Revision 0003 1 GROUP1-18-R-J015
ADDENDUM TO THE STANDARD FORM 1442
REVISION 0003, Dated 20 May 2020
Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St.
Johns County, Florida
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE
FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION
NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:
Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc.
(W912EP19D0029); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034);
The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).
PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE
PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING
MATOC POOL.
A Virtual Site Visit will take place via Webinar on 7 May 2020 @ 10:00 am, Local Time.
The webinar address is:
https://usace.webex.com/meet/jason.s.harrah
The Participant Audio Conference Access Information is:
USA Toll-Free: (877) 336-1280 USA Caller Paid/International Toll: (404) 443-6393 Access Code: 7256138
A Pre-Proposal Conference will be held on 12 May 2020 @ 10:00 am, Local Time via teleconference. The call-in number is: 877-336-1839, the Access Code is: 7686743, and the Security Code is: 1234. It is requested that an email be sent to brian.j.kilpatrick@usace.army.mil to confirm attendance by your organization.
EVALUATION: The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the three evaluation factors: Technical Merit, Past Performance and Price. To receive consideration for award, a rating of no less than mailto:brian.j.kilpatrick@usace.army.mil
4 Revision 0003 GROUP1-18-R-J015
"Acceptable" must be achieved for the Technical Merit Factor and Past Performance Factor.
Offerors are cautioned that award may not necessarily be made to the lowest price offeror or the highest technically rated offeror.
FACTOR 1 – Technical Merit FACTOR 2 - Past performance FACTOR 3 – Price
SUBMISSION REQUIREMENTS:
See Section 00100A -- Solicitation Provisions, for detailed submission requirements.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 7. ISSUED BY:
USA ENGINEER DISTRICT, JACKSONVILLE CONTRACTING DIVISION 701 SAN MARCO
BLVD JACKSONVILLE FL 32207-8175
Block 9 -- For additional information contact:
A. Name: Brian Kilpatrick
B. Email Address: brian.j.kilpatrick@usace.army.mil
C. Telephone No.: (904) 232-1792
Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED
IN THESE DOCUMENTS:
The work includes nourishing approximately 3.0 miles of shoreline along a portion of South Ponte Vedra and Vilano Beach in St. Johns County, Florida, between FDEP Range Monuments R-102.5 and R-117.5. The northernmost and southernmost approximate 1,000 feet of the fill area includes a taper transitioning the berm template back to the existing shoreline. The project includes construction of both a dune and beach berm. The landward portion of the beach berm will be flat and has a berm elevation of +8.0 feet North Atlantic Vertical Datum of 1988 (NAVD88). The seaward 80 feet of the berm will have a seaward slope of 1V:40H to an elevation of +6.0 NAVD88. The foreshore slope of the berm will be 1V:10H until it ties into existing grade. The width of the berm varies from the Construction Baseline as shown on the drawings. The dune crest varies in height between +15.0 feet and +18.0 feet NAVD88, as shown on the drawings reflecting the average elevation of the natural dune. The slope of the seaward face of the dune is 1V:3H. Planting of dune vegetation will take place following completion of constructed segments.
Sand for the project will be dredged from the Flood Shoal Complex. Project work also includes, but is not limited to, beach tilling/vibration, monitoring, turbidity monitoring, and environmental species monitoring.
DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.
MAGNITUDE OF CONSTRUCTION: Between $20,000,000 and $30,000,000.
mailto:brian.j.kilpatrick@usace.army.mil
5 Revision 0003 GROUP1-18-R-J015
THIS SOLICITATION IS FOR GROUP 1 – UNRESTRICTED MATOC POOL
You must be registered in the System for Award Management (SAM) in order to receive an award from this Notice of Intent. The SAM website is located at www.sam.gov.
The NAICS Code for this Notice of Intent is: 237990 and the Small Business Size Standard is:
$27.5 million.
Block 11 -- The Contractor shall begin performance within 60 calendar days and complete it within 310 calendar days after receiving notice to proceed. This performance period is mandatory. (See FAR Clause 52.211-10 in Section 00700).
Block 12A. The Contractor must furnish any required Performance and Payment Bonds: Yes
Block 12B. Performance and Payment Bonds are due within 10 calendar days after award.
Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:
A. Offers to perform the required work are due electronically at the following email address by 2:00 PM, local time on May 27, 2020: brian.j.kilpatrick@usace.army.mil and a carbon copy (cc) shall be sent to tedra.n.thompson@usace.army.mil and griselle.gonzalez@usace.army.mil
The Offeror’s proposal shall be submitted electronically, as described below. The use of hyperlinks in the proposal is prohibited. The offeror’s proposal is due no later than 2:00 PM, local time on 27 May 2020.
NOTE: The only authorized transmission method of proposals in response to the subject solicitation is electronically via SAFE online submission. No other transmission methods (Email, Facsimile, Regular mail, Hand carried, etc.) will be accepted.
