-A2

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and be available to meet the required period of performance.

FACTOR 2 – Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Evaluation Method:

Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No.

W912EP18R0029). Therefore, for this task order, all offerors will receive the Past Performance rating of "Acceptable".

Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance and Safety/Security will be reviewed from the aforementioned additional sources to determine if the offeror is “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

(3) Completed “Addendum to the Standard Form 1442” with the latest revision.

GROUP1-18-R-J018 SF1442-A3

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. Issued By:

USA Engineer District Jacksonville Contracting Division 701 San Marco Blvd.

Jacksonville, FL 32207-8175

Block 9. For additional information contact:

A. Name: Timothy Humphrey

Email Address: Timothy.G.Humphrey@usace.army.mil

B. Telephone No.: (904) 232-1072

Block 10. Magnitude of Construction: Between $10,000,000.00 and $20,000,000.00

Description of Work: See Technical Specifications Section 01 11 00 for description of work.

THIS SOLICITATION IS FOR GROUP 1 – UNRESTRICTED

You must be registered in the System for Award Management (SAM) in order to receive an award from this Notice of Intent. The SAM website is located at www.sam.gov.

The NAICS Code for this Notice of Intent is 237990 and the Small Business Size Standard is $27.5 million.

Block 11. The performance period is mandatory. (See FAR Clause 52.211-10 in Section 00700).

Block 12A. The Contractor must furnish any required performance and payment bonds: Yes

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Block 13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offers to perform the work required are due electronically at the following email address by 2:00 PM, local time on 10 August 2020: timothy.g.humphrey@usace.army.mil and send a carbon copy (cc) to tedra.n.thompson@usace.army.mil and griselle.gonzalez@usace.army.mil.

B. An offer guarantee is required. An electronic copy of the bid guarantee shall be submitted with the offer while the Original must be received within two calendar days of the proposal response date.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

mailto:Timothy.G.Humphrey@usace.army.mil http://www.sam.gov/ mailto:timothy.g.humphrey@usace.army.mil mailto:tedra.n.thompson@usace.army.mil mailto:griselle.gonzalez@usace.army.mil mailto:griselle.gonzalez@usace.army.mil

GROUP1-18-R-J018 SF1442-A4

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will berejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19 and 20A - 20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

Block 15. TELEPHONE NO. (Includearea code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS

(The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

GROUP1-18-R-J018 SF1442-A5

Block 20A.

Name and Title of Person

Authorized to Sign Offer (Type or print)

Block 20B.

Email Address

Block 20C.

Signature

Block 20D.

Offer Date

Block 26 --This Task Order will be administered by:

Tampa Resident Office 4211 W. Boy Scout Blvd Suite 170 Tampa, FL 33607

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR, MAINTENANCE DREDGING, 43 & 44-FOOT PROJECT,

TAMPA BAY CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS

AND UPPER CHANNELS, HILLSBOROUGH COUNTY, FLORIDA

GROUP1-18-R-J018 00010A-1

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

CUT-A (HB) AND CUT-C (HB)

STATION 0+00 TO STATION 231+00

0001 MOBILIZATION AND DEMOBILIZATION JOB $

0002 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 230,000 CUBIC YARD $ $

0003 TURBIDITY MONITORING JOB $

0004 ENVIRONMENTAL SPECIES MONITORING JOB $

0005 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWLING AND RELOCATION

(HOPPER DREDGES ONLY) (SEE NOTE 3) JOB $

0006 SEA TURTLE TRAWLING AND RELOCATION

(HOPPER DREDGES ONLY) (SEE NOTE 3) 1 DAY $ $

0007 BIRD MONITORING (SEE NOTE 4) 1 DAY $ $

0008 STANDBY TIME (SEE NOTE 5) 24 HOUR $ $

0009 PARTNERING REGROUP MEETING 1 EACH $ $

TOTAL BASE (LINE ITEMS 0001 THROUGH 0009) $

OPTION A

CUT-C (HB) STATION 231+00 TO STATION 341+77.72

0010 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 266,000 CUBIC YARD $ $

0011 TURBIDITY MONITORING JOB $

0012 ENVIRONMENTAL SPECIES MONITORING JOB $

TOTAL OPTION A (LINE ITEMS 0010 THROUGH 0012) $

OPTION B

PORT SUTTON CHANNEL, PORT SUTTON

TURNING BASIN AND EAST BAY CHANNEL

0013 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 116,000 CUBIC YARD $ $

0014 TURBIDITY MONITORING JOB $

0015 ENVIRONMENTAL SPECIES MONITORING JOB $

TOTAL OPTION B (LINE ITEMS 0013 THROUGH 0015) $

TOTAL OPTIONS A & B (LINE ITEMS 0001 THROUGH 0015) $

SEE NEXT PAGE FOR OPTIONS C AND D, AND NOTES.