The Offeror’s proposal must be received by the Government no later than the date/time specified in the solicitation and cited above. Offerors shall submit their proposal using the following link:
https://safe.apps.mil/
Please submit proposals utilizing the link above to Contract Specialist, Brian Kilpatrick at Brian.J.Kilpatrick@usace.army.mil and Contracting Officer, Tedra Thompson at Tedra.N.Thompson@usace.army.mil.
Instructions for submitting electronic proposals:
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, it is recommended that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Request for upload code:
Offerors must email Contract Specialist, William Wallace at william.j.wallace@usace.army.mil and to Contracting Officer, James Tracy at james.t.tracy@usace.army.mil Contract Specialist http://www.sam.gov/ mailto:brian.j.kilpatrick@usace.army.mil mailto:tedra.n.thompson@usace.army.mil mailto:griselle.gonzalez@usace.army.mil https://safe.apps.mil/ mailto:Brian.J.Kilpatrick@usace.army.mil mailto:Tedra.N.Thompson@usace.army.mil mailto:william.j.wallace@usace.army.mil mailto:james.t.tracy@usace.army.mil
6 Revision 0003 GROUP1-18-R-J015
Brian Kilpatrick at brian.j.kilpatrick@usace.army.mil and Contracting Officer, Tedra Thompson at tedra.n.thompson@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission.
File Description:
To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention. Each file name shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name and finally a brief file description.
EXAMPLES:
(1) “W912HP20R0020 RESPONSE Firm name Volume I.pdf”
(2) “W912HP20R0020 RESPONSE Firm name Volume II .pdf”
File Organization, Formatting and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger.
Pages shall be letter sized--larger page sizes (such as 11x17 foldouts, etc.) will be counted as two pages. Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)
Upload Completion & Deadline.
Interested parties shall submit responses no later than the date cited above. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within Safe.
Offerors should time their upload effort with prudence by not waiting until the last few minutes— this will allow for unexpected delays in the transmittal process. Submissions after the deadline may be emailed to Contract Specialist Brian Kilpatrick (Brian.J.Kilpatrick@usace.army.mil), but be advised they will be considered late and as such will be processed in accordance with FAR 15.208.
Submission shall be in Adobe PDF format.
Instructions to follow on the SAFE Website:
1. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file mailto:brian.j.kilpatrick@usace.army.mil mailto:tedra.n.thompson@usace.army.mil mailto:Brian.J.Kilpatrick@usace.army.mil
7 Revision 0003 GROUP1-18-R-J015 information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients for this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Brian Kilpatrick: Brian.J.Kilpatrick@usace.army.mil and the Contracting Officer is Tedra Thompson: Tedra.N.Thompson@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Bidder must enter the E-Mail address for both the Contracting Officer and Specialist. The Bidder can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. An Offeror can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents may more quickly upload into the SAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
Receipt of Submission:
For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.
B. An offer guarantee is required. An electronic copy of the bid guarantee shall be submitted with the offer while the Original must be received within two calendar days of the proposal submission date.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
mailto:Brian.J.Kilpatrick@usace.army.mil mailto:Tedra.N.Thompson@usace.army.mil
8 Revision 0003 GROUP1-18-R-J015
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A- 20D below:
Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)
DUNS: CAGE:
Block 15. TELEPHONE NO. (Include area code):
Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)
Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.
Block 18. The offeror agrees to furnish any required performance and payment bonds.
Block 19. Acknowledgment of Revisions
(The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)
REVISION
NO.
DATE
9 Revision 0003 GROUP1-18-R-J015
Block 20A.
NAME AND TITLE OF
PERSON
AUTHORIZED TO
SIGN
OFFER (Type or print)
Block 20B.
EMAIL ADDRESS
Block 20C.
SIGNATURE
Block 20D.
OFFER DATE
Block 26 --This Task Order will be administered by:
North Florida Area Office
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
SF 30 CONTINUATION SHEET
COASTAL STORM RISK MANAGEMENT PROJECT SOUTH PONTE VEDRA AND VILANO BEACH,
ST. JOHNS COUNTY, FLORIDA
GROUP1-18-R-J015 1 REVISION 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses:
N/A
Volume 2 of 2 – Technical Specifications:
DELETE Section 35 20 25 and REPLACE with the attached Section 35 20 25.
2. DRAWINGS:
N/A
(End of Summary of Changes)
Coastal Storm Risk Management Project South Ponte Vedra and Vilano Beach
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 25
BEACH FILL
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Acceptance Sections
1.3.2 Compensating Slopes
1.3.3 Construction Baseline (CBL)
1.3.4 Maximum Dredging Depth
1.3.5 Target Depth
1.3.6 Work Area
1.4 SYMBOL AND ACRONYM USE
1.5 SUBMITTALS
1.6 PROJECT SCOPE
1.6.1 Project Order of Work
1.6.2 Project Coordination
1.6.3 Project Work Permits and Responsibilities
1.6.3.1 Project Traffic and Navigation
1.6.4 Protection of Existing Structures from Construction Activity
1.6.4.1 Protection of Existing Utilities from Construction Activity
1.6.4.2 Damages to Adjacent Property and Structures
1.6.5 Project Work Violations
1.6.6 Project Final Cleanup
1.7 ENVIRONMENTAL PROTECTION
1.7.1 Pumping of Bilges
1.7.2 Fuel Oil Transfer Operations
1.7.3 Turbidity
1.7.4 Historical Period Shipwreck Sites
1.8 NOTIFICATION OF COAST GUARD
1.8.1 Navigation Aids
1.8.2 Dredging Aids
1.9 WORK AND ACCESS AREA
1.10 SIGNAL LIGHTS
1.11 CRANE AND DRAGLINE SAFETY REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 OVERALL WORK AREA PROVISIONS
3.1.1 Construction Plans and Contract Documents
3.1.2 Staging and Access Areas
3.1.2.1 Existing Conditions Documentation
3.1.3 Public Protection
3.1.3.1 Work Area Signs and Barriers
SECTION 35 20 25 Page 1 GROUP1-18-R-J015 Revision 0003
3.1.3.2 Dedicated Safety and Flag Person
3.1.4 Noise Control
3.1.4.1 Hauling and Excavating Equipment
3.1.4.2 Booster Pumps Noise Control
3.1.4.3 Sound Pressure Measurements
3.1.5 Buoy and Anchoring Inventory
3.1.6 Protection of Existing Vegetation
3.2 PROTECTION OF CULTURAL RESOURCE AREAS
3.3 EXCAVATION
3.3.1 General
3.3.2 Magnetic Anomalies
3.3.3 Probability of Rock in Borrow Area
3.3.4 Dredge Location Control
3.3.4.1 Other Dredge Type Control
3.3.5 Deduction for Nonconforming Work
3.4 Color-Coded Plot and Dredge Track Drawing Contents
3.5 TRANSPORT OF EXCAVATED MATERIALS
3.5.1 Hopper Dredge/Scow
3.5.1.1 Mis-Dump
3.5.2 Pipeline Transportation
3.5.2.1 Submerged Pipeline
3.5.2.2 Floating Pipeline
3.5.2.3 Upland Pipeline
3.5.2.4 Visual Inspection of Pumpout and Pipeline Locations
3.5.3 Spillage and Leakage
3.5.3.1 Hopper Dredge/Scows
3.5.3.2 Pipeline
3.5.4 Screening and Removal
3.6 BEACH FILL
3.6.1 General
3.6.2 Construction
3.6.2.1 Construction Equipment Limitations
3.6.2.2 Grade Stake Installation and Recovery Operations
3.6.2.3 Control of Fill
3.6.2.4 Longitudinal Dikes
3.6.2.5 Ramps and Walkways
3.6.3 Placement
3.6.3.1 Dressing for Payment
3.6.3.2 Dressing for Final Acceptance
3.6.3.3 Escarpments
3.6.4 Tolerances
3.6.5 Misplaced Materials
3.7 QUALITY CONTROL
3.7.1 Preparatory Inspection
3.7.2 Initial Inspections
3.7.3 Follow-up Inspection
3.8 QUALITY CONTROL FOR BEACH FILL
3.8.1 Compliance Criteria for Beach Fill Material
3.8.2 Beach Fill Observation and Sampling
3.8.3 Determination of Areal Extent of Noncompliant Beach Fill
3.8.4 Remediation
3.8.5 Noncompliant and Unacceptable Material Contingency Plan
3.9 INSPECTION
3.9.1 Quality Assurance Representative (QAR)
3.9.2 Failure to Comply
3.10 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 35 20 25 Page 2
SECTION 35 20 25
BEACH FILL
PART 1 GENERAL
1.1 SUMMARY
The project work covered by this section consists of furnishing all plant, labor, equipment, supplies, and material, and of performing all operations in connection with excavating, transporting, and placing beach fill along the project shoreline as indicated on the drawings, as described by applicable permits, and/or as specified herein. Related sections are
01 11 00 SUMMARY OF WORK, 01 57 20 ENVIRONMENTAL PROTECTION, 01 57 25
TURBIDITY AND DISPOSAL MONITORING, and 02 22 13 VIBRATION MONITORING
REQUIREMENTS FOR EXISTING STRUCTURES.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D422 (1963; R 2007) Particle-Size Analysis of Soils
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
1.3 DEFINITIONS
1.3.1 Acceptance Sections
Fill placement acceptance sections are defined as the portion of the renourished beach lying between two immediately adjacent pay profile lines.