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR, MAINTENANCE DREDGING, 43 & 44-FOOT PROJECT,

TAMPA BAY CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS

AND UPPER CHANNELS, HILLSBOROUGH COUNTY, FLORIDA

GROUP1-18-R-J018 00010A-2

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

OPTION C

CUT-A (TB), CUT-B (TB) AND CUT-C (TB)

0016 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 45,000 CUBIC YARD $ $

0017 TURBIDITY MONITORING JOB $

0018 ENVIRONMENTAL SPECIES MONITORING JOB $

TOTAL OPTION C (LINE ITEMS 0016 THROUGH 0018) $

TOTAL OPTIONS A THROUGH C (LINE ITEMS 0001 THROUGH 0018) $

OPTION D

CUT-D (TB), CUT-E (TB), CUT-F (TB) AND

GADSDEN POINT CUT

0019 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY - SEE NOTE 1) 62,000 CUBIC YARD $ $

0020 TURBIDITY MONITORING JOB $

0021 ENVIRONMENTAL SPECIES MONITORING JOB $

TOTAL OPTION D (LINE ITEMS 0019 THROUGH 0021) $

TOTAL BID (LINE ITEMS 0001 THROUGH 0021) $

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE

DRAWINGS AND ACTUAL DREDGING.

(2) OFFER MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS".

(3) SEA TURTLE TRAWLING AND RELOCATION IS REQUIRED WHEN DIRECTED BY THE CONTRACTING

OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(4) BIRD MONITORING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION

01 57 20 ENVIRONMENTAL PROTECTION.

(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED SPECIES CONCERNS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. REQUIREMENTS FOR WORK STOPPAGES, DELAYS, OR OTHER IMPACTS ASSOCIATED WITH COMPLIANCE WITH SECTION 01 57 20 ENVIRONMENTAL

PROTECTION ARE NOT PAID FOR UNDER THIS LINE ITEM. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT

AND PAYMENT.

SECTION 00010A, Attachment A

INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) July 28, 2020, Close of Business. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

The Solicitation Number is: GROUP1-18-R-J018

The Bidder Inquiry Key is: CYFKGN-4ZX8K7

Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:

1. Identify the Agency. This should be marked as USACE.

2. Email. Enter the email address you would like to use for communication.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. Identify the Agency. This should be marked as USACE.

3. Email. Enter the email address you used to register previously in ProjNet.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

GROUP1-18-R-J018 00010A-A1

THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC SECTIONS OF THE

ORIGINAL SOLICITATION NO.: W12EP18R0029

THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS SPECIFIC TASK ORDER

REQUEST FOR PROPOSAL NUMBER: GROUP1-18-R-J018

TASK ORDER PROJECT TITLE:

TAMPA HARBOR MAINTENANCE DREDGING 43 & 44 FOOT PROJECT TAMPA BAY

CUTS, GADSDEN POINT CUT, HILLSBOROUGH BAY CUTS AND UPPER CHANNELS,

HILLSBOROUGH COUNTY, FLORIDA

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

GROUP1-18-R-J018 Clause Addendum - 1

[T ype her e] [T ype her e] [T ype her e]

ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS THE REQUIRED FILL-

INS FOR FOLLOWING CLAUSES OF SECTION00100

ARE HEREBY PROVIDED:

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage termsfor the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

17.9% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Hillsborough County, Florida.

GROUP1-18-R-J018 00100-A1

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting: Yvette Powell via email at Yvette.L.Powell@usace.army.mil no later than Tuesday, 21 July 2020 at 2:00pm, local time.

All attendees must observe social distancing practices such as refraining from physical contact (hand-shaking) and maintaining a minimum distance of 6-ft between themselves and the next attendee, etc.

(c) Failure to contact the identified POC before the required date/time may result in your company being ineligible to attend a site visit. An attendance roster will be posted to the Government-wide Point of Entry (GPE) website (http://beta.sam.gov) upon the conclusion of all site visits.

(d) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 or Section 00 31 32 -- Geotechnical Data Report, of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)

(e) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only.

The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.

(End of provision)

GROUP1-18-R-J018 00100-A2

GROUP1-18-R-J018 00700-A1

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY

PROVIDED:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OFWORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 360 calendar days after the NTP. The time stated for completion shall include final cleanup of the premises.

The total completion time of 360 calendar days includes the following:

Base Bid 160 calendar days (includes 60 calendar days mob/demob)

Option A 75 calendar days

Option B 45 calendar days

Option C 35 calendar days

Option D 45 calendar days

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,010.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR

1989)

The Government may require the delivery of the numbered line items, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options (A, B, C & D) by written notice to the Contractor on or before November 30th 2020. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause).