1.3.2 Compensating Slopes
The allowance for pay volume above the fill tolerance to compensate for foreshore slope vacancies within the fill template due to sediment relocated by natural forces between the time of placement and payment surveys. For details, see plan sheet PAYMENT AND ACCEPTANCE PROFILES.
1.3.3 Construction Baseline (CBL)
To closely resemble the shoreline, a Construction Baseline (CBL) was established. The CBL determines the seaward/gulfward berm crest width and the construction stationing for pre- and post-payment surveys.
1.3.4 Maximum Dredging Depth
The maximum dredge depth is shown on the plans for the borrow area. The
SECTION 35 20 25 Page 3
Contractor cannot remove material below this depth. Contractor will not be penalized for locations in the borrow area which were already deeper than maximum depth prior to dredging. The Florida Department of Environmental Protection (FDEP) designated "disturbance depth" is a 2 foot layer located beneath maximum depth in which material can be agitated but not removed.
1.3.5 Target Depth
The borrow area and each subdivision shall be completely exacavated to the target depth before relocating the dredge to another borrow area or subdivision. The Contracting Officer may permit the Contractor to relocate to another borrow area or subdivision prior to complete clearance to target depth if 1) the remaning quantity is the result of minor side slope sloughing, 2) in isolated areas the remaining sand thickness cannot be efficiently removed after suitable effort by the contractor to clear the entire borrow area or subdivision to target depth, or 3) other reasons determined valid by the Contracting Officer.
1.3.6 Work Area
Work area is defined as the area where Contract work is to be performed, as shown on the contract drawings, impacted by contractor operations, and additional areas agreed by the Contracting Officer.
1.4 SYMBOL AND ACRONYM USE
/ = or b/c = because CBL = Construction Baseline FDEP = Florida Department of Environmental Protection
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Unless otherwise indicated below, Shop Drawings shall be submitted no later than 30 calendar days after Notice to Proceed.
Beach Fill Plan ; G, RO
The Contractor shall submit a Work Plan for review and approval by the Contracting Officer. The work plan shall include but not be limited to the following:
a. Excavation Depth Protection : Provide a detailed description of methods and equipment to be used for each operation, and the sequence of operations, including sketches showing how the Contractor will not excavate below the maximum excavation depth at the borrow area(s) as indicated in the contract drawings.
b. Buoy Log : The Contractor shall develop a method of inventory for all anchors, buoys, and buoy cables used in the
SECTION 35 20 25 Page 4 construction of the project. This record shall be used by the Contractor to recover all buoys and anchoring equipment at the completion of the project
c. Grade Stake Log: The Contractor shall provide a sample Grade Stake Log used on the project and indicate how the log is prepared and maintained to inventory the grade stakes used on the project. The log shall include information concerning the location, installation, and recovery of all grade stakes. During Construction the Contractor shall make this log available for review by the appropriate Government personnel upon request.
d. Staging and Access Area: The Contractor shall indicate if they plan on obtaining additional access or staging areas for their construction operations other than what is shown on the drawings. If the Contractor plans on obtaining additional access/staging areas, submit proposed drawings depicting the areas for Contracting Officer approval.
e. Public Protection: Provide a Contractor's plan for ensuring pedestrian, worker, and vehicular safety at each access location used by the Contractor. Submit means and methods for pedestrian protection during beach fill operations for review and approval by the Contracting Officer. Submit product information and methods of installation for orange safety fencing for crowd control.
Submit methods of staking in place and maintenance of system for duration of construction. Submit off-road trucking operation safety plan.
f. Vibration Control : See Section 02 22 13 VIBRATION MONITORING
REQUIREMENTS FOR EXISTING STRUCTURES.
Progress Maps; G, RO
Provide a progress schedule map of the contractor's design. The progress schedule map shall be a plan view drawing depicting the beach fill site and access areas to be used on the project. The map shall show all access/staging areas, R-monuments, adjacent street names, building names, and pipeline landings anticipated to be used on the project. For each AS, the information shall list the following: Anticipated quantity of material per acceptance section, projected dates for fill to be placed and completed. The map shall provide dates when access areas are to be used and ready for public use. The map will be color coordinated with the following color scheme: Red depicting an area not ready for construction; Orange depicting an area currently being worked, and Green meaning an area accepted by the Contracting Officer and ready for public use. The map shall be updated at least weekly and whenever significant changes occur to the projected dates.
Since the map will be used by the Government for coordination with the public and to track progress, the update shall be provided prior to the weekly project progress meeting.
Relocation of Navigation Aids
Within 7 calendar days following receipt of Notice of Award, the Contractor shall notify the Commander, Seventh Coast Guard . This notification shall be immediately followed by a formal written request with a copy to the Contracting Officer. The Contractor
SECTION 35 20 25 Page 5 shall also contact the U.S. Coast Guard at 305-415-6750 for information concerning the position to which the aids will be relocated.
Construction and Grade Stakes Recovery Plan ; G, RO
The Contractor shall submit a Construction and Grade Stakes Recovery Plan. The plan will outline the steps that the Contractor will implement to recover all the stakes used on the project. This plan will include the use of the Grade Stake Log submitted with the General Work Plan above. A sample plan is on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below, with further information provided in paragraph Grade stake installation and recovery operations.
Rock Removal Plan ; G, DO
The Contractor shall submit to the Contracting Officer a plan detailing the method for removal of rock. The plan shall also include the method for which the quantity of rock removed is measured and the location of rock disposal for acceptance by the Contracting Officer.
Noncompliant and Unacceptable Material Contingency Plan
Submit a Noncompliant Material Contingency Plan as indicated in paragraph QUALITY CONTROL FOR BEACH FILL below.
Electronic Tracking System Charts
The Contractor shall furnish required plotted charts to the Contracting Officer.
Dredge Location Control Color-Coded Plot
The Contractor shall furnish the required color-coded plots to the Contracting Officer with the Daily Report of Operations.
Quality Control for Beach Fill
Beach sediment samples shall be collected and stored a the on-site trailer for inspection. Refer to paragraph QUALITY CONTROL FOR BEACH FILL below for further details on sampling.
Equipment and Performance Data ; G, RO
The Contractor shall furnish proof of electronic positioning equipment calibration to the Contracting Officer.
Grade Stake Recovery ; G, DO
After completion of the project, the Contractor shall provide a letter to the Contracting Officer certifying that all grade stakes have been recovered in accordance with the Contractor's approved Construction and Grade Stake Recovery Plan. With the certification, the Contractor shall also furnish the completed Grade Stake log to the Contracting Officer. Grade stake installation and recovery operation. Refer to paragraph below.
SECTION 35 20 25 Page 6
Placement Plan for work adjacent to structures/seawalls ; G, DO
For government review and in accordance with vibration control and monitoring plan. To included detailed placement method and type of equipment.
Buoy and Anchoring Inventory Recovery ; G, DO
After completion of the project, the Contractor shall provide a letter to the Contracting Officer certifying that all anchors, buoys, buoy cables used in the construction of the project have been recovered in accordance with the Contractor's approved Anchor and Buoy Recovery below. With the certification, the Contractor shall also furnish the completed Buoy and Anchoring Inventory Record.
Notification of Discovery of Historical Period Shipwreck Sites
The Contractor shall immediately notify the Contracting Officer if any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered.
Daily/Monthly Report of Operations
The Contractor shall prepare on RMS and submit two (2) hard copies of the Daily Report of Operations, using either ENG Form No. 27A or ENG Form No. 4267, for each dredge and/or unloader working. The Daily Report of Operations will include the Dredge Location Control Color-Coded Plot. This report shall be submitted on a daily basis and not in groups (groups = multi-days reports packaged together at one time). In addition to the daily report, the Contractor shall prepare a Monthly Report of Operations for each month or partial month's work on either ENG Form No. 27A or ENG Form No. 4267. The monthly report shall be submitted on or before the 7th of each month, consolidating the previous month's work. Upon completion of the job, the Contractor shall submit a consolidated job report, combining the monthly reports. The Contractor shall distribute one copy of each report to the District Engineer, ATTN: CESAJ-EN-C; U.S. Army Engineer District, Jacksonville, P.O. Box 4970, Jacksonville, Florida 32232-0019.
Reports shall be submitted on a monthly basis with daily reports accompanying the monthly report and job report.
Additionally, one copy of these forms shall be maintained by the Contractor on the dredge(s) for the Contracting Officer's inspection purpose. Further instructions on the preparation of the reports will be furnished at the Preconstruction Conference.
Notice of Misplaced Material
The Contractor shall notify the U.S. Coast Guard Marine Safety Office of any misplaced material as stated in Clause OBSTRUCTION OF NAVIGABLE WATERWAYS of Section 00700 CONTRACT CLAUSES.
Declaration of Inspection
Refer to paragraph FUEL OIL TRANSFER OPERATIONS below for submittal.
SECTION 35 20 25 Page 7
Placement Plan ; G
Pipeline Corridor Plan
Provide a detailed map of the Contractor's placement of pipeline from the Inlet Complex to the project area. Pipeline Corridor Plan shall show all planned sand ramp walkways, R-monuments, adjacent street names, and pipeline landings anticipated to be used. Additionally, provide a detailed description of methods and equipment to be used for operation nearby the Villano Groin.
SD-06 Test Reports
Sound Pressure Measurements ; G, RO
Refer to Paragraph SOUND PRESSURE MEASUREMENTS.