GROUP2-18-R-J018 00700-A2

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general—

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title Tampa Harbor Maintenance Dredging 43 & 44 Foot Project Tampa Bay Cuts, Gadsden Point Cut, Hillsborough Bay Cuts and Upper Channels, Hillsborough County, Florida

File Drawing No.

GROUP1-18-R-J018 G-01

GROUP1-18-R-J018 00800-A1

ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY

PROVIDED:

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR

SUBCONTRACTORS

The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following: named dredge

ADDENDUM TO SECTION 00800A, WAGES DETERMINATIONS AND OTHER

ATTACHMENTS

THE FOLLOWING WAGES RATES ARE HEREBY INCORPORATED INTO THIS TASK

ORDER:

LIST OF CONSTRUCTION CONTRACT ATTACHMENTS

No. TITLE DATE NO. OF

PAGES

1 General Decision Number FL20200002 01/03/2020 5

2 General Decision Number FL20200003 01/03/2020 4

GROUP1-18-R-J018 00800A-1

NOTE NOTE NOTE

THIS PROJECT INCORPORATES THE STATEWIDE HEAVY DREDGING AND HOPPER DREDGING

WAGE DECISIONS FOR FLORIDA

EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF

$10.80 FOR 2020 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON

ACT FOR ALL HOURS PERFORMED ON THE CONTRACT IN CALENDAR YEAR 2020.

IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE DECISIONS

FURNISHED FOR THIS PROJECT, PLEASE CONTACT:

FRANRUSSELL,OFFICE OF COUNSEL,JACKSONVILLE DISTRICT, U.S. ARMY

CORPSOF ENGINEERS AT fran.g.russell@usace.army.mil

GROUP1-18-R-J018 00800A-2

mailto:fran.g.russell@usace.army.mil

"General Decision Number: FL20200002 01/03/2020

Superseded General Decision Number: FL20190002

State: Florida

Construction Type: Heavy Dredging

Counties: Florida Statewide.

Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020

* ENGI0025-002 10/01/2019

Dredging : (Hydraulic Dredges

Rates Fringes

Over 20"") CLASS A1 ................... $ 40.31 17.71+a CLASS A2 ................... $ 35.92 17.71+a CLASS B1 ................... $ 34.86 17.71+a CLASS B2 ................... $ 32.82 17.71+a CLASS C1 ................... $ 31.92 17.61+a CLASS C2 ................... $ 30.89 17.61+a CLASS D .................... $ 25.66 17.51+a

GROUP1-18-R-J018 00800A-3

http://www.dol.gov/whd/govcontracts

Hydraulic Dredges Under 20"" Cook ....................... $ 8.11 1.73+b Deckhand ................... $ 7.77 1.73+b Engineer ................... $ 9.59 1.73+b Launchman .................. $ 8.19 1.73+b Leverman ................... $ 10.03 1.73+b Mate ....................... $ 8.82 1.73+b Mess Cook .................. $ 7.71 1.73+b Messman & Janitor .......... $ 7.53 1.73+b Oiler & Fireman ............ $ 8.11 1.73+b Shoreman ................... $ 7.82 1.73+b Spider Barge Operator ...... $ 8.68 1.73+b Spill Barge Operator ....... $ 8.68 1.73+b Welder ..................... $ 9.79 1.73+b

CLASSIFICATIONS:

CLASS A1: Deck Captain, Leverman, Mechanical Dredge Operator.

Licensed Tug Operator over 1000 HP

CLASS A2: Crane Operator (360 swing) CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician, Licensed Boat Operator, Licensed Crew Boat Operator.

CLASS B2: Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.

CLASS C2: Boat Operator.

CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor, Drill Oiler

PREMIUMS: Additional 20% for hazardous material work

FOOTNOTE APPLICABLE TO ABOVE CRAFTS:

a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.

b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.

INCENTIVE PAY : (Add to Hourly Rate)

Operator (NCCCO License/Certification) $1.80; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80; Oiler QMED and Tankerman endorsement (USCG) $1.80; All classifications Tankerman endorsement only (USCG) $1.55; Deckhand or Mater AB w/Lifeboatman only (USCG) $1.80; Welder (ABS certification) $1.55

GROUP1-18-R-J018 00800A-4

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate

GROUP1-18-R-J018 00800A-5

changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted

GROUP1-18-R-J018 00800A-6

because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP1-18-R-J018 00800A-7

"General Decision Number: FL20200003 01/03/2020

Superseded General Decision Number: FL20190003

State: Florida

Construction Types: Heavy Dredging

Counties: Florida Statewide.