1.6 PROJECT SCOPE
The Contractor shall provide the dredge and support vessels, labor, equipment, supplies, and materials to perform all operations for excavating, transporting, placing, dressing and grading (and possible tilling) beach fill on the beaches as indicated in the drawings and further specified herein. The Contractor shall accomplish the work in such a manner so as to minimize disruption to road and maritime traffic or use of the public beach as well as minimize impacts to existing infrastructure.
1.6.1 Project Order of Work
At the Preconstruction Conference, the Contractor shall propose the order in which the work will be performed, including the anticipated progression excavation of the borrow area(s) and fill placement. The Contractor shall dredge the following borrow areas in any order prior to commencing excavation of the Davis Shoal. The Contractor shall exhaust a borrow area to the target depth prior to requesting permission from the Contracting Officer to use a subsequent borrow area. At a minimum, the Contractor shall exhaust the IWW Widener to the target depth as part of the initial project. The IWW Shoal Borrow Area (north of the Usina Bridge) is included as a sand source, but is not required to be utilized as part of this contract.
IWW Widener Borrow Area North Flood – A Borrow Area North Flood – B Borrow Area
Within each fill placement site, the Contractor shall begin their filling operations at any point along the project beach, but the Contractor shall maintain a continuous filling operation without any intervening gaps.
1.6.2 Project Coordination
Project coordination with the Contracting Officer shall occur during all phases of construction. Coordination also includes but is not limited to coordinating with local officials including police, Public, FDEP, US Coast Guard, and others as agreed during coordination meetings. See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE PROCEDURES and
SECTION 35 20 25 Page 8
Paragraph COORDINATION MEETING of Section 01 45 05 DREDGING/BEACH FILL
PLACEMENT - CONTRACTOR QUALITY CONTROL.
1.6.3 Project Work Permits and Responsibilities
The Contractor's attention is directed to the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES and paragraph PERMITS AND AUTHORIZATIONS of Section 01 57 20 ENVIRONMENTAL PROTECTION. Any other licenses or approvals required for the prosecution of the work shall be secured and paid for by the Contractor. The Contractor shall obtain any and all approvals required to conduct work in the Atlantic Ocean.
1.6.3.1 Project Traffic and Navigation
The Contractor shall so conduct their operations that they shall not close any thoroughfare nor interfere in any way with traffic on railway, highways, or on water, without the written consent of the Contracting Officer. The regulations the Contractor shall adhere to are those established by, but not necessarily limited to, the Department of the Navy, U.S. Coast Guard, Department of the Army, American Bureau of Shipping, Florida Department of Environmental Protection, Florida Department of Transportation, Florida Law Enforcement Agencies, county and municipal.
1.6.4 Protection of Existing Structures from Construction Activity
The Contractor shall be responsible for determining and documenting the pre-construction condition of existing structures within the project area. The Contractor shall take appropriate measures to prevent damage to any structures during construction, and for performing a post-construction verification inspection of those structures previously inspected. Refer to Section 02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES for further details and guidelines.
1.6.4.1 Protection of Existing Utilities from Construction Activity
It is the Contractor's responsibility to investigate the location and depths of all utility crossings. The Contractor shall take precautions against damages which might result from his operations, especially the sinking of dredge spuds and/or anchors into the channel bottom, in the vicinity of the utility crossings. If any damage occurs as a result of his operations, the Contractor will be required to suspend dredging until the damage is repaired and approved by the Contracting Officer. Costs of such repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.
1.6.4.2 Damages to Adjacent Property and Structures
Any damage to private or public property within the project boundaries, including staging site(s) and work and access areas/roads, shall be repaired promptly by the Contractor. Any damage as a result of the Contractor's operations shall be repaired at no cost to the Government.
The Contractor will not receive final payment until all damages are restored to the satisfaction of the Contracting Officer.
1.6.5 Project Work Violations
Work done in violation of these specifications or a verbal or written stop order of the Contracting Officer will be considered as unsatisfactory
SECTION 35 20 25 Page 9 progress for purposes of progress payments in accordance with clause PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700
CONTRACT CLAUSES.
1.6.6 Project Final Cleanup
Final cleanup, as stated in the paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK of Section 00700 CONTRACT CLAUSES, shall include the removal of all of the Contractor's plant and equipment either for disposal or reuse. Plant and/or equipment to be disposed of shall ONLY be disposed of in a manner and at locations approved by the Contracting Officer.
Unless otherwise approved in writing by the Contracting Officer, the Contractor will not be permitted to abandon pipelines, pipeline supports, pontoons, or other equipment in the disposal area, pipeline access areas, water areas, or other areas adjacent to the work site. Pilings and any other debris removed or created as a result of the execution of this contract shall be disposed of in a manner and at locations approved by the Contracting Officer.
1.7 ENVIRONMENTAL PROTECTION
The Contractor shall protect the environment during all phased of work.
See Section 01 57 20 ENVIRONMENTAL PROTECTION for additional details.
1.7.1 Pumping of Bilges
Contractors are warned that pumping oil or bilge water containing oil into navigable waters, or into areas which would permit the oil to flow into such waters, is prohibited by Section 13 of the River and Harbor Act of 1899, approved 3 March 1899 (30 Stat. 1152; 33 U.S.C. 407). Violation of this prohibition is subject to penalties provided under the referenced Act.
1.7.2 Fuel Oil Transfer Operations
In accordance with U.S. Coast Guard regulations (33 CFR 156.120), couplings used in fuel oil transfer operations on any vessel with a capacity of 250 or more barrels of oil shall be either a bolted or full-threaded connection; or a quick-connect coupling approved by the Commandant; or an automatic back-pressure shutoff nozzle used to fuel the vessel. An executed fuel oil transfer (Declaration) form signed by the tanker operator shall be submitted to the Contracting Officer for each refueling operation. The U.S. Coast Guard shall also be notified prior to any refueling. A copy of the Declaration of Inspection for Refueling is on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below.
1.7.3 Turbidity
Excavation, transport, and filling operations shall be performed in a manner that will minimize turbidity. The Contractor shall meet the requirements to maintain the quality of the State's waters as stipulated in Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING, project permits and in the Florida Administrative Code Rule 62-3.121. The Contractor will be required to make inspections, measurements and observations required by those regulations and the FDEP permit in the vicinity of the dredge and at the placement site (beach).
SECTION 35 20 25 Page 10
1.7.4 Historical Period Shipwreck Sites
If any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered, the Contractor acknowledges that:
a. The site(s), articles, or other materials are the property of the State of Florida, with title vested in the Department of State, Division of Historical Resource; and
b. shall immediately notify the Contracting Officer.
Refer to subparagraph "Preservation and Recovery of Historic, Archeological, and Cultural Resources" of Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.8 NOTIFICATION OF COAST GUARD
1.8.1 Navigation Aids
Navigation aids located within or near the areas required to be dredged will be removed, if necessary, by the U.S. Coast Guard in advance of dredging operations. The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid to navigation.
1.8.2 Dredging Aids
The Contractor shall obtain approval from the U.S. Coast Guard for all buoys, dredging aid markers to be placed in the water, and dredging aid markers affixed with a light prior to the installation. Dredging aid markers and lights shall not be colored or placed in a manner that they will obstruct or be confused with navigation aids.
1.9 WORK AND ACCESS AREA
Please provide any site specific notice of interest for the Contractor.
Anything that early on brings their attention to the work, but do not provide guidance on execution (just general information). Comply with work and access area requirements indicated herein and in Section 01 57 20
ENVIRONMENTAL PROTECTION.
1.10 SIGNAL LIGHTS
The Contractor shall display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals. Lights and day signals shall be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations.
Lights shall be displayed on dredge pipe lines, and day signals shall be displayed by vessels of more than 65 feet in length and floating plant vessels moored or anchored in a fairway or navigable channels where other vessels pass. Lights and days signals shall also comply with the requirements of Section 01 57 20 ENVIRONMENTAL PROTECTION, the Secretary of the Army, and Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-Inland (COMDTINST M16672.2), or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable.
SECTION 35 20 25 Page 11
1.11 CRANE AND DRAGLINE SAFETY REQUIREMENTS
All cranes and draglines used in performing the Work set forth in these specifications shall comply with EM 385-1-1 . Please refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS for further details.
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 OVERALL WORK AREA PROVISIONS
The construction and borrow area limits available to the Contractor for accomplishing the work are shown on the drawings. The Contractor shall accomplish the work in such a manner so as to minimize disruption to road traffic and use of the public beach as well as keep all work areas in a neat, orderly and in a safe manner. The Contractor will be required to maintain all access roads and all other work areas within or without the project boundaries free from dust and noise which would cause a hazard or nuisance to others.
3.1.1 Construction Plans and Contract Documents
A minimum of one (1) complete set of construction plans (drawings) and contract documents (with permits and Notice to Proceed placards) shall be kept in the construction site field office. The dredge must have a complete set of drawings, including borrow area coordinates, at all times to avoid dredging outside of the borrow areas.
3.1.2 Staging and Access Areas
See Section 01 50 02 TEMPORARY CONSTRUCTION FACILITY. The final limits of the staging and access areas indicated on the drawings shall be field-determined by the Contracting Officer in coordination with the local sponsor and the Contractor. It shall be the responsibility of the Contractor to investigate and obtain any additional areas which may be necessary for their construction operations. The additional areas will be subject to the approval of the Contracting Officer.