HOPPER DREDGE CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020

SUFL1993-010 05/24/1993

Rates Fringes

Self-Propelled Hopper Dredge Drag Tenders................$ 8.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

GROUP1-18-R-J018 00800A-8

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

GROUP1-18-R-J018 00800A-9

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial

GROUP1-18-R-J018 00800A-10

contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP1-18-R-J018 00800A-11

Tampa Harbor, M/D, 43 & 44-Foot Project, Tampa Bay Cuts, PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES (SEE BASE MATOC)

01 32 01.10 PROJECT SCHEDULE (Alternate) (SEE BASE MATOC)

01 33 00 SUBMITTAL PROCEDURES (SEE BASE MATOC)

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING (SEE BASE MATOC)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS (SEE BASE MATOC)

01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) (SEE

BASE MATOC)

01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY

CONTROL (SEE BASE MATOC)

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -

ULLAGE PROFILE

35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE

HYDRAULIC DREDGE

35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS

SECTION 00 31 21 Page 1

Designation: 872 6562 B TIDAL

PID: AG7604

Stamping: 6562 B 1977 Stability: Monuments of questionable or unknown reliability

Setting: Pavement (street sidewalk curb etc.)

Mark Condition: G

Description: SEE DESCRIPTION BELOW

-CONTINUED NEXT PAGE-

SECTION 00 31 21 Page 2

DESIGNATION - 872 6562 B TIDAL

PID - AG7604

TIDAL BM - This is a Tidal Bench Mark.

STATE/COUNTY- FL/HILLSBOROUGH

MARKER: TIDAL STATION DISK

SETTING: SET IN A PAVEMENT SUCH AS STREET, SIDEWALK, CURB, ETC.

SP_SET: SLAB

STAMPING: 6562 B 1977

MARK LOGO: NOS

MAGNETIC: NO MAGNETIC MATERIAL

STABILITY: MARK OF QUESTIONABLE OR UNKNOWN STABILITY

SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE

OBSERVATIONS - February 21, 2012

HISTORY - Date Condition Report By

HISTORY - 1977 MONUMENTED NOS

HISTORY - 20120221 GOOD PICKET

STATION DESCRIPTION

5.15 MI SOUTH FROM GIBSONTON.

BEGIN AT THE SOUTH END OF THE U.S. HIGHWAY 41 BRIDGE OVER THE ALAFIA

RIVER, GO 3.5 MILES SOUTH ON U.S. 41 TO THE JUNCTION OF PEMBROKE ROAD

(ROAD TO BIG BEND TERMINAL), GO 0.4 MILE WEST ON PEMBROKE ROAD TO A Y-FORK

(ENTRANCE ROAD TO AGRICO), TAKE RIGHT FORK AND GO 0.35 MILE WEST TO THE

AGRICO OFFICE, CONTINUE 0.6 MILE WEST ON AGRICO ENTRANCE ROAD TO A ROAD

LEADING NORTH TO THE DOCKS, GO 0.1 MILE NORTH ON THE DOCK ROAD TO THE

LOADING OFFICE, GO 0.2 MILE WEST ALONG THE DOCK TO ITS WEST END AND THE

MARK.

THE MARK IS ON A 12-FOOT BY 11-FOOT CONCRETE SLAB FOR A BOLLARD, 26.7 FEET

SOUTH OF THE CENTERLINE OF A BLACK-TOP ROAD, 98 FEET SOUTH-SOUTHEAST OF

TIDAL BENCH MARK 6562 A 1977, AND 4.7 FEET NORTH OF THE BOLLARD.

STATION RECOVERY (2012)

RECOVERY NOTE BY PICKETT AND ASSOCIATES 2012 (JM)

SECTION 00 31 21 Page 3

DESIGNATION - EDD 60

PID - AG5298

STATE/COUNTY- FL/PINELLAS

MARKER: SURVEY DISK

SETTING: SET IN A RETAINING WALL OR CONCRETE LEDGE

SP_SET: SEAWALL

STAMPING: EDD 60 1935 8.242 M.S.L.

MARK LOGO: USE

MAGNETIC: NO MAGNETIC MATERIAL

STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION

SATELLITE: THE SITE LOCATION WAS REPORTED AS NOT SUITABLE FOR SATELLITE

OBSERVATIONS - August 22, 2009

HISTORY - 1935 MONUMENTED DOD

HISTORY - 1966 GOOD CGS

HISTORY - 20090822 GOOD FLDEP

AT ST. PETERSBURG, NEAR THE SOUTHWEST CORNER OF THE ALBERT WHITTED

MUNICIPAL AIRPORT, NEAR THE NORTHEAST CORNER OF THE HOUSING AREA OF THE

UNIVERSITY OF SOUTH FLORIDA BAY CAMPUS, IN THE TOP NEAR THE NORTHEAST

CORNER OF CONCRETE SEA WALL, 3.6 FEET EAST OF THE WEST END OF THE SEA

WALL, 1.1 FEET NORTH OF THE NORTH END OF THE NORTH-SOUTH SEA WALL AND

ABOUT 1 FOOT ABOVE THE PARKING AREA.

STA…