For staging areas on the beach, construction equipment shall be located off the beach as much as practicable during sea turtle monitoring. Regardless of time, all construction pipes that are placed on the beach shall be located as far landward as possible without compromising the integrity of the existing or reconstructed dune system. Temporary storage of pipes shall be off the beach to the maximum extent possible. If the pipes are placed on the beach, they shall be placed in a manner that will minimize the impact to nesting habitat and shall not compromise the integrity of the dune systems.
The staging areas shall not be used for stockpiling of beach fill material.
3.1.2.1 Existing Conditions Documentation
At all access sites and staging areas to be used, the Contractor shall:
a. Photo-document the condition of the access location prior to disrupting the site.
SECTION 35 20 25 Page 12
b. Limit access width through existing vegetation to 20 feet or less.
c. Replace any fencing, signage or curbing disturbed by the Contractor's activities.
d. Restore and revegetate the access route with native dune plants subject to the approval of the Contracting Officer. Revegetation of access and staging areas shall be with sod (non-dune areas) or viable plant units (dune areas) at 18-inch maximum spacing with species and diversity equivalent to preconstruction conditions. Revegetation shall include a survival warranty of 90 percent of the plant material for 90 days. Vegetation shall be installed with fertilization and irrigation, or with initial irrigation, fertilization and approved water-absorbent polymeric gels, at no additional expense to the Government. Shrubs and trees shall be replaced to preconstruction conditions per the requirements of Section 01 57 20 ENVIRONMENTAL
PROTECTION.
3.1.3 Public Protection
a. The Contractor will be required to exclude the public for safety purposes from the work areas in the vicinity of the hydraulic fill placement, grading and transporting operations, or any other area which may present a safety risk to the public, such as the discharge end of their pipeline and all associated equipment such as fuel tanks, booster bumps, etc.
b. All equipment transiting the beach outside the Contractor's designated work area (i.e. beyond the beach fill discharge areas that are otherwise already temporarily closed to public with orange safety fencing) shall be escorted by a safety vehicle (e.g. ATV, utility vehicle, or truck). The Contractor must access the following web address and complete the necessary application/training prior to any vehicular access to the beach:
http:/www.sjcfl.us/HCP/CoastalConstruction.aspx
c. The Contractor shall minimize the areas closed to the public.
d. The Contractor shall be responsible for providing and maintaining all water and land access routes necessary for their equipment and plant to and from the work sites.
e. The Contractor shall ascertain the environmental conditions which can affect water and land access, such as climate, terrain, winds, current, waves, swells, depths, shoaling, and scouring tendencies.
3.1.3.1 Work Area Signs and Barriers
The Contractor shall install warning signs to warn the public and all commercial and recreational boats of all construction activities.
a. Any existing signs, buoys or other structures within the work lines shall be protected and/or removed and later replaced by the Contractor as directed.
b. The Contractor shall be required to erect, maintain, and move as necessary, a restrictive barrier around the active construction zone
SECTION 35 20 25 Page 13 including the area of discharge of the hydraulic pipeline (or other mechanical off loader), where bulldozers are working, or any other active area where Work may present a safety hazard to the public. In the vicinity of the discharge, the barrier shall be constructed so as to prevent the public from approaching the discharge from any direction closer than 100 feet , and will provide an area sufficient in size for the safe progression of the Work. The Contractor shall post signs in a conspicuous manner designating the closed area.
c. The Contractor shall post signs in a conspicuous manner stating
"DANGER - HIGH PRESSURE DISCHARGE FROM DREDGE".
d. Enforcement shall be the Contractor's responsibility at no additional cost to the Government. The enforcement shall be coordinated with local enforcement agencies, and will be subject to approval of the Contracting Officer.
3.1.3.2 Dedicated Safety and Flag Person
The Contractor shall have a dedicated safety and flag person on site at all times, whose sole responsibility is preventing the public from entering the work area. Additionally, the Contractor shall place a safety person at the discharge end of the disposal pipeline. The safety person shall be present at all times during discharge operations and will maintain radio communication between the dredge and the disposal operation.
3.1.4 Noise Control
The Contractor must adhere to all local noise ordinances, including St.
Johns County Ordinance No. 2015-19, or any new/updated noise ordinances.
3.1.4.1 Hauling and Excavating Equipment
All hauling and excavation equipment including dredges used on this work shall be equipped with satisfactory mufflers or other noise abatement devices. The Contractor shall conduct his operations so as to comply with all federal, state, and local laws or ordinances pertaining to noise abatement. The use of horns, bells, or the use of whistle signals shall be held to the minimum necessary in order to insure as safe and as quiet an operation as possible.
3.1.4.2 Booster Pumps Noise Control
Booster pumps used on this work shall be equipped with satisfactory mufflers and/or other sound abatement devices to reduce engine noise. A sound barrier will be constructed landward of booster pumps in order to reflect noise waterward. Booster pumps shall not be allowed within 300 feet of residential areas, but will be allowed on or adjacent to the public beach.